HomeMy WebLinkAbout20070988 Ver 1_Certification of Completion_20070920i O°t ~ ~>t~ ~
~ L~~~JV\J` r
?Tt7~ .-r
DW'Q Project No.: 07 D `~ 4~
County: 1n~ ake
Applicant: rJC'DoT ~~~ S~ J. W. ~ow~-0.v1 ~ 7 `.
Project Name: 52 2'.,09 (,jr.~g ~y,~c.e (Z~) - SCGonc/aty root/ corlt~Nt~'o/I
Date of Issuance of 401 Water Quality Certification: .J „~r~ e ~ ~ 2o0-J
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form
maybe returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
I, _ ~• W • ~owvl,.aY~ `~. E. ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: O ~,.~ .~~ - Date: ~! X7107
Agent's Certification
I, `~ ,hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specificatiorlsrrd other supporting materials.
r~,
Signature: Date:
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
~~f ~
~~~~
s ~,~~
do Fti~; ~
9y~r~q~~ ~~'O 0
~P ~U ~~ ~~
.~,.
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893! Internet: htto:!!h2o.enr.state.nc.usincwetlands
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen Sullins, Director
Division of Water Quality
An Equal OpportunitylAffirmative Action Empbyer- 50% Recycled/10% Post Consumer Paper