Brad and Hannah,
Attached please see my photos, taken 9/14/2022 of the subject bridge’s temporary detour area.
The fill and fabric that was placed for the temporary detour has been removed. After walking the
area, Sean and I thought that the elevations in the temporary detour areas that were identified as
wetlands sufficiently matched the elevations of the adjacent, undisturbed wetland areas. Per the
contract, the wetland areas within the temporary detour will be planted with tree seedlings
according to the wetland reforestation plan. The seasonal limitation on the replanting states that
the contractor will need to replant between November 15th and March 15th. We did not think that
disking and ripping the areas which will be reforested is needed. We thought that this may cause
more disturbance to the existing root mat.
Please let us know if you have any questions or if you would like to visit the site.
Thank you,
Anneliese
Anneliese Westphal
Environmental Senior Specialist
Division 3
NCDOT- Division of Highways
910 341 2000 office
910 604 1330 mobile
910 675 0143 fax
awestphal@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429-5647
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.