HomeMy WebLinkAboutNCC204834_NOT Closeout Documents_20220922North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Onslow Project: PNG Pender Onslow Pipeline - Section River basin: White Oak
Person financially responsible: Piedmont Natural Gas Company -Jeremy Meads Project #: ONSLO-2021-019
Address: PO Box 33068, Charlotte, NC 28210
1. Project Location: Hwy 17, Holly Ridge
Pictures: No
2. Weather and soil conditions: sunny and dry
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: September 19, 2022
10. Comments: Project appears complete and stabilized. File will be closed.
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Trent James Others present:
Date of inspection: September 16, 2022 Time arriving on site: 2:30 PM Time leaving site: 2:45 PM
cc:
Yes