Loading...
HomeMy WebLinkAbout20141099 Ver 1_Application_20141017aF `� °� rFR o� ..9,�� r � n T A. Appficant Information �ffice Use Only: Corps action ID no. DVV4 project no. Fprm Version 1.0 November 2008 Pre-Construction Notification (PCf�) Form 1. Processing 1 a. Type(s� af appraual sought from the �o�p�: � Section 404 Permit ❑ Section 10 Permit 1 b. Speeify Nationwide Permit (I�WP) number: NW 12 or General Permit (GP) number: � c. Has the NWP ar GP number been verified by the Corps? � Ye5 1 d. Type{s} of appro�ai sou�ht from the DWQ (ch�ck all that apply): � � 40� Water Quality Certifcation — Regular ❑ Non-404 Jurisdictio�al Generak Permit 0 4n'! Water Quality Cer#ification — Express ❑ Riparian Suffer Authorization 1 e. Is this notificaiion solely for the recc�rd For the record only for DWQ 4Q1 because written approval is noi required? Certi#icataan. ❑ Yes � No 1f. ls payment �nto a mitigation bank or in-lieu fee program proposed #or mifigation of impac#s? If so, attaeh the accep#ance lettef from mitigation bank ar in-lieu fee program. ❑ No For the recard onfy for Corps Psrmit: ❑ Yes � Na ❑ Yes � No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h; ��'es be4ow. 1 h. Is the project located within a NC DCM Area of Environmental Goneerr� (AEC)? I� Yes 2. Project Infarmation 2a. �lame of projeci: Swan Quarter Ferry Facility 2b. Caunty: �iyde 2c. Nearest municipality 1 town: Swan Qu�rter � 2d. Subdivision name: N/A � 2�. NCDOT only, T.LP. or state �- �{}03 41'149.1.1 I� project na: � 3, Owner Information 3a. Name on Recard�d Deed: NGQOT Ferry Divisian 3b. Deed Baok a�d Page I�o. �t1A 3c. Respansible Par#y (for LLC if C��herine Peele appl+cable): 3d. Street address: 159 Lucinda Lance 'i 3e. City, state, zip: Powells Point, NG 27966 3#. Telephone no.: 252-491-2635 I 3g. Fax no.: 252-473-1A90 3h. Email address: ccipeele@ncdot.go� ❑ No ❑ No Page 1 of 11 PCN Form — Ve'rsion 1.0 No�emf�er 2�708 Version Section A. Applican't Information, con#inued 4. Applicant Information (if different frorn ow�erj 4a. Applicant is: � Agent ❑ Other, specify: 4b. Nar��: Caiherine �eele 4c. Business narne NIA (if applicable�: 4d. Street address: 159 Lucinda Lance 4�. City, state, zip: Powells PQint, f�C 27966 4f. Telephone no.: 252-491-2635 4g. Fax no.: 252-473-1490 4h. Email address: cdpeele@ncdot.go� 5. AgentlConsultant Infprmatian �if applicabls) 5a. �ame: NIA 5b. Business name (if app�icable}: 5c. Street address: �d. City, state, zip: 5e. Telephone no.: Sf. Fax no.: 5g. Email address: Page 2 of 11 PCfV Fcrrm — November 2008 Version B. Project Information and Prior Project Histary 'I. Property Ider�tiiicatian 1a. Property identification no. (tax P16J or parcel ID): 1 b. Site coordinates (in decimal degrees): 1 c. Pro�erty size: 2. Surface Waters 2a. Na�ne of nearest body of water (stream, river, �tc.) to proposed project: 2b. Water QuaCity Glassification Qf nearest receiving water: I�IA � `N - `W S.Q acres I Pamlico 5oundl �c. Fti�uer basin: Tar - Pamlico 3. Project D�scription 3a. Qescribe the existing conditions on the site and the generaf land use in th� �ici applicatiort: This property is used by the N.C. Ferry Di�risian to transfer autorr�abiles and pa Island. 3b. List the total estimated acreage of al� existing +.nretlancts on the property: �.0 acres 3e. List the total estimated finear feet of all existing streams (intermittent and peren 0 3d. Explain the purpose of the proposed project: To cannect fer�y facility sewer line with the city's sewer line. 3e. �escribe the overall prflject in detail, Fn�luding the type of equipment to be use A new sewer line will be instal�ed for the Swan Quarter Ferry Facility building. ' eontraetar who wifi directionally bore the line space deep enough not tv Fmpact installatian will allow ihe faeilities line to be connected #o the city of Swan Quar 4. Jurisdictidnaf Determinations 4a. Have jurisdictional wetland or stream deterrrainatians by the Carps ar State b�en requested or ob#ained for tY�is praper#y 1 ❑ Yes projeet (ir�cluding all prior phases} in th� past? 4b. If th� Corps made the j�risdictional deterrnination, uvhat type of dete�mination w�s made? 0�eeliminary 4.c. �f yes, who cEelFneated the jurisdictional areas? AgencylCansu Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determin 5. Praj�ct History 5a. Have permits or c�riifications been requesked ar obtained for this projee# (includin� all prior phases) in the past? 5b. If y�s, explain in detail �ccording to "help file" instructions. CAMA minor modificat�on permit 202-86 Ex. 12-31-2D16 6. Future Project Plans �a. Is this a phased project? !6b. If yes, explarr�. iity af the project at the time of this ,sengers firom F�atteras to Qcracoke ial} on the proper�y: iis sawer lin� wiE! be installed by the �ny futur� culvert repfaeement. The :r's line fot funciional �se. � No ❑ Ur�knowr� ] Fina! ant Company: �tipns and attach documentation. � Yes I� No I I � Yes � No ❑ UnEcnown Page 3 of fi 1 PGiU Form — Versian 1.0 No�ember 2Q08 Version C. Proposed Impac#s Inventory I 1. lmpac�s $umroiary 1 a. Which sectians v+rere corrtpleteci below far yaur pro}ect {check all t�at app9y}: I i ❑ We#lands [] Sfreams - tributari�s Q Buffers ❑ apen Waters ❑ Pond Construction 2. Wefland impacts I If there are we�land impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. I 2f. V1letlar�d impact Type of jurisdiction number — Type of Type of wetland �orested {Corps � 404, 10 Area of impact (acres) Pe�manent (P) or ir�pact {if knovun) DWQ — nan-4Q4, other) Tem orar T ' W1 ❑ P❑ T ❑ Yes ❑ No � Corps � ❑ D1NQ W2 ❑ P❑ T ❑ Yes ❑ No � Gorps ❑ t]WQ W3 ❑ �' ❑ � ❑ Yes ❑ No � Corps I [] DV'UQ I W4 ❑ P ❑ T ❑ Yes ❑ No � �arps � CI DWQ � W5 ❑ P � T ❑ Yes ❑ No � Corps ! � DWQ W6 ❑ P C� T C� Y"es ❑ f�o � C�rps ' ❑ DWQ � 2g. Total wetland impaets 2h. Comrrtents: I 3. Stream Irnpacts _ If there are p�r�nnial or intermittent stream impaets (inciuding terr�porary impacts} proposed on tne site, then camplet� �his ques�ion for all stream sites impacted. 3a. 3b. 3c. 3d. 3e.j 3�. Stream impaet Type of Stream name Perennial (��R) or A,�etage stream widfh (fe�et) ��p��t nutnber - impact intermittent (INT)? � length Perr�anent (P) or i (lin�ar feet) Temporary (T) 51 � P❑ T ❑ PER ❑ INT S2 ❑ P �� ❑ PER ❑ iNT S3 ❑ P 0 T ❑ PER ❑ INT' S4 ❑ P❑ T' ❑ PER ❑ INT 55 ❑ P(� T ❑ PER ❑ INT S6 ❑ P❑ T ❑ PEF2 ❑ INT � . 3g. iotal stream and tribu#ary impacts 3h. Cornments: Page 4 of 11 ; PCfV Farm —;Version `1.0 Nauember 200$ Ve�sion C. Proposed Impacts Inventory, continued 4. Qpen Water Impacts If there ar� �roposed impacts to lakes, ponds, estuaries, tributaries, sounds, tY�e A#lantic Ocean, or any c�ther apen water of the 11.S. fhen individuall list all a en water irn acts below. � 4a. 4b. 4c. 4d. I 4e. O�en water Name of impaet nur�ber waterbody Type of impact Water 'ody type Area of impaet {acres} - Perrna�ent (it (F) or applieable} Tem c�ra T j fl1 ❑POT � C}2 ❑P❑7 (]3 ❑P❑T 44 ❑P❑T I 4g. Comments: 4#. Total open water impacts Page5oil� I pGN Form -� Nav€�mber 2008 Version C. Proposed Impacts Inventory, continued 5. Pond or Lake Gonstruction �I If and ar lake construction ro osed, then com lete the ehart b�:low. � 5a. 5b. 5c. 5d. 5�. Wetland Impacts (acresj Stream Impaets �feet} Upland Pond fD Prapos�d use or � (acres) numb�r pu�p�se ofi pond i Flooded Fill�d Excavated Flooded ; Filled Excavated Flooded P1 P2 Sf. TotaY ; � 5g. Cammen#s: 5h. Is a dam high hazard permit requi�'ed? ❑ Yes [] No If yes, p�rmit I� no: 5�. Expected pand surface area (acres): � 5j. Size of pond watershed (acres): i� 5k. Methnd of cor�struction: � 6. Buffer Impacxs (far DWQ) � � If project wilf impact a protected riparian buffer, then complete �he chart belavw. ff y�s, then individually list all buifer im�acts below. If an im acts re u�re miti ation, then au MUST fili aut Section R c�f thi5 farm. � 6a. ❑ IVeuse � Tar-Pamlico 0 Qther: Project is in which prokected basin? ❑ Caiawba ❑ Randleman fib. 6c. 6d. 6e. 6f. 6g. Buffer impact � n�mber — Reasan Buffer Zone 1 im�act (square Zon� 2 impact Perrnanent (P} far impact Stream name mitigation feet) (square feet) or Temporary required? � T ' B1 [,P❑T ❑Yes ❑No B2 �P❑T ❑Yes ❑No B3 �P❑T ❑Yes []No 6f�. Total buffer impacts 6i. Comments: I Page 6 of 'I 1 ' PCN Forirn — November 2008 Version D. Impact Justification and Mitigation 1. Avoidance anci Minimizaticrn 1 a, Sp�cifically describe measures taken to aVOid or rr3inimize the prapased imp�cfs in ciesigning project. 1 b. Specifically describe measures taken to �r�aid or minimize th� proposed impacts thrt�ugh constructivn kechniqu�s. The sewer line space will bs directionally bored deep enough as ta not impact any future culWert �eplacement activities or maintenance work 2. Campensatory Mitigation for Impacts to Waters of the U.S. or Waters of th:e State 2a. Daes the proj�ct require Compensatory Mitigation for ❑ Yes � fVo impacts to Waters of the fJ.S. or Wat�rs of the State? 2b. If yes, mitigatian is required by (cneck all that apply}: ❑ DUVQ [] Corps 0 Mitigation bank 2c. If yes, which mitigation aption will be us�d for �his project? ❑ Payment #o in-Geu fee program 0 Perr�ittee Res�onsible Mitigatian 3. Com}�lete if Usi�g a 14litigation Bank 3a. Narr�e of Mitigation Bank: NIA 3b. Credits Purchased (attach receipt and let�er) Type C�uantity 3c. Camments: 4. Complete if Maicin� a Payment to In-lieu Fee Prograrr3 4a. Ap�proaal letter from in-lieu €ee program is attached, [� Yes 4b. Stream mitigation requested: linear feet 4c. if using stream mitigation, stream temperature: warm, cool, cold 4d. Buffer mitigation requested (DWQ flnly}: square feet ��. Riparian wetland mitigation requested: acres 4f. Non-r�}�arian wetland mitigation requested: acrss 4g. Coastal (tidal) w�tland mit�gation request�d: acres 4h.. Cammenis: . 5. Complete if Using a Permi#tee Responsible Mitigation Plan � 5a. I� using a permittee responsibie m�tigation plan, proWide a description of the proposed mitigation plar�. N/A Page 7 of 1 � PCN Farm — Version 1.� iVovember 2{l4$ Version D. Impact Justification and Mitigation, continued � I 6. Buffer Mitigation (5�ate Regula#ed Riparian Buffer Rules) — required by f3WQ 6a. Wil1 the project result in an impact within a protected riparian buffer that requir�s ❑ Yes � No buffer m�tigation? I 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer #hat requires mitic�atio�. Calculate ihe amourst of mitigation required. Zane Reason for impact Total impact Multiplier �equired mitigation (square feet) (square feet} Zone 1 3(2 fQr Catawba) Zone 2 'I .5 Total buifer mitigation required: 6c. If buffer mitiga#ion is required, discuss vuhat type of mitigation is proposed (e.g., payment to prE�ate mitigation bank, per�nittee responsibEe riparian buffer restaraiion, payment into an approved in-lieu fee fund). 6d. Corr�ments: Page8o�11 PCN Form — November 20�8 Version E. Starmwater Management and Diffuse Fiow Plan {required by DWQ) � 1. Diffuse Flow Pian 1a. Does the project include or is it ad�acent to protected rip�rian buffers identified � Yes � No within one of the NG FZ9�arian Buffer Pro�action Rules? � 1 b. If yes, then is a diffuse flow plan included? [] Yes ❑ No 2. Determination if the Pro"ect Requires a Stormwater Mana emen# Plan � 2a. €�oes #he �raject require a Nan-4U4 Jurisdictional Genera! Permit'? ' [] Y�s � No 2b. Is the project subjeet #o General Gertificaiion 37Q4 or 3705? Q Yes ��lo 3. Deterr�ination of Stormwater Review Jurisdiction 3a. Is this project subject to any of the fQllowing state-implemented stormwater ' ❑ C��stal counties management progrart�s (check al! fhai apply)? I ❑ HQ�N ❑ ORW I€ so, attach one copy of the approval [�.tter fram the DWQ and one copy of the I ❑ Sessio� Law 2006-246 approved stormwater management �lan. I �J Other: 3b. Ir� which local governrn�nt's jurisdiction is this project? II 3c. Is this iocal go�ern�ent certified to imp�ement a state stormwater program? [� Yes ❑ Ner If so, a�tach one copy of the appr€rval letter frQm the local government and qne copy of the apprnved stormwater management plan (or one copy of the approved Stc�rrr►water rrranagement plan s{arnp�d as appro�ed). 4. Informaiian Required fpr DWQ 401 Unit Starrnwat�sr Review 4a. What i5 the overall ercent im erviousne5s accflrdin to the most current site {an? [VIA 4b. DoeS this project contain any areas #hat meet the criteria for "high cEensity" per � Yes � No General Certifcations 3704 ar�d 3705? � I 4c. Ifi th� site is aver 24% impe�rious andlor contains high density areas, then provide a brief narrati�e deseription of the stormwater management plan. NIA �4d. Has a completed BMP Supplement Form with all required items been submittecl � Yes � No for each starmwater BMP? -- - - I Page 9 af 11 PCN Form — Versian 1.0 iVoW�mber 20Q$ Version F. Supplementary Informa#ion 1. Environmental Documentation [aWQ Requirement) 1 a. Does the project involve an expenditure of public (federallstateflocal) funds or the � Y�� ��o use of puafpc (federaf/state) land? 1 b. If yau answered "'yes" to the above, does the project require preparation of ar� environmenta� document pursuan# to th� requirernents oi the Natir�nal or State [] Yes ��Eo {t�orth Carol9na) Enuironmer�tal Policy Act (NEPAISEPA)? 1c. If you ar�swered "yes" ta the above, has the dacument re�iew been finalized I�y the 5fate Gfearing House? (ff sa, attach a copy of the NEPA or SEPA final approval 4ettes.) Q Yes ❑ No Comments: 2. ViolatiQns (I3WQ Requirement) 2a. ls the site in violation of DWQ Wetiand Rules �15A h1CAC 2H .D500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standarc�s, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .02�4)? 2b. Is this arr after-the-fact permit application? [� Yes � iVo 2c. If you answered "yes" to one or both of the above questions, pror�ide an explanation af the vio#atian(s): NIA 3. Cumulative Impacfis (DW(� Requirernent) 3a. Wilf this pro�ect {based on past and reasonably anticipated future impac�s) result in ❑ Yes � Mo additional tlevel�pment, which could impaet n�arby daw�stream water quality? 3b. ff yau an5wered "yes" to the abo�e, submit a qualitative or quantitative cumulati�� impacf analysis in aceordance wit9� the mas# recent DWQ policy. If yau answered "na," prowide a shor� narrative d�scription. NIA 4. Sewage f3�sposal (DWQ Requiretrient} 4a. Cfearly detail ti�e ultimate treatmerrt methads and dispositian (nan-dischar'ge or discharge) of wastewater generated from #he proposed praject, or a�ailabls capacity of the subject facility. NIA Page i 0 of 11 PCN Form — Version 1.(} EVavember 2(}08 Version �. Suppl�mentary Information, contirrued �. En�anger�d Species and Designated Crit9cal Habitat (Corps Requirementj 5a. Will ihis project occur in or near a� area with federally protected species or �,�,�s � No habitat? Si�. Haue yau checked with the USFWS coRCerning Endangerad Species Act � Yes � �Io impa�ts? ❑ Raleigh 5c. If yes, ir�dicate the USFV115 Field Office you h�ve contacted. ❑ Asheville 5d. WF�at daia sources did you usa to determine vsrhether your site would impact Endang�red Speeies or Designated Critical Habitat? 6. Essential Fish Habitat (Gorps Requirernentj 6a. Will this praject occur in or near an area designated as essentiai fish habitat? � Ye5 � Na 6b. What data sources did you use to determine whether your site wouEd irnpaet Essential Fish Habitat? 7. Wistoric or Prehistaeic Cultura! Resaurces (Carps Requirement) 7a. Will this project accur in ar near an area that the state, federal or tribal governments ha�e designated as ha�ing historic or cultural preservatian � Yes ❑ No status (e.g., National Ff�staric Trust designation or properties significant in Nor�h Carolina history and archaeoiogy)? 7b. What data saurces did yau use to determin� whether your site would irnpact historie or archeolpgical resources? $. Flaod Zone Designation (Carps Requirement} $a. Will this project occur in a FEMA-designated 1 DO-year floodplain? ❑ Yes ❑ f�o 8b. If yes, explain how proj�ct meets �EMA requirements: 8c. What source(sj did you usa ta make the flo4dplain deterrninatiQn? �a�k'�'►ei,n� ee�e. . l� ���c� ApplicantfAger�t's Printed Name ApplECant/Agent's Signature (Agent's signatu�re is valid onfy �f an authurization letter fram the applicant Date is provided.) �ag� 11 Of 11 PCf� Form — November 2pQ8 Version B F COPYRIGHT B&F Consulting, 2014 HYDE COUNTY SWAN QUARTER, NC 27885 748 OYSTER CREEK ROAD North Carolina DOT Swan Quarter Ferry Facility APPROXIMATE FLOOD LINE (SEE GENERAL NOTE #5) BUSH CONIFEROUS TREE DECIDUOUS TREE DIESEL FUEL LINE (PINT MARKS) ELECTRIC LINE (PAINT MARKS) END OF INFORMATION (SIGNAL STOPS) ESTIMATED CONTOURS (SEE GENERAL NOTE #3) ESTIMATED SPOT ELEVATION (SEE GENERAL NOTE #3) FENCE LINE (6' CHAIN LINK) FIRE HYDRANT FLAG POLE GEODETIC SURVEY MARKER GUARD RAIL GUY WIRE LIGHT POLE LIGHT POLE w/ CCTV MANHOLE / ACCESS COVER MAILBOX MARSH / SWAMP MONITOR WELL OVERHEAD UTILITY LINES POST / BOLLARD PROPERTY LINE (SEE GENERAL NOTE #6) RIGHT-OF-WAY (SEE GENERAL NOTE #6) SANITARY SEWER CLEANOUT SANITARY SEWER LINE (PAINT MARKS) SIGN (ONE POST) SIGN (TWO POST) SPOT ELEVATION STORM SEWER LINE TELECOMMUNICATION LINE (PAINT MARKS) TELECOMMUNICATION & ELECTRIC LINES (PAINT MARKS) TELEPHONE PEDESTAL TREE LINE UNDERGROUND ELECTRIC BOX UNKNOWN UTILITY LINE (PAINT MARKS) UTILITY POLE VENT PIPE WATER LINE (PAINT MARKS) WATER METER WATER VALVE EOI LEGEND DF 1.3 (est.) FH NGS "(NAME)" CCTV MW-1 SS 8.9 00" RCP T UEB WL WV CO W R/W UTILITY PLAN NOTES 1. ALL UTILITY PLANS ARE TO CONFORM TO ALL NCDOT AND NCDENR STANDARDS AND SPECIFICATIONS. 2. RELOCATION OF ALL SITE UTILITY SERVICES (INC. POWER, TELECOM AND PHONE) ARE TO BE COORDINATED WITH THE ELECTRICAL DRAWINGS. ANY DISCREPANCIES BETWEEN THE SITE DRAWINGS ARE TO FOLLOW THE ELECTRICAL DRAWINGS. 3. THE EXISTING LINES TO REMAIN - AS INDICATED ON THE DRAWINGS - SHALL BE PROTECTED AND REMAIN FUNCTIONAL THROUGHOUT CONSTRUCTION. 4. ANY OVERHEAD LIGHTS, HANDHOLDS, ELECTRICAL AND TELECOMMUNICATION LINES ARE SHOWN ON THESE PLANS FOR REFERENCE PURPOSES ONLY IN RELATION TO THE SEWER, WATER AND STORM LINES. PLEASE REFERENCE ELECTRICAL DRAWINGS (SHEET E0.3 FOR LIGHTING) FOR MORE INFORMATION. 5. ALWAYS MAINTAIN MINIMUM 24" VERTICAL CLEARANCE BETWEEN SEWER LINES AND NON-POTABLE WATERLINES WHERE THEY CROSS EACH OTHER. 6. ALWAYS MAINTAIN MINIMUM 18" CLEARANCE BETWEEN POTABLE WATERLINES AND SEWERMAINS WHERE THE SEWER CROSSES UNDER THE WATERLINE. 7. ALWAYS MAINTAIN MIN. 10' HORIZONTAL CLEARANCE BETWEEN POTABLE AND NON-POTABLE WATERLINES WHEN THEY ARE ADJACENT TO EACH OTHER. 8. ALL WATER, SEWER AND NON-POTABLE WATERLINES ARE TO HAVE A MINIMUM OF 3' SOIL COVERAGE TO PREVENT FREEZING. 9. SEWERLINE GRAVITY FLOW TO PUMP STATIONS ARE TO BE INSTALLED WITH CLEANOUTS LOCATED EVERY 100' ALONG THE LINE AT A MINIMUM. 10. ALL UTILITIES FROM BUILDING TO BE STUBBED OUT TO 5' OUTSIDE THE BUILDING OR AS SHOWN ON THE PLUMBING DRAWINGS BY THE BUILDING CONTRACTOR. BUILDING CONTRACTOR TO INSTALL SEWER CLEAN OUT AT TIE LOCATION. SITE UTILITY CONTRACTOR WILL PICK UP THE CONSTRUCTION WORK FROM THAT POINT ONWARD. SCHEDULING CONSIDERATION SHOULD BE MADE TO ENSURE THAT ADDITIONAL CLEANOUTS/CAPS ARE NOT REQUIRED. 11. STORMWATER PIPE DESIGN CALCULATIONS AND INVERTS ARE SHOWN ON SHEET C401. 12. SEWER UTILITY LINES ARE TO CONFORM TO ALL NCDENR/SWAN QUARTER SANITARY DISTRICT STANDARDS AND SPECIFICATIONS. 13. ALL NEW UTILITY LINES ARE TO KEEP THE DISTURBED AREA FOR CONSTRUCTION TO WITHIN 10' EITHER SIDE OF THE NEWLY INSTALLED UTILITY LINE. 14. ALL UNDERGROUND LINES OUTSIDE BUILDING FOOTPRINT (EXCEPT LAWN IRRIGATION LINES) SHALL BE REQUIRED TO HAVE A WARNING TAPE INSTALLED IN THE BACKFILL BETWEEN 6 INCHES AND 24 INCHES BELOW FINISHED GRADE, DIRECTLY OVER PIPING. SEE SHEET C703 FOR ADDITIONAL NOTES. 15. THE FIRE CONTRACT SHALL BEGIN WORK 1' ABOVE THE FINISHED FLOOR INSIDE THE BUILDING, SO THE SITE UTILITY CONTRACTOR WILL TAKE THE FIRE LINE FROM THE NEW CISTERN INTO THE BUILDING AND STUB OUT 1' ABOVE FFE. 16. POWER SCHEME IS TO FOLLOW ELECTRICAL DRAWINGS REGARDING REMOVAL OF EXISTING SITE LIGHTING/ BUILDING FEED LINES AND THEN THEIR RECONNECTION. 17. DREDGE BUILDING WILL BE CONSTRUCTED BY OTHERS. SITE WORK FOR THE DREDGE BUILDING AND INCLUDING PREPARATION OF PAD, FLOOR, GRAVEL ACCESS AND UTILITIES TO THE DREDGE BUILDING WILL BE BY OWNER (NIC). 18. ALL UNDERGROUND SEWER TANKS SHALL BE TRAFFIC RATED OR PROTECTED FROM TRAFFIC ACCESSIBILITY. 19. ANY RE-ROUTED ELECTRICAL, TELEPHONE, CABLE, CORS AND CCTV LINES ARE SHOWN HERE FOR GENERAL ROUTING LOCATION PURPOSES ONLY. COORDINATION WITH UTILITIES IS REQUIRED, SEE ELEC SHEETS FOR CONDUIT. 20. WATER TANK FOR PRIVATE FIRE PROTECTION MUST BE INSTALLED IN ACCORDANCE WITH NFPA 22 BY PLUMBING CONTRACTOR, SEE SHEET FP101 21. ALL UNDERGROUND LINES OUTSIDE OF BUILDING FOOTPRINT MUST BE IDENTIFED WITH WARNING TAPE DIRECTLY OVER PIPING. SEE SHEET C703. 22. SEE SHEET C501 FOR MORE DETAILED CENTRAL CONSTRUCTION AREA INFORMATION. 23. ALL BELOW GROUND SEWER UTILITIES LOCATED 5' OUTSIDE THE BUILDING FOOTPRINT (EXCEPTING GREASE TRAP), AND ALL STORMWATER AND WATER SERVICE BELOW GROUND OUTSIDE THE BUILDING FOOTPRINT SHALL BE INSTALLED BY THE SITE UTILITY CONTRATOR PER THIS PLAN AND COORDINATED WITH THE ARCHITECTURAL AND PME PLANS (SEE P101). 24. ALL CONDUIT SHOWN FOR UNDERGROUND UTILITIES IS TO BE INSTALLED BY CONTRACTOR UNLESS OTHERWISE INDICATED. SEE ELECTRICAL DRAWINGS. WIRES FOR THE SECURITY LINES ARE TO BE INSTALLED BY OTHERS. 25. DIRECTIONAL BORES MAY BE SUBSTITUTED FOR SEWER FORCE MAIN LINES WHERE COST EFFECTIVE TO DO SO. 26. ALL TEMPORARY SERVICE (EXCLUDING WATER AND SEWER) TO EXISTING BUILDING SHALL BE OVERHEAD. ALL PERMANENT SERVICES TO NEW BUILDING SHALL BE UNDERGROUND. 27. REFERENCE SEQUENCE OF EVENTS, SEE C702, DETAIL 9. SILT FENCE (C702, DETAIL 1) TREE PROTECTION FENCE (C702, DETAIL 6) SILT FENCE OUTLET (C702, DETAIL 4) INLET PROTECTION (C702, DETAIL 3) RIPRAP PAD (C702, DETAILS 5 & 8) TEMPORARY ROCK SILT CHECK TYPE A (C702, DETAIL 11) DISTURBED AREA TEMP CHAIN LINK FENCE TEMPORARY CONSTRUCTION ENTRANCE (C702, DETAIL 2) EROSION CONTROL LEGEND SF TPF TPF SF SF C509 UTILITIES PLAN AND PROFILE OYSTER CREEK RD