Loading...
HomeMy WebLinkAbout20221330 Ver 1_Riparian Buffer Authorization_20220927Staff Review Form NORTH CAROLINA Ertrlmnmertlrtl Quality Updated September 4, 2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20221330 Version* 1 Is this project a public transportation project?* Reviewer List:* Select Reviewing Office: * Submittal Type:* Yes No Robert Tankard:eads\rbtankard Washington Regional Office - (252) 946-6481 Riparian Buffer Authorization Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 6/28/2022 Project Contact Information .................................................................................................................................. Name: Mark Nottingham Who is submitting the information? Email Address: mnottingham@greenvillenc.gov Project Information ........................... Project Name: Green Mill Run Streambank Stabilization Project Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Pitt Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Submitted Pre -Construction Notification (PCN) 320.59KB Form.cleaned.pdf Pre -filing meeting request - Green Mill Run 107.54KB Streambank Stabilization Project.pdf Green Mill Run Streambank Stabilization Project.pdf 2.87MB Only pdf or kmz files are accepted. Describe the attachments or comments: I have uploaded the pre -filing meeting request confirmation, the submitted PCN, and a vicinity map and construction documents for the project. Thanks for your time. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. QViiN uWmm 101 „I ''9'Ihli ' q f,kggiM a, 91 ,)))0 Olil II, IIIII Iilulf'' 1I'HII 74/51 "' "7 Imu',,uu', I Illh p VI 1 1111111111111 1111 ;; I,,:ulm,V, ' A'AMi1gm„„1,, ropu, ^°' Iluul m�llllull' 11114144144 "gMB:vutIIM.,;p „fIt Rio ni IJNIIIIWow°'101, .I IV,V,I�I d'Nu m,N""'IIIIIIIIIIIwIAII, ,gym dl p,ll .:111 LL100, h1,w6111uuupl,, IlpipIII�M� 11141000,, 11' Po NOIIVZIIISV1S Nnu lllW N33UE) Ntlld 3119 NLLLLinSN lfISNOJ 0� a — °G 3 ❑ 1 0 5z 3r b„ f \ w \ \ F\ Y. \ 1 v A� v t. v v C \ O Q 3oi ~ �3z Z — _ (n j o 7 a N — — oo N �xUUUU K �'o� O 7 G � c° y m c 0 p gull-0 WON Ajunoo Aid 9111-99JE)JO 1410 PA1­111,11 1111 -10 2 2 NnulllW N33UE) 9NLLinSNO:)IAW 93ION IONINOO N019010 .7 7 n 2A 7 EN E,-�E H 2 HNze'o 8 > hl, 72'E'o =2- U� WHP 24 aj5o M, ­0 'wu 0,O'i u 0, ? no O 81 R E > 0 N 2 2 2 IN g H .21 m H um 0 -E iq� J 4 8g6aoq E E E 21- . 2 E M-4- 0, I MEN L I J L From: 401PreFile To: Mark Nottinaham Subject: Automatic reply: [External] Pre -filing meeting request - Green Mill Run Streambank Stabilization Project Date: Tuesday, June 28, 2022 8:28:37 AM This email confirms receipt of your pre -filing meeting request. Please retain this email for your records and submit this documentation as part of your 401 application (PCN Application) as required by federal law. DWR will not be able to accept your application without this federally required documentation. 401 applications received without documentation that a pre -filing meeting request was submitted at least 30 days prior will be returned as incomplete. Responses to this email are not monitored. Background On April 6, 2022, the United States Supreme Court issued an order staying a lower court's vacatur of the Trump Administration's 2020 "Clean Water Act Section 401 Certification Rule" ("Federal Rule"). As a result of the United States Supreme Court order, the Trump Administration's Federal Rule has sprung back into effect. The Trump Administration's Federal Rule imposes additional procedural requirements on applicants for 401 Certifications and on DWR's processing of those applications. One requirement is that 401 applicants must request a pre -filing meeting request at least 30 days prior to submitting their 401 application. [40 C.F.R. §121.4] In turn, the Federal Rule requires that applicants include documentation of their pre -filing meeting request in their 401 Certification application. [40 C.F.R §121.1; 40 C.F.R. §121.5]. Please refer to the Federal Rule for more information. Per 40 CFR §121 and §121.5, a 401 Certification application that does not include the required pre -filing meeting request documentation does not constitute a "certification request." As a result of the reinstatement of the Trump Administration's Federal Rule, all 401 applications received after April 6, 2022 that do not have documentation that a pre -filing meeting request was submitted at least 30 days prior to submittal of a 401 Certification application will be returned as incomplete. If you need to contact 401/Buffer Permitting Staff, please use the following link(s) to access of staff contact list(s). For Non -Transportation Central Staff: https://dea.nc.Eov/about/divisions/wader resources/wader guality perrnittinE/401 buffer permittine/401 buffer permittine contacts For Non -Transportation Regional Staff: https://edocs.deW.nc.eov/WaterResources/DocView.aspx?dbid=0&id=21..62034&cr=1.. For all Transportation Projects Including N[DOTProjects: r Pre. -Construction Notification QPlNp IForm For Nationwide Perimiits and IRegiionall G eneirall Perimiits (alloing with corlreslpoindiiing Water Qusalliity CeirQiitiicatiions) AIplriill 13, 2022 Ver 4.3 Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right -click on the document and you can print a copy of the form. Below is a link to the online help file. https:ffedocs.deq.nc.gov/VVaterResources/O/edocf024704/F:ICN % 20Flelp/ 2OFile/ 20201 £5-1-30.pdf A. Processing Information Pre -Filing Meeting Date Request was submitted on: 6/17/2022 If this is a courtesy copy, please fill in this with the submission date. County (or Counties) where the project is located:" Pitt Is this a NCDMS Project* Yes - No Click Yes, only if NCD MS is the applicant or co -applicant. Is this project a public transportation project?* Yes y No This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project. la. Type(s) of approval sought from the Corps:* 41 Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization?* Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps?* -, Yes No Nationwide Permit (NWP) Number: 13 - Bank Stabilization NWP Numbers (for multiple NWPS): List all NVV numbers you are applying for not on the drop doom list. 1 d. Type(s) of approval sought from the DWR: check all that apply 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 401 Water Quality Certification - Express Riparian Buffer Authorization Yes -, No Yes �, No 1f. Is this an after -the -fact permit application?* .: Yes y.. No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. Yes y No Acceptance Letter Attachment Click the upload button or drag and drop files hereto attach document FILE TYPE MUST BE PDF 1 h. Is the project located in any of NC's twenty coastal counties?* Yes - No 1j. Is the project located in a designated trout watershed?* Yes - No Link to trout information: http:ffwww.saw.usace.army.mil/Missions/Regulatory-Permit Progran-VAgency Coordination/ Froutaspx B. Applicant Information la. Who is the Primary Contact?* Mark Nottingham 1c. Primary Contact Phone:* 1 b. Primary Contact Email: (­)­xxxx mnottingham@greenvillenc.gov (252)329 4242 1 d. Who is applying for the permit?* Owner Applicant (other than owner) (Check all that apply) 1 e. Is there an AgentlConsultant for this project?* Yes - No 2. Owner Information 2a. Name(s) on recorded deed:* -WF 84 1-1-C 2b. Deed book and page no.: 42 97 2c. Contact Person: (for Corporations) Sharon Elks 2d. Address* Street Address 99 Fisherville lRd Address Line 2 City State / Province / Region Concord NI-1 Postal /Zip Code Country 03303 United States 2e. Telephone Number:* (.x)xx­xxx (252) 752 8900 2f. Fax Number: 2g. Email Address:* thequarterdecl<.I<eystone@gmail.com 3. Applicant Information (if different from owner) 3a. Name:* Mark Nottingham 3b. Business Name: (if applicable) City of Greenville 3c. Address* Street Address 2000 Cedar Ln Address Line 2 City State / Province / Region Greenville NC Postal /Zip Code Country 27858 United States 3d. Telephone Number: (252)329-4567 3e. Fax Number 3f. Email Address:* mnottingham@greenvillenc.gov C. Project Information and Prior Project into 1. Project Information 1 a. Name of project:* Green Mill lRun Streambank Stabilization 1b. Subdivision name: (it appropriate) 1c. Nearest municipality I town: Greenville 2. Project Identification 2a. Property Identification Number: 2b. Property size: (tax PIN or parcel ID) (in acres) 06409 73 2c. Project Address Street Adore. 1110 E 1 Oth Street Address Line 2 City State / Province / Region Greenville NC Postal (Zip Code Country 27858 United States 2d. Site coordinates in decimal degrees Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey -grade GPS device) after the decimal place as appropriate, based on how the location was determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.) Latitude: Longitude: 35.60198 7735577 ex 34.208504 -77.796371 3. Surface Waters 3a. Name of the nearest body ofwater to proposed project: Greens Mill lRun 3b. Water Resources Classification of nearest receiving water: C,NSW Surface Water Lookup 3c. What river basin(s) is your project located in?* tar -Pamlico 3d. Please provide the 12-digit HUC in which the project is located.* 03020103 River Basin Lookup 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project site includes a section of the Careen Mill IRun Oreenway that is adjacent to the Careen Mill IRun stream. The banks of the stream are very steep in this location and have eroded overtime. The erosion threatens to undermine the Oreenway in this 75` long span of the stream. A student living housing complex is located on the north side of the stream and single family homes are located on the south side. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* Yes No :w Unknown 4f. List the total estimated acreage of all existing wetlands on the property: Unknown 4g. List the total estimated linear feet of all existing streams on the property: (intermittent and perennial) 1,000 4h. Explain the purpose of the proposed project:" The purpose of this project is to stabilize 75` linear feet of streambank to prevent further erosion and to protect the Careen Mill IRun Oreenway. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project will involve the placement of approximately 100 gabion baskets along the northern bank of the Careen Mill IRun Stream. The project is 75 in length and there will be 4 layers of gabion baskets that will be 12' tall when complete. Equipment required to install these stream stabilization measures will include an excavator and dump truck. Other small equipment may be required as well. Construction involving equipment should be able to be conducted from the top of the bank. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No w, Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified - Unknown N/A Corps AID Number: Example: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* Yes p; No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands 0 Streams -tributaries r": Buffers Open Waters Pond Construction 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact* (?) 3b.lmpact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width* ....75 3h. Impact length* Bank Stabilization Permanent Bank Stabilization Greens Mill lRun Perennial Both 10 Average (feet) (linear feet} "" All Perennial or Intermittent streams must be verified by 17WR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 75 3i. Total temporary stream impacts: 0 3i. Total stream and ditch impacts: 75 3j. Comments: 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts below. 6a. Project is in which protect basin(s)?* Check all that apply Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type P) 6c.Per orTemp P) 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Allowable T Greens Mill Run No 900 (square feet) 0 square feet) ( 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 900.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 0.00 0.00 Zone 1 Zone 2 Total combined buffer impacts: 900.00 0.00 6i. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project length only covers the area required to stabilize the stream in the vicinity of the Greenway. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Construction should be able to be performed from the top of the bank. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes - No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This stream is not navigable and impacts will be limited to the streambank. NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBI TS website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 0 *** Recent changes to the stormwater rules have required updates to this section .*** 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? - Yes No 1 b. All buffer impacts and high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM)s must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWi) Other SCM that removes minimum 30% nitrogen 41 Proposed project will not create concentrated stormwater flow through the buffer (check all that apply) For a list of options to meet the diffuse flow requirements, click here 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?" Yes w, No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?" Yes ? No Tb look up low density requirement click here 15A NCAC 021-1 .1003(2). 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?" Yes No a N/A - project disturbs < 1 acre Hint: projects that have vested rights, exemptions, or grandfathenng from state or locally implemented storm —ter programs or projects that satisfy state or locally -implemented storm,xater programs through use of community in -lieu programs should answer no to this question. Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?" y Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?" Yes u- No Comments:" N/A 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?" .. Yes .,, No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality?" Yes - No 3b. If you answered "no," provide a short narrative description. This project only involves stabilizing a streambank. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?" .: Yes nNo N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?" t Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8?* Yes �, No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.?* 6 Yes No 5g. Does this project involve bridge maintenance or removal?* Yes - No Link to the NLEB SLOPES document: http://saw-reg.usace.arrny.mil/NI_F_B/1-3C-17-signed._Nl-EBSI-OPES&appS.pdf 5h. Does this project involve the construction/installation of a wind turbine(s)?** Yes - No Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?* Yes - No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?* The USFWS IPaC tool was used to identify Endangered Species that could potentially be located in this area. IPeview of the species reveals that there are none of the identified species in the project area. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* .: Yes ., No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* The NOAA Essential Fish Habitat Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http�!/gis.ncdcrgfrvlCaperwetr! 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)?* Yes y No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The SHFIO mapping tool. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.tema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?* - Yes No 8b. Ifyes, explain how project meets FEMA requirements: Project requires a NoriseCertification which is being applied for and will be approved by the State NI=1P Engineer and the City of Greenville prior to construction. 8c. What source(s) did you use to make the floodplain determination?* Flood (Risk Information System (FRIS) Miscellaneous Comments Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Careen Mill IPun Streambank Stabilization Project.pdf Z87MB File must be PDF or KMZ Signature * 41 By checking the box and signing below, I certify that: The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief', and The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. I have given true, accurate, and complete information on this form, I agree that submission of this FICIN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"), I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"), I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature, AND I intend to electronically sign and submit the FICIN form. Full Name:* Mark Nottingham Signature* Date 6/17/2022