Loading...
HomeMy WebLinkAboutB-5639 Duplin Bridge 36 temporary detour removalFrom:Westphal, Anneliese To:Shaver, Brad E SAW; Sprinkle, Hannah H Cc:Farrell, Sean C; Gingrich, Sophia E Subject:B-5639 Duplin Bridge 36 temporary detour removal Date:Monday, September 26, 2022 11:14:38 AM Attachments:image001.png B-5639 temp. rock toe protection removal IMG_6060.jpg B-5639 detour looking north IMG_6053.jpg B-5639 detour looking south IMG_6058.jpg B-5639 detour looking southIMG_6054.jpg Brad and Hannah, Attached please see my photos, taken 9/14/2022 of the subject bridge’s temporary detour area. The fill and fabric that was placed for the temporary detour has been removed. After walking the area, Sean and I thought that the elevations in the temporary detour areas that were identified as wetlands sufficiently matched the elevations of the adjacent, undisturbed wetland areas. Per the contract, the wetland areas within the temporary detour will be planted with tree seedlings according to the wetland reforestation plan. The seasonal limitation on the replanting states that the contractor will need to replant between November 15th and March 15th. We did not think that disking and ripping the areas which will be reforested is needed. We thought that this may cause more disturbance to the existing root mat. Please let us know if you have any questions or if you would like to visit the site. Thank you, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.