HomeMy WebLinkAboutWQ0019543_Staff Report_20220711State of North Carolina
Division of Water Resources
Water Quality Regional Operations Section
Staff Report
FORM: WQROSSR 04-14 Page 1 of 4
To: NPDES Unit Non-Discharge Unit Application No.: WQ0019543
Attn: Leah Parente Facility name: JW JONES LUMBER
From: Robert Tankard
Washington Regional Office
I. GENERAL AND SITE VISIT INFORMATION
1. Was a site visit conducted? Yes or No
a. Date of site visit: June 30, 2022
b. Site visit conducted by: Robert Tankard and Victoria Herdt
c. Inspection report attached? Yes or No
d. Person contacted: Mark Delosreyes and their contact information: (252) 771 - 2497 ext.
e. Driving directions: Take US 17 Bypass North around Elizabeth City, NC. Turn right (east) onto Old US
17/Northside Road. Facility will be 1.5 miles from the intersection on the right.
II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS
1. Are there appropriately certified Operators in Charge (ORCs) for the facility? Yes No N/A
ORC: Certificate #: Backup ORC: Certificate #:
2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal
system? Yes or No
If no, please explain:
Description of existing facilities: The facility is a wet deck operation consisting of concrete pad, concrete recycle
pond (396,467 gallons) and all associated piping, pumps, valves and controls.
3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately
assimilating the waste? Yes or No
If no, please explain:
4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance
boundary, new development, etc.)? Yes or No
If yes, please explain:
5. Is the residuals management plan adequate? Yes or No
If no, please explain:
6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? Yes or No NOT Applicable!
If no, please explain:
7. Is the existing groundwater monitoring program adequate? Yes No N/A
If no, explain and recommend any changes to the groundwater monitoring program:
8. Are there any setback conflicts for existing treatment, storage and disposal sites? Yes or No
If yes, attach a map showing conflict areas.
9. Is the description of the facilities as written in the existing permit correct? Yes or No
If no, please explain:
FORM: WQROSSR 04-14 Page 2 of 4
10. Were monitoring wells properly constructed and located? Yes No N/A
If no, please explain:
Are the monitoring well coordinates correct in BIMS? Yes No N/A
If no, please complete the following (expand table if necessary):
Monitoring Well Latitude Longitude
○ ′ ″ - ○ ′ ″
○ ′ ″ - ○ ′ ″
○ ′ ″ - ○ ′ ″
○ ′ ″ - ○ ′ ″
○ ′ ″ - ○ ′ ″
11. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? Yes or No
Please summarize any findings resulting from this review:
Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable.
12. Are there any permit changes needed in order to address ongoing BIMS violations? Yes or No
If yes, please explain:
13. Check all that apply:
No compliance issues Current enforcement action(s) Currently under JOC
Notice(s) of violation Currently under SOC Currently under moratorium
Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.)
If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been
working with the Permittee? Is a solution underway or in place?
Have all compliance dates/conditions in the existing permit been satisfied? Yes No N/A
If no, please explain:
14. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit?
Yes No N/A
If yes, please explain:
III. REGIONAL OFFICE RECOMMENDATIONS
1. Do you foresee any problems with issuance/renewal of this permit? Yes or No
If yes, please explain:
2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an
additional information request:
Item Reason
3. List specific permit conditions recommended to be removed from the permit when issued:
FORM: WQROSSR 04-14 Page 3 of 4
Condition Reason
4. List specific special conditions or compliance schedules recommended to be included in the permit when issued:
Condition Reason
5. Recommendation: Hold, pending receipt and review of additional information by regional office
Hold, pending review of draft permit by regional office
Issue upon receipt of needed additional information
Issue
Deny (Please state reasons: )
6. Signature of report preparer:
Signature of regional supervisor:
Date:
7/11/2022
FORM: WQROSSR 04-14 Page 4 of 4
IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS