Loading...
HomeMy WebLinkAboutU-5821 SOS Letter 2022 NCDEQr�� STEWART September 13, 2022 Mr. Rob Ridings Regulatory Specialist NCDEQ Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699 SUBJECT: Project Scoping and Start of Study for STIP Project No. U-5821, NC 279 Improvements from Redbud Drive (SR 2466) to Union New Hope Road (SR 2435) in Gaston County, North Carolina, WBS# 44393.1.1 Dear Mr. Ridings, This is to inform you that North Carolina Department of Transportation (NCDOT) Division 12 has begun studying proposed improvements for the subject project. The project is included in the approved 2020-2029 State Transportation Improvement Program (STIP) with right of way acquisition beginning in June 2023 and construction beginning December 2025. It is anticipated that a Minimum Criteria Determination Checklist (MCDC) will be prepared for the project in accordance with the N.C. Environmental Policy Act (SEPA). You may have previously received a version of this letter on February 8, 2018. You are receiving this notification because the project has resumed planning and design, the project study area has expanded, and additional areas are required to be surveyed for potential environmental impacts. Federal, state, and local agencies are being contacted for their comments regarding this project. If you have any questions or comments concerning the project, please contact me at 919-866-4750 or email at henchell@stewartinc.com. Please include the STIP Project Number U-5821 in all correspondence and comments. Sincerely, Harrison Wenchell STEWART Attachment Cc: Doug Taylor, PE - STEWART Andy Young, PE - STEWART Joan Lyons, AICP - STEWART STRONGER BY DESIGN 223 S. WEST STREET RALEIGH, NC T 919.380.8750 SUITE 1100 27603 F 919.380.8752