Loading...
HomeMy WebLinkAbout20200758 Ver 2_ePCN Application_20220922 DW R mrlsloa of ware.Besourcrs Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 5/2/2022 BIMS#Assigned* Version#* 20200758 2 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Ryan Conchilla:eads\rjconchilla Information for Initial Review 1a.Name of project: Intersection Improvements at US 70(South Church Street)and SR 1311(University Drive),including widening South Church Street from West of University Dr.to Westbrook Ave(SR 1309) 1a.Who is the Primary Contact?* Wright R.Archer,III,PE 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* warcher@ncdot.gov (336)487-0000 Date Submitted 9/22/2022 Nearest Body of Water Ingle Branch Basin Cape Fear Water Classification WS-V;NSW Site Coordinates Latitude: Longitude: 36.079731 -79.527536 A. Processing Information County(or Counties)where the project is located: Alamance Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: U-6010 WBS#(?) 47145.1.1 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission."` 6/10/2020 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? " For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project? Yes No 2.Owner Information 2a.Name(s)on recorded deed: North Carolina Department of Transportation 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address PO Box 14996,1584 Yanceyville Street Address Line 2 City State/Province/Region Greensboro NC Postal/Zip Code Country 27415-4996 USA 2e.Telephone Number: 2f.Fax Number: (336)487-0000 2g.Email Address:* warcher@ncdot.gov 4.Agent/Consultant(if applicable) 4a.Name: Nancy Oberle 4b.Business Name: Three Oaks Engineering 4c.Address Street Address 324 Blackwell Street,Suite 1200 Address Line 2 City State I Province/Region Durham NC Postal/Zip Code Country 27701 USA 4d.Telephone Number: 4e.Fax Number: (919)900-6535 4f.Email Address:* nancy.oberle@threeoaksengineering.com C. Project Information and Prior Project History 1.Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Burlington 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project: Ingle Branch 3b.Water Resources Classification of nearest receiving water: WS-V;NSW 3c. What river basin(s)is your project located in?* Cape Fear 3d.Please provide the 12-digit HUC in which the project is located. 030300020305 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The proposed project is the improvement of the US 70(South Church Street)intersection at SR 1311(University Drive)and widening of South Church Street to a multi-lane roadway from east of University Drive to west of SR 1309(Westbrook Ave).The project includes the installation of multi-use paths and sidewalks throughout a majority of the project corridor,as well as signal improvements with pedestrian signals and high-visibility crosswalks. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown If yes,please give the DWR Certification number or the Corps Action ID(exp.SAW-0000-00000). DWR:20200758 SAW-2018-01083(expired 3/18/2022) 4f.List the total estimated acreage of all existing wetlands on the property: 0.10 4g.List the total estimated linear feet of all existing streams on the property: 734 4h.Explain the purpose of the proposed project: The purpose of the proposed project is to improve traffic operations by providing additional capacity and improve pedestrian and bicycle access. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The first existing culvert,a 2@7'x7'(7'x8'Downstream)Reinforced Concrete Box Culvert beneath US 70 requires extensions both upstream and downstream.As part of this culvert extension,an additional 1@8'x7'RCBC will be constructed parallel to the existing 2@7'x7'RCBC.The proposed 8'x7'RCBC replaces an existing 72"Reinforced Concrete Pipe.The extensions and culvert addition will require channel improvements both upstream and downstream.The channel improvements will smoothly tie the existing channel to the box culvert extensions and addition.The second existing culvert,a 2@8'x6'Reinforced Concrete Box Culvert beneath SR 1311 requires extensions downstream.The northern most barrel has a 2' concrete sill and is backfilled with native material to allow for animal passage and flow conveyance during storm events.A 2'sill will be constructed in the northern barrel extension.CL II Riprap will be used downstream as bank stabilization.All major structures have been designed to have as little environmental and surface water impacts as possible.The proposed project is not expected to result in indirect or cumulative adverse impacts to the environment.Typical road construction equipment,such as trucks,dozers,cranes,and asphalt equipment,will be used for this project. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2018-01083 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Nathan Howell,PWS,MS Agency/Consultant Company: Three Oaks Engineering Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE-7/31/2020(with permit) 6. Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 2.Wetland Impacts 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name 2e.Forested* 2f.Type of Jurisdicition*2g.Impact area -] Culvert Inlet P Floodplain Pool WB No Both 0.002 (acres) Culvert Outlet P Floodplain Pool 1WB No [Both 0.001 (acres) Culvert Inlet P Headwater Forest WA Yes Both 0.004 (acres) Mechanized Clearing P Headwater Forest WA Yes Both 0.013 (acres) Roadway Fill P Headwater Forest WD Yes Both 0.013 (acres) Roadway Fill P Headwater Forest WE Yes Both 0.011 (acres) Mechanized Clearing JL Headwater Forest WE Yes Both 0.003 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.000 0.047 2g.Total Wetland Impact 0.047 2i.Comments: 3. Stream Impacts ❑3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* ��3e.Stream Type* 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction* length* S1 Site 1 Culvert Inlet Permanent Fill Ingle Branch Perennial Both 32 23 Average(feet) (linear feet) S2 Site 1 Culvert Inlet Temporary Dewatering Ingle Branch Perennial Both 32 20 Average(feet) (linear feet) S3 Site 1 Culvert Inlet Permanent Stabilization Ingle Branch Perennial Both 32 43 Average(feet) pinear feet) S4 Site 1 Culvert Outlet Permanent Fill Ingle Branch Perennial Both 32 36 Average(feet) pinear feet) S5 Site 1 Culvert Outlet Temporary Dewatering Ingle Branch Perennial Both 32 9 Average(feet) (linear feet) S6 Site 1 Culvert Outlet Permanent Stabilization Ingle Branch Perennial Both 32 34 � Average(feet) (linear feet) S7 Site 2 Culvert Inlet Permanent Fill SA Perennial Both 8 11 Average(feet) (linear feet) gg Site 2 Culvert Inlet Permanent Stabilization SA Perennial Both 45 Average(feet) (linear feet) S9 Site 2 Culvert Outlet Temporary Dewatering SA Perennial Both 12 Average(feet) (linear feet) S10 Site 2 Culvert Outlet Permanent Stabilization SA Perennial Both 38 Average(feet) pinear feet) S11 Site 3 Roadway Fill Permanent Fill SD Intermittent Both 3 32 Average(feet) (linear feet) S12 Site 3 Culvert Outlet Permanent Fill SD Intermittent Both 3 42 Average(feet) pinear feet) 31.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 31.Total temporary stream impacts: 304 41 3i.Total stream and ditch impacts: 345 3j.Comments: 6. Buffer Impacts (for DWR) 6a.Project is in which protect basin(s)? Check all that apply. Nauss Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Allowable P Ingle Branch Yes 9,301 4,523 Allowable P SA Yes 7,378 3,421 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 16,679.00 7,944.00 Zone 1 Zone 2 Total combined buffer impacts: 16,679.00 7,944.00 61.Comments: There are wetlands in buffers at Site 1(Ingle Branch),33 sq ft in BZ1,and 62 sq ft in BZ2. E. Impact Justification and Mitigation ' 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The proposed project requires the extension of existing culverts under US 70 and SR 1311,and the replacement of a concrete pipe with a box culvert under US 70.Roadway approach work is minimized as much as is practical to reduce the overall project footprint.The extensions and culvert addition will require channel improvements both upstream and downstream.The Channel improvements will smoothly tie the existing channel to the box culvert extensions and addition.At Site 2,a 2'sill will be constructed in the northern barrel extension.CL II Riprap will be used downstream as bank stabilization.All major structures have been designed to have as little environmental and surface water impacts as possible.Impacts to the associated protected riparian buffers have also been reduced by promoting sheet flow.The project proposes new pavement,which will contribute to the existing drainage area and the ditch velocities.Bank stabilization will be minimized to those areas where deemed necessary. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Erosion and sedimentation BMPs will be installed prior to construction.Construction has been sequenced and designed to avoid/minimize impacts by locating temporary diversion channels away from features.Water will be diverted around the work area to prevent sedimentation of downstream aquatic resources.Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters,restrictions against the staging of equipment in or adjacent to waters of the US and coordination with appropriate environmental staff. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2c.If yes,mitigation is required by(check all that apply): DWR Corps 2d.If yes,which mitigation option(s)will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 144 warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) 0 0.047 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 0 0 4h.Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Other SCM that removes minimum 30%nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land? Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* Yes No 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* Yes No 3b.If you answered"no,"provide a short narrative description. Per the attached Minimum Criteria Determination Checklist,a cumulative impact analysis is not required for the proposed project. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* State Historic Preservation Office's HPOWEB site 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: This project involves construction activities on or adjacent to a FEMA-regulated streams Therefore,the Division will submit sealed as-built construction plans to the NCDOT Hydraulics Unit upon completion of project construction,certifying the drainage structure(s)and roadway embankment located within the 100-year floodplain were built as shown in the construction plans,both horizontally and vertically. 8c.What source(s)did you use to make the floodplain determination?* NC Floodmaps Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document U-6010 Mitigation Acceptance Letter.pdf 587.08KB U-6010 NWP 14 Tearsheet.pdf 4.5MB U-6010 No Archaeological Survey.pdf 559.15KB U-6010 No Architecture Survey.pdf 425.13KB U-6010 Pre-Filing Meeting Request.pdf 147.49KB U-6010 Project Submittal Interim Form.pdf 134.29KB U6010_Permit Package Buffer_20200505.pdf 1.18MB U6010_Permit Package Wetland_20200505.pdf 4.35MB U-6010_PJD_Package_06102020_Signed_REDUCED.pdf 14.48MB U-6010_Tribal Coordination Letter_Catawba Indian Nation.pdf 1.7MB U-6010_Tribal Coordination Letter_Monacan.pdf 1.58MB File must be PDF or KMZ Comments Signature * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: W.R.Archer III,PE Signature SOU�p 0�'—OW,67W Date 9/22/2022