HomeMy WebLinkAbout20141039 Ver 1_More Info Requested_20141023Pat McCrory
Governor
�•et•ry
October 23, 2014
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
7014 0150 0000 7802 4768 `
United States Coast Guard, Civil Engineering Unit Cleveland
CDR Pete Carroll
1240 East Ninth Street, Room 2179
Cleveland, Ohio 44199 -2060
John E. Skvarla III
DWQ Project # 14 -1039
Pasquotank County
Subject Property: USCG Base Elizabeth City —MWR Boat Ramp
Pasquotank River Basin, Pasquotank River [PAS 50, 30- 3 -(12); SB]
REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Carroll:
On September 26, 2014, the Division of Water Resources (DWR) received your application dated
September 3, 2014 for proposed dredge impacts at the MWR boat ramp. The DWR has
determined that your application was incomplete and /or provided inaccurate information as
discussed below. Please note that in accordance with 15A NCAC 02H .0502 the DWR requires
additional information in order to process your application. Therefore, unless we receive the
additional information requested below, we will have to move toward denial of your application
as required by 15A NCAC 2H .0506 and 15A NCAC 2B .0200 and will place this project on hold as
incomplete until we receive this additional information. Please provide the following
information so that we may continue to review your project.
Additional Information Requested:
1. Please be advised that in accordance with 15A NCAC 02H .0506, it is necessary that the
Environmental Assessment (EA) be published before this Office can issue a General
Certification (GC) for the subject project. It is allowable to issue a GC if the EA is published
in Draft form. This Office should be contacted as soon as the results of the EA are published
to resume the permitting process.
Division of Water Resources - Water Quality Regional Operations Section - Washington Regional Office
943 Washington Square Mall, Washington, NC 27889
Phone: 252- 946- 648I\Paz: 252- 975 - 3716 \Intemet w .ncdenr.gov
Page 2 of 2
Please respond in writing to the DWR within 30 days of the date of this letter to with the
requested information. If we do not hear from you within 30 days, we will assume that you no
longer want to pursue this project and we will consider the project as withdrawn. This letter
only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are
not authorized (at this time) by the DWR. Please call Roberto Scheller of the Washington
Regional Office at 252- 948 -3940 if you have any questions regarding or would like to set up a
meeting to discuss this matter.
Sincerely,
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
cc: Jennifer Jones, AECOM, email: Jennifer.Jones @aecom.com
Bill Biddlecome, USACE Washington, Regulatory Field Office
DWQ Webscape Unit
File Copy