Loading...
HomeMy WebLinkAbout20141039 Ver 1_More Info Requested_20141023Pat McCrory Governor �•et•ry October 23, 2014 CERTIFIED MAIL: RETURN RECEIPT REQUESTED 7014 0150 0000 7802 4768 ` United States Coast Guard, Civil Engineering Unit Cleveland CDR Pete Carroll 1240 East Ninth Street, Room 2179 Cleveland, Ohio 44199 -2060 John E. Skvarla III DWQ Project # 14 -1039 Pasquotank County Subject Property: USCG Base Elizabeth City —MWR Boat Ramp Pasquotank River Basin, Pasquotank River [PAS 50, 30- 3 -(12); SB] REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Carroll: On September 26, 2014, the Division of Water Resources (DWR) received your application dated September 3, 2014 for proposed dredge impacts at the MWR boat ramp. The DWR has determined that your application was incomplete and /or provided inaccurate information as discussed below. Please note that in accordance with 15A NCAC 02H .0502 the DWR requires additional information in order to process your application. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and 15A NCAC 2B .0200 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Please be advised that in accordance with 15A NCAC 02H .0506, it is necessary that the Environmental Assessment (EA) be published before this Office can issue a General Certification (GC) for the subject project. It is allowable to issue a GC if the EA is published in Draft form. This Office should be contacted as soon as the results of the EA are published to resume the permitting process. Division of Water Resources - Water Quality Regional Operations Section - Washington Regional Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252- 946- 648I\Paz: 252- 975 - 3716 \Intemet w .ncdenr.gov Page 2 of 2 Please respond in writing to the DWR within 30 days of the date of this letter to with the requested information. If we do not hear from you within 30 days, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWR. Please call Roberto Scheller of the Washington Regional Office at 252- 948 -3940 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Robert Tankard Assistant Regional Supervisor Division of Water Resources cc: Jennifer Jones, AECOM, email: Jennifer.Jones @aecom.com Bill Biddlecome, USACE Washington, Regulatory Field Office DWQ Webscape Unit File Copy