HomeMy WebLinkAboutNCC203371_NOT Closeout Documents_20220922North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Onslow Project: PNG Onslow County Laydown Yard River basin: Cape Fear
Person financially responsible: Piedmont Natural Gas Company, Inc. - Kewin Project #• ONSLO-2021-006
Thomas, Project Manager
Address: 1321 South 1 Oth Street, Wilmington, NC 28401
1. Project Location: Drag Strip Road/hwy 17, Holly Ridge
Pictures: No
2. Weather and soil conditions: Sunny and workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None Title:
Inspection report: Sent Report Date given/sent: December 09, 2021
9. Corrective action needed:
10. Comments: Project appears complete and stabilized. File will be closed. Any further/future development
will require a new permit application to be submitted.
Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGOI) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available
at: https:Hedocs.deq.nc.gov/Forms/NCG0I-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Connor Musial� Others present:
Date of inspection: December 06, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:10 PM
cc: