Loading...
HomeMy WebLinkAbout20200758 Ver 2_U6010_Permit Package Buffer_20200505_202209220 0 �o U See Sheet 1A For Index of Sheets See Sheet 1 B For Conventional Symbols See Sheets I U- 9 and 1 C-y l or Survey Control Sheets 1 EION 1 COLLEGE I' a �n`4N , r o r' a wade d PROJECT Coble Dr 3 SITE US 70 ,S. Church St o �� a RUNMoH cir ur,�rs 8 ,� IU 0 I Z � v * DENOTES SIGNAL THIS PROJECT IS LOCATE[ BOUNDARIES OF THE CIT IS NOT LOCATED WITHUN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS 01 ALAMANCE COUNTY BUFFER DRAWING SHEET 1 OF 4 ITA�o� �Up-6010 p 6� DATE: 05-05-2020 47145.1.1 PE 47145.2.1 ROWAJTIL 47145.3.1 CONST I LOCATION: US 70 (S. CHURCH ST.) FROM WEST OF UNIVERSITY DR. Z (SR 1311) TO WESTBROOK AVE. (SR 1309) IN BURLINGTON I g TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNALS 3 CULVERT EXTENSIONS AND PAVEMENT MARKING o la O Z cle BUFFER IMPACTS PERMIT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of: HYDRAULICS ENGINEER ADT 2020 = 12,500 SUNWEOEsicNCRouPa�. 50 25 0 50 loo ADT 2040 = 14,400 x� °�©��� K = 13 D�0 Q �© PLANS LENGTH OF ROADWAY TIP PROJECT U-6010 = 0.884 MILES 2018 STANDARD SPECIFICATIONS P.L. D = 50 D �0 SIGNATURE: 50 25 0 50 100 T = 3 % RIGHT OF WAY DATE. DAVID L. WILVER PE q s PROJECT LxcrNLLR ROADWAY DESIGN ENGINEER a V = 50 MPH TOTAL LENGTH OF TIP PROJECT U-6010 = 0.884 MILES MAY 31, 2019 PROFILE (HORIZONTAL) * TTST =2 DUAL 1 DAVID GARRETT 10 5 0 10 20 FUNC CLASS = LETTING DATE. PROJECT DESIGN ENGINEER URBAN ARTERIAL OCTOBER 20, 2020 di PROFILE (VERTICAL) NCDOT CONTACT rL SIGNATURE: ET STONEMOR NORTH CAROLINA LLC /LOUISE B HAZELWOOD PLANS PBLPAI D BY : PROJECT REFERENCE NO. SHEET NO. 6 LIFE ESTATE DETAIL 1 DETAIL 2 4 BUFFER DRAWING pqp�®NS U-60/0 a SPECIAL LATERAL BASE DITCH STANDARD BASE DITCH (Nat to scalcj O INa�ro s,olel RALEicH, NORTH cAROLiNA, cEi9i asa-i3as RhV SHEET NO. ELK SHEET 2 OF 4 0 WALL � ) L STRIES RETIREMENT Noroml -Fill N�w�,d Nm�,°i rokNo c e ki �, uoN ROADWAY DESIGN HYDRAULICS �MII�STRIES OF ALAMANCE e>°tgt a �,�,,,, kn nRou a vi or RErsv� O ISBK 6"BLK BEGI TIP PROJECT �/� c.ou�a z E\� snipe -/ p 1' ENGINEER ENGINEER C BUS WALL �k;�i 1 UI )V IORTH CAROL, dA ° SUNGATE DESIGN GROUP, P.A. lI A POT STA,7f50,00 -L \ v u Mh D_L5 F, Mh.D=2.B Ft. DATE: 05-05-202� C B=2.0 Ft, B=2.0 Ft. ,n, \5�025' 0 50' 100, 1HS MN`� )S \\LLJ STA.10+15 -L- RT `I`oazs''HWOODS ODS FROM STA.8+00 -L- TO STA. 11+00 -L- LTHs sre . TILK �DETAIL 3 PLANTER PLA\TE 2' ASE DIT€Fj' C3 \ RE DI,[�(/�SPECIAL CUT DITCH EiP o.zr E ETAILI i.3 j �� '"�UTHERAN (''�I�E T MI I(�(�IES OFAST IT E'f FtE STR PLANTER asT T To RTw_I15,RC� p^«�LAMANCE COUNTY, NORTH CARO' INA—�sa' >L3 30° RIC esr -y'y= CE Mh. D=1s Fc I O /I T l T P DOCUMENT NOT CONSIDERED FINAL _ --- REMOVE �- o - - _ i _ L% —FROM STA. 11+75 -L- To STA. 13+00 -L- LT UGT / // UNLESS ALL SIGNATURES COMPLETED _ --?1, + ' D CONSTRUCTION ,- D.i. - _ _ S 8`1'l8'4Z7"E — —� PO STA.21+72.00 -Y- BST loll%� 11 WOODS B"_D - - - - -� - Q s tic ww�� �-G-F tp zTl/ -� __LO-Et TOWN LIMIT (IN) EST.8 PEW E EiP � I � ELON TOWN LIMIT (OuT) P vJ OF LUTHERAN RETIREMENT MINISTRIES a I O ALAMANCE COUNTY, NORTH CAROLINA / 55l D hTR � I III E 18,RCREMOVE Lu00 T ISBK oDS 2 Z gUS JOSEPH F ROBERTS J SEPH F RO E E— U REMOVE JB RE LE CB C ARLENE ROBE FOGLEMAN D L CHARLENE ROBERTS TRUCKING INC Q 20 ((( JOSEPH F ROBERTS STANDARD 2 BASE DITCH 1(( 8(F / / CHARLENE ROBERTS EST. DDE=24 CY / / /� Lf /�� / N SEE DETAIL 2 L=67 FT LJ 30 LF OF INLET POT STA.22 6.48 -L- REMOVE l CB cl CHANNEL IMPROVEMENTS / ) PT Sto. 17+40.23 -L- EST. 190 TONS GEOTEXTIIPLE RAP CB W/� (N /� - SEE DETAIL / PC S1 I7.42 -L �� z / LUTHERAN RETIREMENT MINISTRIES OF T 21 C&, / / / P_IV ALAMANCE COUNTY, NORTH CAROLINA O QSEEDETAIL C3 DITCH 24 Cac11 e� D/ _ \ REMOVE 72•' RCP Lo / tiN + IDPREVEBACNEiERLOW % �\ ooII ei 5� 7 \ / / Rcp��a - is RCP za ce:G LP \ m ti w000s r RETAIN wooDs'4,:,\,N/,� \ 4 \ me —�� 11/ l �Q I j Q E o j s �� - p � 5 2 ELE METER LND / R B P C/1���— E� , A� \ - �� — — - PU —6v � %' F 1 P/ B/D"' CDI wo N ArM B W - - _ - - _ _ LS ❑ iJ J z / FL WABL C LC W LJ _-- cR cR - - - - - - - - - - - `�� S / / C C3 FN5" R 15" RCP REMOVE Z -_tc___- / - -I-c O CHURCH—ST5-0'BST— _— --—_ _ - _ OCu 7 ---- _ _E CBI REM VE 38 LF \ y EMIV��— - - - - - - - + REMOVE C --- -�— L -c- - EM� E - r _C8 U _ � _ - - TS RCI~ - - - - - - - - - - - -- RCP_IV REMO 10 - - F- ��-c-------- � ---- CB / Im / �O��a L/Cs 0 SOUTH ---- Q P II55RRCP ---- - - - -- - - _ 3 -- — N ' CH RAH sr REMOVE _ = C-- N X c EWER usr PcE e T ,,--—sIt-B_eDS�T j. isz 6 LF _ �TS�RCP-- a I- - a RDA — - - - - - X es FOGLEMAN 0 �� �I� I F�-.LYP�1 2a`T------ 5 L TRDCKING �; wl I= �) S� esr B, HOPE 5r� R PE E UE • Rc P� s •• �, RCP B F� 1. G F 9 sne�r� s W INC I IS P / / 7� F Z _ P_ "�� p - ssT Nc 3a shNi ____ �IS RCP 15 m B P REMOVE DI `F/ / / �� \ - L Ps DUMPS ER / � B CON — zH•c� isBK �� SITE 1 0+ i ,� / y/ R ao UE w000s21' PUE u -TH IKATE* 8US / /C Li 21' Q E�AFLF EASEMEN o. p 30 B / / w CAN O+ N REMO. / PART -LE WIDTH a // BOBBY R ROSE JR Ej�� 4 / HILLIER KEZIAH FAMILY LLC LORI A ROSE 1E 1 EASEMENT I �� I / \ REMOVE / /St LLB CB ZP 166 ��� // //� \ RESTAURANT INVESTMENT °2 LLC / R \ 25 LF OF OUTLET CHANNEL IMPROVEMENTS Rz h LEE DE IL 7 DETAIL $ EST. 35 TONS CL II RIPRAP RETAIN 15" RCP INLE CHANNEL IMPROVEMEN OUTLET CHANNEL IMPROVEMENTS EST. 150 SY GEOTEXTILE & DI OOD / /M�// / BANK STABILIZATION LEE I Ne, ra s�ole7 Nm,a s�ie7 e dB ° A,� l / T. 54 TONS CL II RIP RAP �• \ / SEE DETAIL 8 �Ee ES . 88 SY GEOTEXTILE =8X61BAR j EA / yF Fc.nnou _ io cv INLET CHANNEL BANK STABILE Boo IEMOyE ( ' SO �EOUTLET CHANNFI - 2 / z (LOOKING DOWNSTREAM) (LOOKING DOWNSTREAM) EST. 125 TONS CL II RI TE EST. 203 SY GEOTEXTILE BZ e— R'o STA. 19+60 -L- LT STA. 19+90 -L- RT N 11 StES./ _KOZT 30" RCP I y.B / / Hd' vARiAaLE wiorH PRIVATE VE CB / / ,� ) TOPALLOWABLE IMPACTS ZONE 1 AccESSEASEMENT 0.n,c. SITE 2 'W% REMOVE ( Bz J / "E ZP NO 186 LLC �� �0" CP V ao' OFFSEE S7yY_ STq 73 n SEE RCP -IV BZ2— NOTE:SHEET 8 FOR -L- PROFILE ALLOWABLE IMPACTS ZONE 2 EET , +Sp SEE SHEET 10 FOR -Y- PROFILE H� AfA AfA AA AfA RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type CROSSING IMPACT BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) 1 18+68 to 20+22-L- 2 at 7'x7' RCBC EXTENSIONS X 9301 4523 13824 2 13+58 to 15+30-Y- 2 at 8'x6' RCBC EXTENSION X 7378 3421 10799 TOTALS*: 16679 1 7944 1 24623 1 0 1 0 1 0 1 0 0 NOTES: 2018 Feb WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS ZONE1 I ZONE2 SITE NO.1 STATION (FROM/TO 1 1 1 18+68 to 20+22-L-LT 1 1 33 1 62 1 (TOTAL: 1 33 1 62 1 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5-5-2020 Alamance County U-6010 47145.3.1 SHEET 4 OF 4 Rev.Jan 2009