HomeMy WebLinkAbout20141099 Ver 1_Application_20141017aF `� °� rFR
o� ..9,��
r
�
n T
A. Appficant Information
�ffice Use Only:
Corps action ID no.
DVV4 project no.
Fprm Version 1.0 November 2008
Pre-Construction Notification (PCf�) Form
1. Processing
1 a. Type(s� af appraual sought from the
�o�p�: � Section 404 Permit ❑ Section 10 Permit
1 b. Speeify Nationwide Permit (I�WP) number: NW 12 or General Permit (GP) number:
� c. Has the NWP ar GP number been verified by the Corps? � Ye5
1 d. Type{s} of appro�ai sou�ht from the DWQ (ch�ck all that apply): �
� 40� Water Quality Certifcation — Regular ❑ Non-404 Jurisdictio�al Generak Permit
0 4n'! Water Quality Cer#ification — Express ❑ Riparian Suffer Authorization
1 e. Is this notificaiion solely for the recc�rd For the record only for DWQ 4Q1
because written approval is noi required? Certi#icataan.
❑ Yes � No
1f. ls payment �nto a mitigation bank or in-lieu fee program proposed #or mifigation
of impac#s? If so, attaeh the accep#ance lettef from mitigation bank ar in-lieu
fee program.
❑ No
For the recard onfy for Corps Psrmit:
❑ Yes � Na
❑ Yes � No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h; ��'es
be4ow.
1 h. Is the project located within a NC DCM Area of Environmental Goneerr� (AEC)? I� Yes
2. Project Infarmation
2a. �lame of projeci: Swan Quarter Ferry Facility
2b. Caunty: �iyde
2c. Nearest municipality 1 town: Swan Qu�rter �
2d. Subdivision name: N/A �
2�. NCDOT only, T.LP. or state �- �{}03 41'149.1.1 I�
project na: �
3, Owner Information
3a. Name on Recard�d Deed: NGQOT Ferry Divisian
3b. Deed Baok a�d Page I�o. �t1A
3c. Respansible Par#y (for LLC if C��herine Peele
appl+cable):
3d. Street address: 159 Lucinda Lance 'i
3e. City, state, zip: Powells Point, NG 27966
3#. Telephone no.: 252-491-2635 I
3g. Fax no.: 252-473-1A90
3h. Email address: ccipeele@ncdot.go�
❑ No
❑ No
Page 1 of 11
PCN Form — Ve'rsion 1.0 No�emf�er 2�708 Version
Section A. Applican't Information, con#inued
4. Applicant Information (if different frorn ow�erj
4a. Applicant is: � Agent ❑ Other, specify:
4b. Nar��: Caiherine �eele
4c. Business narne NIA
(if applicable�:
4d. Street address: 159 Lucinda Lance
4�. City, state, zip: Powells PQint, f�C 27966
4f. Telephone no.: 252-491-2635
4g. Fax no.: 252-473-1490
4h. Email address: cdpeele@ncdot.go�
5. AgentlConsultant Infprmatian �if applicabls)
5a. �ame: NIA
5b. Business name
(if app�icable}:
5c. Street address:
�d. City, state, zip:
5e. Telephone no.:
Sf. Fax no.:
5g. Email address:
Page 2 of 11
PCfV Fcrrm — November 2008 Version
B. Project Information and Prior Project Histary
'I. Property Ider�tiiicatian
1a. Property identification no. (tax P16J or parcel ID):
1 b. Site coordinates (in decimal degrees):
1 c. Pro�erty size:
2. Surface Waters
2a. Na�ne of nearest body of water (stream, river, �tc.) to
proposed project:
2b. Water QuaCity Glassification Qf nearest receiving water:
I�IA �
`N - `W
S.Q acres I
Pamlico 5oundl
�c. Fti�uer basin: Tar - Pamlico
3. Project D�scription
3a. Qescribe the existing conditions on the site and the generaf land use in th� �ici
applicatiort:
This property is used by the N.C. Ferry Di�risian to transfer autorr�abiles and pa
Island.
3b. List the total estimated acreage of al� existing +.nretlancts on the property:
�.0 acres
3e. List the total estimated finear feet of all existing streams (intermittent and peren
0
3d. Explain the purpose of the proposed project:
To cannect fer�y facility sewer line with the city's sewer line.
3e. �escribe the overall prflject in detail, Fn�luding the type of equipment to be use
A new sewer line will be instal�ed for the Swan Quarter Ferry Facility building. '
eontraetar who wifi directionally bore the line space deep enough not tv Fmpact
installatian will allow ihe faeilities line to be connected #o the city of Swan Quar
4. Jurisdictidnaf Determinations
4a. Have jurisdictional wetland or stream deterrrainatians by the
Carps ar State b�en requested or ob#ained for tY�is praper#y 1 ❑ Yes
projeet (ir�cluding all prior phases} in th� past?
4b. If th� Corps made the j�risdictional deterrnination, uvhat type
of dete�mination w�s made? 0�eeliminary
4.c. �f yes, who cEelFneated the jurisdictional areas? AgencylCansu
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determin
5. Praj�ct History
5a. Have permits or c�riifications been requesked ar obtained for
this projee# (includin� all prior phases) in the past?
5b. If y�s, explain in detail �ccording to "help file" instructions.
CAMA minor modificat�on permit 202-86 Ex. 12-31-2D16
6. Future Project Plans
�a. Is this a phased project?
!6b. If yes, explarr�.
iity af the project at the time of this
,sengers firom F�atteras to Qcracoke
ial} on the proper�y:
iis sawer lin� wiE! be installed by the
�ny futur� culvert repfaeement. The
:r's line fot funciional �se.
� No ❑ Ur�knowr�
] Fina!
ant Company:
�tipns and attach documentation.
� Yes I� No
I
I
� Yes � No
❑ UnEcnown
Page 3 of fi 1
PGiU Form — Versian 1.0 No�ember 2Q08 Version
C. Proposed Impac#s Inventory I
1. lmpac�s $umroiary
1 a. Which sectians v+rere corrtpleteci below far yaur pro}ect {check all t�at app9y}: I
i
❑ We#lands [] Sfreams - tributari�s Q Buffers
❑ apen Waters ❑ Pond Construction
2. Wefland impacts I
If there are we�land impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. I 2f.
V1letlar�d impact Type of jurisdiction
number — Type of Type of wetland �orested {Corps � 404, 10 Area of impact (acres)
Pe�manent (P) or ir�pact {if knovun) DWQ — nan-4Q4, other)
Tem orar T '
W1 ❑ P❑ T ❑ Yes ❑ No � Corps �
❑ D1NQ
W2 ❑ P❑ T ❑ Yes ❑ No � Gorps
❑ t]WQ
W3 ❑ �' ❑ � ❑ Yes ❑ No � Corps I
[] DV'UQ I
W4 ❑ P ❑ T ❑ Yes ❑ No � �arps �
CI DWQ �
W5 ❑ P � T ❑ Yes ❑ No � Corps !
� DWQ
W6 ❑ P C� T C� Y"es ❑ f�o � C�rps '
❑ DWQ �
2g. Total wetland impaets
2h. Comrrtents: I
3. Stream Irnpacts _
If there are p�r�nnial or intermittent stream impaets (inciuding terr�porary impacts} proposed on tne site, then camplet� �his
ques�ion for all stream sites impacted.
3a. 3b. 3c. 3d. 3e.j 3�.
Stream impaet Type of Stream name Perennial (��R) or A,�etage stream widfh (fe�et) ��p��t
nutnber - impact intermittent (INT)? � length
Perr�anent (P) or i (lin�ar feet)
Temporary (T)
51 � P❑ T ❑ PER ❑ INT
S2 ❑ P �� ❑ PER ❑ iNT
S3 ❑ P 0 T ❑ PER ❑ INT'
S4 ❑ P❑ T' ❑ PER ❑ INT
55 ❑ P(� T ❑ PER ❑ INT
S6 ❑ P❑ T ❑ PEF2 ❑ INT � .
3g. iotal stream and tribu#ary impacts
3h. Cornments:
Page 4 of 11 ;
PCfV Farm —;Version `1.0 Nauember 200$ Ve�sion
C. Proposed Impacts Inventory, continued
4. Qpen Water Impacts
If there ar� �roposed impacts to lakes, ponds, estuaries, tributaries, sounds, tY�e A#lantic Ocean, or any c�ther apen water of
the 11.S. fhen individuall list all a en water irn acts below. �
4a. 4b. 4c. 4d. I 4e.
O�en water Name of
impaet nur�ber waterbody Type of impact Water 'ody type Area of impaet {acres}
- Perrna�ent (it
(F) or applieable}
Tem c�ra T j
fl1 ❑POT �
C}2 ❑P❑7
(]3 ❑P❑T
44 ❑P❑T I
4g. Comments:
4#. Total open water impacts
Page5oil� I
pGN Form -� Nav€�mber 2008 Version
C. Proposed Impacts Inventory, continued
5. Pond or Lake Gonstruction �I
If and ar lake construction ro osed, then com lete the ehart b�:low. �
5a. 5b. 5c. 5d. 5�.
Wetland Impacts (acresj Stream Impaets �feet} Upland
Pond fD Prapos�d use or � (acres)
numb�r pu�p�se ofi pond i
Flooded Fill�d Excavated Flooded ; Filled Excavated Flooded
P1
P2
Sf. TotaY ;
�
5g. Cammen#s:
5h. Is a dam high hazard permit requi�'ed?
❑ Yes [] No If yes, p�rmit I� no:
5�. Expected pand surface area (acres): �
5j. Size of pond watershed (acres): i�
5k. Methnd of cor�struction: �
6. Buffer Impacxs (far DWQ) �
�
If project wilf impact a protected riparian buffer, then complete �he chart belavw. ff y�s, then individually list all buifer im�acts
below. If an im acts re u�re miti ation, then au MUST fili aut Section R c�f thi5 farm.
�
6a.
❑ IVeuse � Tar-Pamlico 0 Qther:
Project is in which prokected basin? ❑ Caiawba ❑ Randleman
fib. 6c. 6d. 6e. 6f. 6g.
Buffer impact �
n�mber — Reasan Buffer Zone 1 im�act (square Zon� 2 impact
Perrnanent (P} far impact Stream name mitigation feet) (square feet)
or Temporary required? �
T '
B1 [,P❑T ❑Yes ❑No
B2 �P❑T ❑Yes ❑No
B3 �P❑T ❑Yes []No
6f�. Total buffer impacts
6i. Comments: I
Page 6 of 'I 1 '
PCN Forirn — November 2008 Version
D. Impact Justification and Mitigation
1. Avoidance anci Minimizaticrn
1 a, Sp�cifically describe measures taken to aVOid or rr3inimize the prapased imp�cfs in ciesigning project.
1 b. Specifically describe measures taken to �r�aid or minimize th� proposed impacts thrt�ugh constructivn kechniqu�s.
The sewer line space will bs directionally bored deep enough as ta not impact any future culWert �eplacement activities or
maintenance work
2. Campensatory Mitigation for Impacts to Waters of the U.S. or Waters of th:e State
2a. Daes the proj�ct require Compensatory Mitigation for ❑ Yes � fVo
impacts to Waters of the fJ.S. or Wat�rs of the State?
2b. If yes, mitigatian is required by (cneck all that apply}: ❑ DUVQ [] Corps
0 Mitigation bank
2c. If yes, which mitigation aption will be us�d for �his
project? ❑ Payment #o in-Geu fee program
0 Perr�ittee Res�onsible Mitigatian
3. Com}�lete if Usi�g a 14litigation Bank
3a. Narr�e of Mitigation Bank: NIA
3b. Credits Purchased (attach receipt and let�er) Type C�uantity
3c. Camments:
4. Complete if Maicin� a Payment to In-lieu Fee Prograrr3
4a. Ap�proaal letter from in-lieu €ee program is attached, [� Yes
4b. Stream mitigation requested: linear feet
4c. if using stream mitigation, stream temperature: warm, cool, cold
4d. Buffer mitigation requested (DWQ flnly}: square feet
��. Riparian wetland mitigation requested: acres
4f. Non-r�}�arian wetland mitigation requested: acrss
4g. Coastal (tidal) w�tland mit�gation request�d: acres
4h.. Cammenis: .
5. Complete if Using a Permi#tee Responsible Mitigation Plan �
5a. I� using a permittee responsibie m�tigation plan, proWide a description of the proposed mitigation plar�.
N/A
Page 7 of 1 �
PCN Farm — Version 1.� iVovember 2{l4$ Version
D. Impact Justification and Mitigation, continued
�
I
6. Buffer Mitigation (5�ate Regula#ed Riparian Buffer Rules) — required by f3WQ
6a. Wil1 the project result in an impact within a protected riparian buffer that requir�s ❑ Yes � No
buffer m�tigation?
I
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer #hat requires mitic�atio�. Calculate ihe
amourst of mitigation required.
Zane Reason for impact Total impact Multiplier �equired mitigation
(square feet) (square feet}
Zone 1 3(2 fQr Catawba)
Zone 2 'I .5
Total buifer mitigation required:
6c. If buffer mitiga#ion is required, discuss vuhat type of mitigation is proposed (e.g., payment to prE�ate mitigation bank,
per�nittee responsibEe riparian buffer restaraiion, payment into an approved in-lieu fee fund).
6d. Corr�ments:
Page8o�11
PCN Form — November 20�8 Version
E. Starmwater Management and Diffuse Fiow Plan {required by DWQ) �
1. Diffuse Flow Pian
1a. Does the project include or is it ad�acent to protected rip�rian buffers identified � Yes � No
within one of the NG FZ9�arian Buffer Pro�action Rules? �
1 b. If yes, then is a diffuse flow plan included? [] Yes ❑ No
2. Determination if the Pro"ect Requires a Stormwater Mana emen# Plan
�
2a. €�oes #he �raject require a Nan-4U4 Jurisdictional Genera! Permit'? ' [] Y�s � No
2b. Is the project subjeet #o General Gertificaiion 37Q4 or 3705? Q Yes ��lo
3. Deterr�ination of Stormwater Review Jurisdiction
3a. Is this project subject to any of the fQllowing state-implemented stormwater ' ❑ C��stal counties
management progrart�s (check al! fhai apply)? I ❑ HQ�N
❑ ORW
I€ so, attach one copy of the approval [�.tter fram the DWQ and one copy of the I ❑ Sessio� Law 2006-246
approved stormwater management �lan. I �J Other:
3b. Ir� which local governrn�nt's jurisdiction is this project? II
3c. Is this iocal go�ern�ent certified to imp�ement a state stormwater program? [� Yes ❑ Ner
If so, a�tach one copy of the appr€rval letter frQm the local government and qne copy
of the apprnved stormwater management plan (or one copy of the approved
Stc�rrr►water rrranagement plan s{arnp�d as appro�ed).
4. Informaiian Required fpr DWQ 401 Unit Starrnwat�sr Review
4a. What i5 the overall ercent im erviousne5s accflrdin to the most current site {an? [VIA
4b. DoeS this project contain any areas #hat meet the criteria for "high cEensity" per � Yes � No
General Certifcations 3704 ar�d 3705? �
I
4c. Ifi th� site is aver 24% impe�rious andlor contains high density areas, then provide a brief narrati�e deseription of the
stormwater management plan.
NIA
�4d. Has a completed BMP Supplement Form with all required items been submittecl � Yes � No
for each starmwater BMP?
-- - - I
Page 9 af 11
PCN Form — Versian 1.0 iVoW�mber 20Q$ Version
F. Supplementary Informa#ion
1. Environmental Documentation [aWQ Requirement)
1 a. Does the project involve an expenditure of public (federallstateflocal) funds or the � Y�� ��o
use of puafpc (federaf/state) land?
1 b. If yau answered "'yes" to the above, does the project require preparation of ar�
environmenta� document pursuan# to th� requirernents oi the Natir�nal or State [] Yes ��Eo
{t�orth Carol9na) Enuironmer�tal Policy Act (NEPAISEPA)?
1c. If you ar�swered "yes" ta the above, has the dacument re�iew been finalized I�y the
5fate Gfearing House? (ff sa, attach a copy of the NEPA or SEPA final approval
4ettes.) Q Yes ❑ No
Comments:
2. ViolatiQns (I3WQ Requirement)
2a. ls the site in violation of DWQ Wetiand Rules �15A h1CAC 2H .D500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standarc�s, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .02�4)?
2b. Is this arr after-the-fact permit application? [� Yes � iVo
2c. If you answered "yes" to one or both of the above questions, pror�ide an explanation af the vio#atian(s): NIA
3. Cumulative Impacfis (DW(� Requirernent)
3a. Wilf this pro�ect {based on past and reasonably anticipated future impac�s) result in ❑ Yes � Mo
additional tlevel�pment, which could impaet n�arby daw�stream water quality?
3b. ff yau an5wered "yes" to the abo�e, submit a qualitative or quantitative cumulati�� impacf analysis in aceordance wit9� the
mas# recent DWQ policy. If yau answered "na," prowide a shor� narrative d�scription.
NIA
4. Sewage f3�sposal (DWQ Requiretrient}
4a. Cfearly detail ti�e ultimate treatmerrt methads and dispositian (nan-dischar'ge or discharge) of wastewater generated from
#he proposed praject, or a�ailabls capacity of the subject facility.
NIA
Page i 0 of 11
PCN Form — Version 1.(} EVavember 2(}08 Version
�. Suppl�mentary Information, contirrued
�. En�anger�d Species and Designated Crit9cal Habitat (Corps Requirementj
5a. Will ihis project occur in or near a� area with federally protected species or �,�,�s � No
habitat?
Si�. Haue yau checked with the USFWS coRCerning Endangerad Species Act � Yes � �Io
impa�ts?
❑ Raleigh
5c. If yes, ir�dicate the USFV115 Field Office you h�ve contacted.
❑ Asheville
5d. WF�at daia sources did you usa to determine vsrhether your site would impact Endang�red Speeies or Designated Critical
Habitat?
6. Essential Fish Habitat (Gorps Requirernentj
6a. Will this praject occur in or near an area designated as essentiai fish habitat? � Ye5 � Na
6b. What data sources did you use to determine whether your site wouEd irnpaet Essential Fish Habitat?
7. Wistoric or Prehistaeic Cultura! Resaurces (Carps Requirement)
7a. Will this project accur in ar near an area that the state, federal or tribal
governments ha�e designated as ha�ing historic or cultural preservatian � Yes ❑ No
status (e.g., National Ff�staric Trust designation or properties significant in
Nor�h Carolina history and archaeoiogy)?
7b. What data saurces did yau use to determin� whether your site would irnpact historie or archeolpgical resources?
$. Flaod Zone Designation (Carps Requirement}
$a. Will this project occur in a FEMA-designated 1 DO-year floodplain? ❑ Yes ❑ f�o
8b. If yes, explain how proj�ct meets �EMA requirements:
8c. What source(sj did you usa ta make the flo4dplain deterrninatiQn?
�a�k'�'►ei,n� ee�e.
. l� ���c�
ApplicantfAger�t's Printed Name ApplECant/Agent's Signature
(Agent's signatu�re is valid onfy �f an authurization letter fram the applicant Date
is provided.)
�ag� 11 Of 11
PCf� Form — November 2pQ8 Version
B
F
COPYRIGHT
B&F
Consulting,
2014
HYDE
COUNTY
SWAN
QUARTER,
NC
27885
748
OYSTER
CREEK
ROAD
North
Carolina
DOT
Swan
Quarter
Ferry
Facility
APPROXIMATE FLOOD LINE (SEE GENERAL NOTE #5)
BUSH
CONIFEROUS TREE
DECIDUOUS TREE
DIESEL FUEL LINE (PINT MARKS)
ELECTRIC LINE (PAINT MARKS)
END OF INFORMATION (SIGNAL STOPS)
ESTIMATED CONTOURS (SEE GENERAL NOTE #3)
ESTIMATED SPOT ELEVATION (SEE GENERAL NOTE #3)
FENCE LINE (6' CHAIN LINK)
FIRE HYDRANT
FLAG POLE
GEODETIC SURVEY MARKER
GUARD RAIL
GUY WIRE
LIGHT POLE
LIGHT POLE w/ CCTV
MANHOLE / ACCESS COVER
MAILBOX
MARSH / SWAMP
MONITOR WELL
OVERHEAD UTILITY LINES
POST / BOLLARD
PROPERTY LINE (SEE GENERAL NOTE #6)
RIGHT-OF-WAY (SEE GENERAL NOTE #6)
SANITARY SEWER CLEANOUT
SANITARY SEWER LINE (PAINT MARKS)
SIGN (ONE POST)
SIGN (TWO POST)
SPOT ELEVATION
STORM SEWER LINE
TELECOMMUNICATION LINE (PAINT MARKS)
TELECOMMUNICATION & ELECTRIC LINES (PAINT MARKS)
TELEPHONE PEDESTAL
TREE LINE
UNDERGROUND ELECTRIC BOX
UNKNOWN UTILITY LINE (PAINT MARKS)
UTILITY POLE
VENT PIPE
WATER LINE (PAINT MARKS)
WATER METER
WATER VALVE
EOI
LEGEND
DF
1.3
(est.)
FH
NGS "(NAME)"
CCTV
MW-1
SS
8.9
00"
RCP
T
UEB
WL
WV
CO
W
R/W
UTILITY PLAN NOTES
1. ALL UTILITY PLANS ARE TO CONFORM TO ALL NCDOT AND NCDENR
STANDARDS AND SPECIFICATIONS.
2. RELOCATION OF ALL SITE UTILITY SERVICES (INC. POWER, TELECOM AND
PHONE) ARE TO BE COORDINATED WITH THE ELECTRICAL DRAWINGS. ANY
DISCREPANCIES BETWEEN THE SITE DRAWINGS ARE TO FOLLOW THE
ELECTRICAL DRAWINGS.
3. THE EXISTING LINES TO REMAIN - AS INDICATED ON THE DRAWINGS - SHALL
BE PROTECTED AND REMAIN FUNCTIONAL THROUGHOUT CONSTRUCTION.
4. ANY OVERHEAD LIGHTS, HANDHOLDS, ELECTRICAL AND TELECOMMUNICATION
LINES ARE SHOWN ON THESE PLANS FOR REFERENCE PURPOSES ONLY IN
RELATION TO THE SEWER, WATER AND STORM LINES. PLEASE REFERENCE
ELECTRICAL DRAWINGS (SHEET E0.3 FOR LIGHTING) FOR MORE INFORMATION.
5. ALWAYS MAINTAIN MINIMUM 24" VERTICAL CLEARANCE BETWEEN SEWER
LINES AND NON-POTABLE WATERLINES WHERE THEY CROSS EACH OTHER.
6. ALWAYS MAINTAIN MINIMUM 18" CLEARANCE BETWEEN POTABLE WATERLINES
AND SEWERMAINS WHERE THE SEWER CROSSES UNDER THE WATERLINE.
7. ALWAYS MAINTAIN MIN. 10' HORIZONTAL CLEARANCE BETWEEN POTABLE AND
NON-POTABLE WATERLINES WHEN THEY ARE ADJACENT TO EACH OTHER.
8. ALL WATER, SEWER AND NON-POTABLE WATERLINES ARE TO HAVE A MINIMUM
OF 3' SOIL COVERAGE TO PREVENT FREEZING.
9. SEWERLINE GRAVITY FLOW TO PUMP STATIONS ARE TO BE INSTALLED WITH
CLEANOUTS LOCATED EVERY 100' ALONG THE LINE AT A MINIMUM.
10. ALL UTILITIES FROM BUILDING TO BE STUBBED OUT TO 5' OUTSIDE THE
BUILDING OR AS SHOWN ON THE PLUMBING DRAWINGS BY THE BUILDING
CONTRACTOR. BUILDING CONTRACTOR TO INSTALL SEWER CLEAN OUT AT TIE
LOCATION. SITE UTILITY CONTRACTOR WILL PICK UP THE CONSTRUCTION
WORK FROM THAT POINT ONWARD. SCHEDULING CONSIDERATION SHOULD BE
MADE TO ENSURE THAT ADDITIONAL CLEANOUTS/CAPS ARE NOT REQUIRED.
11. STORMWATER PIPE DESIGN CALCULATIONS AND INVERTS ARE SHOWN ON
SHEET C401.
12. SEWER UTILITY LINES ARE TO CONFORM TO ALL NCDENR/SWAN QUARTER
SANITARY DISTRICT STANDARDS AND SPECIFICATIONS.
13. ALL NEW UTILITY LINES ARE TO KEEP THE DISTURBED AREA FOR
CONSTRUCTION TO WITHIN 10' EITHER SIDE OF THE NEWLY INSTALLED UTILITY
LINE.
14. ALL UNDERGROUND LINES OUTSIDE BUILDING FOOTPRINT (EXCEPT LAWN
IRRIGATION LINES) SHALL BE REQUIRED TO HAVE A WARNING TAPE INSTALLED
IN THE BACKFILL BETWEEN 6 INCHES AND 24 INCHES BELOW FINISHED GRADE,
DIRECTLY OVER PIPING. SEE SHEET C703 FOR ADDITIONAL NOTES.
15. THE FIRE CONTRACT SHALL BEGIN WORK 1' ABOVE THE FINISHED FLOOR
INSIDE THE BUILDING, SO THE SITE UTILITY CONTRACTOR WILL TAKE THE FIRE
LINE FROM THE NEW CISTERN INTO THE BUILDING AND STUB OUT 1' ABOVE FFE.
16. POWER SCHEME IS TO FOLLOW ELECTRICAL DRAWINGS REGARDING
REMOVAL OF EXISTING SITE LIGHTING/ BUILDING FEED LINES AND THEN THEIR
RECONNECTION.
17. DREDGE BUILDING WILL BE CONSTRUCTED BY OTHERS. SITE WORK FOR THE
DREDGE BUILDING AND INCLUDING PREPARATION OF PAD, FLOOR, GRAVEL
ACCESS AND UTILITIES TO THE DREDGE BUILDING WILL BE BY OWNER (NIC).
18. ALL UNDERGROUND SEWER TANKS SHALL BE TRAFFIC RATED OR
PROTECTED FROM TRAFFIC ACCESSIBILITY.
19. ANY RE-ROUTED ELECTRICAL, TELEPHONE, CABLE, CORS AND CCTV LINES
ARE SHOWN HERE FOR GENERAL ROUTING LOCATION PURPOSES ONLY.
COORDINATION WITH UTILITIES IS REQUIRED, SEE ELEC SHEETS FOR CONDUIT.
20. WATER TANK FOR PRIVATE FIRE PROTECTION MUST BE INSTALLED IN
ACCORDANCE WITH NFPA 22 BY PLUMBING CONTRACTOR, SEE SHEET FP101
21. ALL UNDERGROUND LINES OUTSIDE OF BUILDING FOOTPRINT MUST BE
IDENTIFED WITH WARNING TAPE DIRECTLY OVER PIPING. SEE SHEET C703.
22. SEE SHEET C501 FOR MORE DETAILED CENTRAL CONSTRUCTION AREA
INFORMATION.
23. ALL BELOW GROUND SEWER UTILITIES LOCATED 5' OUTSIDE THE BUILDING
FOOTPRINT (EXCEPTING GREASE TRAP), AND ALL STORMWATER AND WATER
SERVICE BELOW GROUND OUTSIDE THE BUILDING FOOTPRINT SHALL BE
INSTALLED BY THE SITE UTILITY CONTRATOR PER THIS PLAN AND COORDINATED
WITH THE ARCHITECTURAL AND PME PLANS (SEE P101).
24. ALL CONDUIT SHOWN FOR UNDERGROUND UTILITIES IS TO BE INSTALLED BY
CONTRACTOR UNLESS OTHERWISE INDICATED. SEE ELECTRICAL DRAWINGS.
WIRES FOR THE SECURITY LINES ARE TO BE INSTALLED BY OTHERS.
25. DIRECTIONAL BORES MAY BE SUBSTITUTED FOR SEWER FORCE MAIN LINES
WHERE COST EFFECTIVE TO DO SO.
26. ALL TEMPORARY SERVICE (EXCLUDING WATER AND SEWER) TO EXISTING
BUILDING SHALL BE OVERHEAD. ALL PERMANENT SERVICES TO NEW BUILDING
SHALL BE UNDERGROUND.
27. REFERENCE SEQUENCE OF EVENTS, SEE C702, DETAIL 9.
SILT FENCE (C702, DETAIL 1)
TREE PROTECTION FENCE (C702, DETAIL 6)
SILT FENCE OUTLET (C702, DETAIL 4)
INLET PROTECTION (C702, DETAIL 3)
RIPRAP PAD (C702, DETAILS 5 & 8)
TEMPORARY ROCK SILT CHECK TYPE A (C702, DETAIL 11)
DISTURBED AREA
TEMP CHAIN LINK FENCE
TEMPORARY CONSTRUCTION ENTRANCE (C702, DETAIL 2)
EROSION CONTROL LEGEND
SF
TPF
TPF
SF SF
C509
UTILITIES PLAN
AND PROFILE
OYSTER CREEK RD