Loading...
HomeMy WebLinkAbout20221327 Ver 1_Shoreline Stabilization_20220927Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* Gerard Reid Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 9/26/2022 submitted on: * Owner Information: Name: * Email: * Phone Number: Mailing Address: * Gerard Reid greid@shelcollc.com (704)562-4811 (xxx)xxx-xxxx Street Address 13844 Foxlyn Trail Court Address Line 2 City Huntersville Postal / Zip Code 28078-6521 Is there an agent working on the project? * Yes No Project Information [15A NCAC 02H .0502(a) & (b)] State / Province / Region NC Country US Project Name: * Reid Sea Wall Repair If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Property Address Lookup: * Latitude: * 35.338508 Street Address 128 Hattaway Circle Address Line 2 City State / Province / Region Troy NC Postal / Zip Code Country 27371 US Longitude: *-80.064297 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Site Plan.pdf 144.85KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Shoreline Photo.pdf 492.53KB 4. Location of the property (where work is to be conducted) Nearest Town: * Albemarle County: * Montgomery Lake/ river/ ocean adjacent to Lake Tillery property: Subdivisions name or site address: * Woodrun: 128 Hattaway Circle, Troy, NC Include phase/lot number Directions to site: * HWY 27, Left turn on River Rd, left turn on Woodrun Dr, right on Cresswell, right on Fairfield, left on Hattaway. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * Residential development Residential, undeveloped, etc. 6. Property Size .5 Acres Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Sea wall maintenance. Replace wooden sea wall components that are worn or damaged. 8. How will the work be done? * From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 50sf square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 400sf square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) 4-5 trees and pine needle ground cover. Sketch: Sketch.pdf 463.67KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Gerard Reid Signature: Submittal Date: 9/26/2022 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20221327 Version:* 1 Select Reviewer: * Chad Turlington:eads\ccturlington Select Reviewing Office: Fayetteville Regional Office - (910) 433-3300 Has payment been received?* No Payment Needed Fee Received Need Fee - send electronic notification What amount is owed?* $240.00 $570.00 pul,,g,,:;1",1';AIPA.I[OrrAkAo b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as, buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Le MOIR ME mu am XM Shoreline & 0,' JI Z Lake �At Full Pond/ Normal Water Level) 4 j ti ') : 1, r '5; t 'f ) (z` Lake Exsting Dock K ft. 7 f X-D r'i Md—'f'ill pondr fAVI, Full Pondi Normal Water Level Oi.V'Oh R 'll r Me P fi,ff p WiL arR 150 ft. :A, A'y �j vi I, I A Plan View j r' WME am an am MR Ow 1, IJ 01 unmenital Qualm Division of Water Resokii Noilh Carolim Det%filuicinit (if Envir PAR 15, Tga lei 512 Midi S;disbury Sieo 1617 Mail Seivii.',c CenUn i Rfilci� _:,It, Minh Camfina 27(i99-P,I 7 9 4 9 70 7,90()t) (At FUll Pond/ Normal Water Level) m c 0 Sid'e view U- T�, E 'p "a Wri' � re''I" mill: 17"'s Nal-di c2loliml Dcparment of Environme[jml Quahty 1 Division of Wak,,u RescAirces �12 Nordi 'SAsbury Sheep 1 1017 NkId Flel%;!(-,e C(IWT 1 R,-I]Cigh. Morlh Cmuliva 2'7699 16 17