Loading...
HomeMy WebLinkAboutNCC202908_NOT Closeout Documents_20220922North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 FB-PN 80774 SOF SERE Resistance County: Scotland Project: Training Complex River basin: Lumber Person financially responsible: US Army Public Works Department - Monica Project #: SCOTL-2020-007 Stephenson, Directorate NCC202908 Address: 2175 Reilly Road, Stop A, Fort Bragg, NC 1. Project Location: Rowe Lane, Fort Bragg Pictures: No 2. Weather and soil conditions: Cloudy/partly sunny workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: September 07, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Lee Ward Date of inspection: September 07, 2022 Time arriving on site: 10:00 AM Time leaving site: 10:10 AM cc: