HomeMy WebLinkAbout20210782 Ver 1_Buffalo Branch Mitigation Transfer Certificate_20220719ores
Mitigation Credit Transfer Certificate
Prepared by
EBX-NE USE I, LLC
July 19, 2022
Lennar Carolinas, LLC
1100 Perimeter Park Drive, Suite 112
Morrisville, NC 27560
Attn: Stephen Dorn
Buffalo Branch Bank Parcel ID: DWR Project # 2014-0704v2
Riparian Buffer Credits Purchased: 505.18 (ft)
8 digit-HUC — 03020201
Neuse River Basin
Project Name: Cayden Cove, DWR Project # 20210782
You have elected to fulfill your permitted buffer mitigation requirements for the Cayden Cove, project by
paying into the Neuse Riparian Buffer and Nutrient Bank (Buffalo Branch Site).
This Bank has received full payment for buffer mitigation for the above referenced project. Riparian buffer
impacts occurred in the Neuse River Basin. The amount of buffer mitigation required is specified and
verified by DWR in project #20210782 and is 39,426.00 ft2. The Buffalo Branch site is providing 339.08
ft2, Buffalo Branch Preservation is providing 166.10 ft2, the Wolf King site is providing 3,086.00 ft2, Wolf
King Preservation is providing 66.85 ft2, the Poplar Creek Preservation site is providing 4,414.97 ft2, the
Hatley site is providing 8,328.00 ft2, and the Thunder Swamp Phase II site is providing 23,025.00 credits
for the full amount needed.
You must also comply with any other state, federal or local government permits, or authorization
associated with this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks.
This payment into the Bank is not transferable. If you have any questions or need additional information,
please contact me at 919-209-1055 or astaley@res.us.
Sincerely,
Amy Staley
Credit Sales Manager
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
DWR — Colleen Cohn
S&EC — Camden Brunick
Resource Environmental Solutions, LLC . 3600 Glenwood Avenue, Suite 100 . Raleigh, NC 27612