Loading...
HomeMy WebLinkAboutSWA000167_Plansheet - SCM Detail_202209123 6 " RC; ice- \ 20' PRIVATE \ \ \ \ STORMWATER \ \ EASEMENT \ \ \ \ \ \ RCP \ I \ \ \ \ \ \ \ \ \ \ \ \ \ 1/:B 201 P^4WA !69 141 IN 395 39! 390 350 1 \ I I 1' THICK RETAINING WALL � TO BE DESIGNED BY OTHERS CM 1 RISER (4X4) OP 368.00 JV IN 365.90 (8' RISER ORFICE ) INV IN 365.02 WQE ORIFICE) INV IN 359.00 ( " DRAWDOWN) qV IN 365.90 ' RISER ORIFICE) JV OUT 359.00 (TO SCM 1 FES) EXISTING GRADE � \ PROPOSED GRADE \ w 100 YR WATER ELEV = 368.92' ^ 25 YR WATER E�_368.16_ -10 YR WATER ELEV = 367.41' - 36'n 1 YR WATER ELEV = 366.03' oR��csOoA - -- ---- \ WOV ELEV = 365.04' sk^�� PERMANENT POOL ELEV = 364.00' �' \ c \2.5" WOE DRAWDOWN EI EV: 364.00' MIN. 2'- TOP 367.33 INV IN 334.00 (100-101) VELOCITY BOTTOM OF FOREBAY DISSIPATER PAD ELEV = 361.00' BOTTOM OF SEDIMENT STORAGE ELEV = 358.00' BOTTOM OF MAIN POND ELEV = 359.00' 6" MAINTENANCE DRAWDOWN PIPE ELEV: 359.00' c•11 ;'m1 3751 TOP OF BERM ELEV = 370.00' SPILLWAY ELEV = 369.00' 370 (2) 8" ORIFICE FILTER DIAPHRAM (SEE ELEV: 365.90' DETAIL ON SHEET 6.1) SCM 1 FES TOP 360.10 365 INV IN 357.56 (SCM 1 d. I i- ,, `3?nut �u� ��v d, co N N O 07 � 07 QD CO MCD M� co� Mco MM MM CS (0 co .11 L VELOCITY 355 DISSIPATER PAD 24" RCP @ 1.81 % O-RING �ASKETED 350 -0+50 0+00 1+00 2+00 3+00 4+00 SCM 1 PROFILE HORIZ SCALE: 1 "=30' VERT SCALE: 1 "=3 3451 UTFALL) 4+50 3 Top of Riser 368.00 ft 2.50 inch Water Quality Orifice 364.00 ft 0 30 PROFILE SCALE Hand Wheel VEGETATIVE SHELF PLANTING PLAN LEGEND QUAIL SEDGE 44444 (CEREZ TENERA) VIRGINIA SWEETSPIRE / (ITEA VIRGINICA) D p D D JOE PYE WEED D D (EUPAT' FISTULOSUS) SCALE 1 "=30' 1 NOR 0 30' 60' 2 Yr Water Surf Elev: 366.23 ft 1 Yr Water _Surf Elev: _ _ 365.97 ft Temp Pool Elev_365.04 ft Perm Pool 364.00 ft 4.00 ft 5.00 ft---- 79.52 LF of 24" RCP @ 1.81 % 6" PVC Invert Out: 359.00 ft Fill With Concrete , As Necessary 359.00 ft Precast Extended Base ; 1.00 ft 358.00 ft 1 -- 2.00 ft 2.00 ft PRECAST CONCRETE RISER 4 ft x 4 ft x 10 ft Tall, With a 1 ft Thick Precast Extended Base 1" Water Quality Runoff . - Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Where: Rv = Runoff Coefficient, in/in I = Percent Impervious 1= 51.1 % Rv = 0.05 + 0.009(I) Rv = 0.510 1.0 inch runoff volume (Required) Runoff volume, S=(Design rainfall) (RV) (Drainage Area) Design Rainfall = 1.0 inch Drainage Area = 15.60 acres Storage Required = 28,856 cu. ft. Volume• • - For 1.0"• Depth PPE SA (SF) • •ve Permanent Pool• •-• Top Temp Pool SA (SF) Volume (CF) Elevation 1.00 21,442 33,858 28,856 365.00 Size Water Quality Orifice Qv = CdA 2 h 1/2 for• • for •Volume (Orifice Equation-, Cd=0.60; h = Ho/3) 2.50 1Orifice Diameter (inches) 0.90 Ho (Driving Head to Centroid of Orifice) (ft) 0.30 Ho / 3 (Per orifice equation recommendation in NCDEQ SWM Design Manual, Part 0.09 Q1.0" Drawdown Rate (cfs) 28,856 Water Quality Volume (V VW / Q1" x 86,400 Drawdown Time (days) 3.7 Pond Pond Type Drawdown Time (days) (2 - 5 days) . Elevations Wet Pond TSS Removal 850% Top of Pond / Berm 370.0 ft Secondary Spillway Width 50.00 ft Bottom of Secondary Spillway 369.00 ft Top of Riser 368.00 ft (at least 1' Above TPE) Riser Type / Size 44 ft Top of Water Quality / Temp Pool Elev 365.04 ft (1" Runoff) Top of Veg. Shelf 365.00 ft Permanent Pool Elevation (Normal Pool) 364.00 ft Water Quality Orifice Elevation & Size 364.00 ft 2.50 in Secondary Orifice Elevation & Size (Rise & Span) 365.9 ft (2) Total 8.00 inch 8.00 inch Bottom of Veg. Shelf 364.00 ft A Rise A Span Top of Sediment Storage / Pond Bottom 359.00 ft Bottom of Sediment Storage 358.00 ft (Min 1 ft) Invert Out of Riser 359.00 ft Outlet Pipe Size 24.00 in Diameter RCP Outlet Pipe Length & Slope 79.52 ft 1.81 % Downstream Outlet Elevation 357.56 ft 1 Yr Water Surface Elev/ Peak Flow (CFS) 365.97 ft 0.27 CFS 2 Yr Water Surface Elev Peak Flow (CFS) 366.23 ft 0.91 CFS 10 Yr Water Surface Elev Peak Flow (CFS) 367.11 ft 3.44 CFS 25 Yr Water Surface Elev Peak Flow (CFS) 367.81 ft 4.54 CFS 100 Yr Water Surface Elev Peak Flow (CFS) Top of Riser: 368.00 Top of WQ Pool: 365.04 Pond Bottom 359.00 Perm Pool Sediment Bottom 364.00 358.00 Anti-Bouyancy Riser Dimensions 368.48 ft 22.79 CFS '. • Detail 2.5 in WQ Orifice Elev 364.00 10' Berm 370.00 100 Yr 368.48 Spillway 369.00 25 Yr 367.81 10 Yr 367.11 2 Yr 366.23 1 Yr 365.97 See Plan for accurate outlet design Inv Out: 357.56 • ' . Invert Out: 359.00 79.52 LF of 24" RCP @ Base: 358.00 1.81% Calculationsfor Weight of Structure Displaced Volume Outside Width 5.00 ft Walls = 13,500 LBS V = LxWx(HT) = C.F. Inside Width 4.00 ft Base = 12,150 LBS Outside Length 5.00 ft FILL = 0 Ibs Displaced Water = Inside Length 4.00 ft C.F. * 62.4 PCF = LBS Height 10.00 ft Outlet Pipe = 236 LBS Base Thick' (ft) 1.00 ft WQ Orifice = 3 LBS Add 15% Factor of Safety Wall Thick' (ft) 0.50 ft Ext Base (ft) 2.00 ft Weir #1 = 66.66666667 LBS V = 275 C.F. Areas removed from Riser Weir #2 = 0 LBS Disp. Water = 17,160 LBS Outlet Pipe 3.14 ft Weir #3 = 0 LBS 15% F.S. = 2,574 LBS WQ Orifice 0.03 ft Weir #4 = 0 LBS Orifice #1 0.89 ft Other #1 = 0 LBS Safety Factor 1.28 Orifice #2 0.00 ft Orifice #3 0.00 ft Weight = 25,345 LBS Weight = 19,734 LBS Orifice #4 0.00 ft Precast Concrete Riser Structure to be 4 ft x 4 ft x 10 ft Tall, With a 1 ft Thick Precast Other 0.00 ft Extended Base Planting Summary Requirements Dam / Berm Non -Clumping Turf Grass 6' Shelf Length 889 Area of Shelf= 5334 SF (50 Plants per 200 SF of Area) Quantity Type Root Common Name Scientific Name Planting Size Notes Herbaceous Container Quill Sedge CerexTenera 4" Pot 24"-36"OC -- . Herbaceous Container Virginia Sweetspire Itea Virginica 4" Pot 24"-36" OC - = Herbaceous Container Joe Pye Weed Eupat' Fistulosus 4" Pot 24"-36" OC 100 Yr Flow in Spillway 0.00 cfs 10 Yr Flow in Spillway 0.00 cfs Top of Pond 370.00 ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF YOUNGSVILLE, FRANKLIN COUNTY, NCDEQ AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS 4:1 Side Slopes 58 ft 50 ft E-------- :------------------ :----------- ------- - OFEss/p Q SEAL = 022321 O. FNGINI: Qom•: ��V.� ZAP"" 0 U O � � o E N E w U = z Q Z 0 LU ro LU LU H r� - O- L N C? LU c O o M 0 2 00 z LU J X Of � LL. 0 �� �Ln r L ID r 0 o; Ln O'� J LU w Q 0 DATE 0811912022 DRAWN BY 331 DESIGNED BY 331 CHECKED BY M. ZACCARDO SCALE H: 1 "=30' V:1"=3' CL N Q %0 T__l � Z J 0 W c� LU<J V I --I O WZ L.L Q � O o oC LU LU J Z a Z IJ C) w > Q OU o J Q z J z I -I LU Z D<a LL U OJT � U Z 0 O o JOB NO. 47829 SHEET NO. C6.0 z O F_ U H z O U O LL- LU Ln ZD H O z O 0 '(n V z Q 0 rn Ln w C7 O a N 0_ 70 a� 0 0 Z Q0 og T @ O a Q C N f6 C a. =) U � w C� 3 Z w 0 � a X H N w N 0 w r0 m 0 Qw o •3 a � N C Y 0 N X O O U :5 2 2N ca C 0 � U � O N E -0 :3C U Cu a m v m p .5-0 o C 0 0 m' U a2 C N f0 C 0 0 C U DocuSign Envelope ID: DE2365E9-58D3-46A3-9FBB-38D8D23A6B95 LIMITS OF CONCRETE CRADLE VARIABLE 6" SOLID WALL PVC TO DAYLIGHT VARMINT SCREEN TO BE PLACED ON OPEN END I a d FLOW to D CONCRETE d ---- - - - ---------- `COLLECTOR PIPE TO BE CAPPED ON BOTH LIMIT OF CONCRETE ENDS CRADLE PLAN VIEW 6" PERFORATED PVC COLLECTOR PIPE 1' PROPOSED 3' GRADE ON DOWNSTREAM SIDE OF DAM VARIABLE 1.5' MIN. #57 WASHED STONE 1.5' - - - - - - - - - - - - - -------- FLOW CONCRETE N 4 1.5' LIMIT OF CONCRETE) CRADLE 2 SECTION VIEW FILTER DIAPHRAGM DETAIL NOT TO SCALE NOTES: MINIMUM DENSITY SHALL NOT BE LESS THAN 95% OF MAXIMUM DRY DENSITY WITH MOISTURE CONTENT WITHIN +/- 2% OF THE OPTIMUM. EACH LIFT OF FILL SHALL BE COMPACTED AS NECESSARY TO OBTAIN THAT DENSITY. ALL COMPACTION IS DETERMINED PER AASHTO METHOD T-99 (STANDARD PROCTOR). DAM EMBANKMENT IS TO BE SEEDED IMMEDIATELY AFTER DAM CONSTRUCTION IS COMPLETE. STORMWATER MANAGEMENT STRUCTURE IS TO BE UTILIZED AS A TEMPORARY EROSION CONTROL DEVICE INITIALLY. ONCE CONSTRUCTION IS COMPLETED AND UPSTREAM SURFACES HAVE BEEN PERMANENTLY STABILIZED, CONTRACTOR IS TO REMOVE ALL SEDIMENT FROM BASIN AND CONVERT TO PERMANENT WATER QUALITY STRUCTURE. THIS INCLUDES INSTALLING THE PROPOSED PLANTINGS ALONG THE LITTORAL SHELF. DAM EMBANKMENT CONSTRUCTION NOTES: 1. CONSTRUCTION OF THIS DAM SHALL BE DONE UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER, WHO IS A REGISTERED PROFESSIONAL ENIGINEER IN THE STATE OF NORTH CAROLINA. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. FAIRCLOTH SKIMMER OR APPROVED EQUAL. TOP OF RISER PRE -CAST BOX WATER -TIGHT SCREW ON CAP WITH ORIFICE DRILLED INTO CAP. SEE POND PLAN SHEET FOR ORIFICE SIZE AND ELEVATION. 40. o FLEXIBLE PIPE 0 o DIP DRAIN WITH GATE VALVE AND HAND WHEEL. ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING CONSTRUCTION. DIAMETER: 6" PVC PIPE 1' MII z SEE POND PLAN FOR ACTUAL FOOTER DIMENSION, WHICH MAY EXCEED MINIMUM 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3-INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND MULCHED OR HYDROSEEDED. 13. THE EMBANKMENT MATERIAL SHALL BE COMPRISED OF CLAYEY SAND OR SANDY CLAY WITH A MINIMUM OF 30% PASSING THE #200 SIEVE, A LIQUID LIMIT OF AT LEAST 25 AND A PLASTICITY INDEX OF AT LEAST 10%, AND LESS THAN 5% ORGANICS. THIS MATERIAL SHALL ALSO HAVE A UNIFIED SOIL CLASSIFICATION OF SC OR CL. INSURE TOP OF STONE IS LEVEL WITH THE TOP OF SHELF AND THE PERMANENT POOL ELEVATION SHELF WIDTH: SEE PLAN PERMANENT POOL 2 �1 z 2 FOREBAY 1 F 18" THICK CLAS:::i 1 RIP RAP OVER DRAINABLE FILTER FABRIC 16" nn ni nTr NOT TO SCALE �1 2 CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. DRAIN VALVE PERMANENT OUTLET STRUCTURE NOT TO SCALE EMBANKME OUTLET BARREL 1' N� INSTALLATION AND MAINTENANCE OF LANDSCAPING: 1. ALL LANDSCAPING SHALL BE OF NURSERY -STOCK QUALITY AND SHALL BE INSTALLED IN A SOUND WORKMANLIKE MANNER AND ACCORDING TO ACCEPTED GOOD PLANTING PROCEDURES. ALL LANDSCAPING SHALL BE ADAPTABLE TO CLIMATIC CONDITIONS OF THE AREA, AND CONSIDERATION SHALL BE GIVEN TO NOT PLANTING LARGE TREES NEAR UTILITIES. ALL LANDSCAPING SHALL BE MAINTAINED IN GOOD CONDITION. 2. ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM STANDARDS SET BY THE U.S.D.A. STANDARD FOR NURSERY STOCK SPONSORED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. 3. ALL LANDSCAPING SHALL AT ALL TIMES SHALL PRESENT A HEALTHY, NEAT, CLEAN, ORDERLY, DISEASE -FREE AND PEST -FREE APPEARANCE. 4. ALL LANDSCAPING SOIL AND FILL SHALL BE FREE FROM WEEDS, REFUSE, AND DEBRIS AT ALL TIMES. 5. ANY DEAD PLANT MATERIAL OR MATERIAL THAT FAILS TO SHOW HEALTHY GROWTH MUST BE REMOVED WITHIN 30 DAYS. 6. REPLACEMENT OF REMOVED PLANT MATERIAL MUST TAKE PLACE WITHIN 90 DAYS OF REMOVAL OR NOTIFICATION BY THE CITY, WHICHEVER OCCURS FIRST. 7. ANY REPLACEMENT PLANT MATERIAL MUST MEET THE SIZE AND OTHER CHARACTERISTICS OF NEWLY PLANTED MATERIAL. 8. MAINTENANCE OF THE LANDSCAPING IS THE RESPONSIBILITY OF THE OWNER. ACCESS DOOR SHALL OPEN TO ALLOW ACCESS FROM DIRECTION OF DAM. INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 \ AND FLOOR OF POND TOP OF EMBANKMENT STEPS SHALL ALIGN WITH ACCESS DOOR 3 1 OUTLET STRUCTURE I It SEE DETAIL THIS SHEET I T 6' WIDE VEGETATED SHELF 6:1 SLOPE 1 I (SEE POND PLAN FOR LOCATION) 6 I C 3/4" LOCK BOLT 8 TYPICAL COAT ALL STEEL SURFACES W/ FOX INDUSTRIES FX-420 COAL TAR EPDXY COATING 3/4" HINGE OR APPROVED EQUAL. 16' SQ. #6 REBAR ENTRY GUARD STEEL SURFACES WHICH ARE TO RECEIVE FX-240 COAL TAR " ANGLE (TYP.) EPDXY COATING SHOULD BE PREPARED BY ABRASIVE oi� �v�.r� DOLT 8 TYPICAL BLASTING TO A COMMERCIAL GRAY METAL (SP-6) STANDARD. ANY SURFACE BLASTED SHOULD BE COATED SEE PLAN THE SAME DAY. IF PREPARED 3/4" DOWEL LOCKING SURFACES ARE ALUMINUM PIN 3/4" HANDLE CONTAMINATED BY RUST OR OTHER CONTAMINANTS, THEY TRASH RACK DETAIL MUST BE RE -BLASTED. NTS NOTES: 1. EMBANKMENT SHALL BE CONSTRUCTED OF CLEAN STRUCTURAL SOIL, FREE OF ROOTS, VEGETATION, ROCKS & OTHER OBJECTIONABLE MATERIAL. SCARIFY SURFACES BEFORE PLACING FILL. PLACE FILL IN 6-8 INCH LOOSE LIFTS. COMPACTS TO AT LEAST 95% OF THE STANDARD PROCTOR DENSITY. 2. CONTRACTOR TO SUPPLY SHOP DRAWINGS OF RISER STRUCTURES PRIOR TO FABRICATION. 3. ALL RISERS SHALL BE PRECAST CONCRETE SOLID 6" WALL STRUCTURES. 4. 4-6 INCH LAYER OF AMENDED SOIL IS RECOMMENDED IN ANY AREA WHERE PLANTINGS ARE REQUIRED (SEE NCDENR BMP DESIGN MANUAL). TOP OF RISER OUTLET STRUCTURE NOTES: 1. ALL STRUCTURES OVER T-6" IN DEPTH TO BE PROVIDED WITH STEPS V-2" ON CENTERS. STEP SHALL BE IN ACCORDANCE WITH STANDARD 841 2. CLASS "B" CONCRETE TO BE USED. 3. ALL MOTOR JOINTS ARE 1/2" ± 1/8" 4. FORMS ARE TO BE USED FOR THE CONSTRUCTI, OF THE BOTTOM SLAB. 5. ALL RISER JOINTS SHALL BE WATER -TIGHT AND (4) GALVANIZED STEEL PLATES 10"X10"X1/4" TH (4) 1/2 INCH BOLTS PER PLATE. 6. FOOTER SHALL BE SECURED TO RISER WITH STRUCTURAL STEEL. 7. RISER SHALL BE ENGINEERED BY PRECASTER'S STRUCTURAL ENGINEER TO RESIST BUOYANCY PRE -CAST BOX BARREL OUTLET INVERT DURING EROSION CONTROL STAGES, ALL RISER ORIFICES SHALL BE TEMPORARILY PLUGGED, EXCEPT FOR THE TEMPORARY SKIMMER. AT TIME OF SKIMMER REMOVAL, THE DRAIN VALVE SHALL BE CLOSED AND ALL RISER ORIFICES SHALL BE UNPLUGGED. INSTALL 4" PVC TEE WITH SCREW TYPE PLUG ONCE SKIMMER IS REMOVED AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN SKIMMER \ DEWATERING DEVICE J CONNECT FLEXIBLE PIPE TO POND DRAIN. GATE FLEXIBLE PIPE VALVE SHALL REMAIN OPEN. REMOVE SKIMMER ONCE POND IS NO LONGER UTILIZED AS TEMPORARY SEDIMENT BASIN. IN BOTTOM OF PVC TEE ONCE SKIMMER IS REMOVED AND POND NO LONGER OPERATES AS A TEMPORARY SEDIMENT BASIN SECTION X-X OUTLET STRUCTURE NOT TO SCALE 4' 1. D. SEE POND PLAN FORS ACTUAL RISER DIMENSION, WHICH MAY EXCEED MINIMUM X PLAN VIEW NOT TO SCALE DAM WIDTH: SEE PLAN INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 3:1 EMERGENCY SPILLWAY_ SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE 2' MIN. ONCRETE CRADLE (MIN. 2000 PSI) I I 3 OUTLET BARREL: CLASS 3 RCP WITH LOCKING WATER-TIGHT'O' RING JOINTS 4\_ EMBANKMENT SECTION1 NOT TO SCALE I 5' CONCRETE CRADLE (MIN. 2000 PSI) r 2-FT DEEP CUT OFF TRENCH STORMWATER WET POND DETAIL EXCAVATE TRENCH ALONG CENTERLINE OF EMBANKMENT AND EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. VERIFY DIMENSIONS WITH GEOTECHNICAL ENGINEER BASED UPON FIELD INSPECTION. GEOTECHNICAL CERTIFICATION NOTE: ASBUILT CERTIFICATION OF THE EMBANKMENT COMPACTION, ANTI -SEEP COLLARS, CUT OFF TRENCH, ETC. WILL BE REQUIRED PRIOR TO CERTIFICATE OF OCCUPANCY ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL TOWN OF YOUNGSVILLE, FRANKLIN COUNTY, NCDEQ AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS SEE FILTER DIAPHRAGM DETAIL SEE DETAIL. THIS SHEET REFER TO PLAN SHEETS FOR INFORMATION Y OUTLET BARREL AS REQUIRED BY BOX MANUFACTURER 1111111111/III .�`�.�H CAR0�i.,�. CCCCgqII 0D42ADF9ZA66B... 022321 C) Pia FNGINE�A� • zIrGG`,,` 8/19/2022 E O U n 6 CD c � o N U w - = z +' a Lu U 0 a LL co z �0 orM O �0 � - a z oc �JU)X U7 <w Mu w 0 0 „1 ) z _ rn O � L O � W Lnrn J w O (D O 0 w > w w 2 Q U Q z O DATE cn 0811912022 O DRAWN BY 331 } DESIGNED BY • • 331 • CHECKED BY • M. ZACCARDO • • SCALE • • CL 0 fV Q � z T_q J O (n J U W U o C� = Q z Q o w (W J z 0 J Q oui U u 0a J Q z J W uj J Q O 0 0 QJ LL z O J U J ) U z 0 0 O o JOB NO. 47829 SHEET NO. C6.1 z O H U H (n z O U Qi O w Cn O z O 0 Cn z_ Q 0 (n Cn w ce (D a a 0- d � �O �O� O O dcf) LZ O 2 02 > cuo a= c m m N d oZ) cy 3 Z co O 2 a g x 0 H o o 3 a °� a0) .� Y �a U N o d U :E-E �N (6 0 N o c `o U � a 6 .2-0 �0 c� U O c Wo t. N U -02 c n cu(n wo c U `-° a2 o a)_0