Loading...
HomeMy WebLinkAbout20211495 Ver 1_More Info Received_20220722 (2)Strickland, Bev From: debbiew75@charter.net Sent: Friday, July 22, 2022 12:59 PM To: Luck, Cameron A; Harding, Kimberlee k; Perry, John M; Dunn, Maria T. Subject: [External] 8733 Bald Eagle Lane Attachments: Revised Narrative.docx; dcm-mp2.pdf; REVISED dcm-mp4.pdf; REVISED Proposed Structures.pdf; X-Sections.pdf Follow Up Flag: Follow up Flag Status: Completed CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. All, After discussions with Chris and Michelle Myers at 8733 Bald Eagle Lane in regard to various agency comments and concerns, I have revised the proposed structures to reduce overall impacts. Please see the attached revised drawings, M-P forms and Narrative and feel free to contact me (910)612-0402 if you have any questions. Thank you, Debbie i Narrative Revised 1/31/22 As acting agent for Chris and Michelle Myers, I am submitting a CAMA Major Permit application for their property located at 8733 Bald Eagle Lane, adjacent to Futch Creek, Wilmington, in New Hanover County. It should be noted that based on initial comments/concerns from NCDWR, NCDMF and NC Wildlife, we have made several changes to the proposed project. The existing docking facility will be removed and a new 6' x 99' pier will be constructed terminating in a new 20' x 20' covered platform. A new floating dock measuring 8' x 40' (this has been reduced by 2' in length and we've eliminated the attached kayak launch proposal) will be installed waterward of the covered platform and will extend out to the existing pier -head line (which is an additional 1' waterward on the western end and 1'/2' waterward on the eastern end of the original proposal). A new 14' x 14' boatlift will be located on the western end of the floating dock and will extend (an additional 1' waterward of the original proposal) out to the existing pier -head line A 12' x 12' "sling type" boatlift will be installed on the eastern end of the floating dock and will extend out to the existing pier -head line. This equates to an additional 1'/2' waterward of the original (14' x 14') proposal and a 2' x 2' reduction in size as well as a change from a regular boatlift to a "sling type" lift, in essence, these changes will locate the new lift a total of 3'/2' waterward from the original proposal. The originally proposed attached floating kayak launch has been eliminated and a new 8' x 14' elevated (min. 18" off the substrate) fixed "stepdown" platform will be installed between the covered platform and floating dock and will be access via steps from the northwestern side of the covered platform. This platform will be used to launch and retrieve kayaks and standup paddle boards. The new docking facility will be located approx. 6'/2' waterward of the existing docking facility on the eastern side and 6' waterward on the western side and will extend up to the existing pier -head line and will not encroach into the adjacent 15' riparian corridor setbacks. This will provide for a little more water depth than the existing and originally proposed dock. If required by commenting agencies, then stops will be installed to keep the floating dock 18" off the bottom at all times and limit switches and stops will also be installed on both boatlifts. As proposed, this docking facility will accommodate up to 4 small vessels and the floating dock and boatlifts will be in water depths ranging from approx. -11" to -2' at NLW. Please note that if required by commenting agencies all shellfish located within the footprint of the proposed structures will be carefully relocated as needed. A new 104' long vinyl bulkhead with 10' wingwalls will also be installed along the waterward toe of the high bank and a 20' wide tie -back area will extend landward from the top of the new bulkhead towards the dwelling. • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. Please feel free to contact me if you have any questions or concerns. Form DCM MP-2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or Breakwater shoreline NWL) stabilization) Length Width Avg. Existing NA NA Depth Final Project NA NA Depth 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. C. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the excavation in these areas: 2. DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of disposal in these areas: f. (i) Does the disposal include any area in the water? ❑Yes ❑No ❑NA (ii) If yes, how much water area is affected? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/26/06 Form DCM MP-2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ❑This section not applicable (If development is a wood groin, use MP-4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ❑Breakwater/Sill [-]Other: c. Average distance waterward of NHW or NWL: 0' waterward of NHW e. Type of stabilization material: Vinvl Sheathing g. Number of square feet of fill to be placed below water level Bulkhead backfill 0 Riprap Breakwater/Sill Other - i. Source of fill material. b. Length: 104' plus two 10' wing wails Width: 1' d. Maximum distance waterward of NHW or NWL: 0' f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ®No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. Clean sand from upland source. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill (i) Will fill material be placed in coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Silt fence C. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. Backhoe and skid steer d. (i) Will wetlands be crossed in transporting equipment to project site? ®Yes ❑No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. Most will be by foot, matts will be used as needed. 8/14/21 Revised 7/1/22 Chris & Michelle Myers Date Applicant Name Chris & Michelle Myers 8733 Bald Eagle Lane ��}/9� ����, Agent for Project Name Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 99, (iv) Width 6' (v) Floating [-]Yes ®No e. (i) Are Platforms included? ®Yes ❑No If yes: (ii) Number 1 Floating, 1 Fixed, 1 Covered Fixed (iii) Length 28', 12', 20' (iv) Width 6'• 8, 20' (v) Floating ®Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 3 (ii) Number of slips existing 2 i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k• Typical boat length: 16' - 22' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? El This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ❑Yes ❑No f. (i) Are Boatlifts included? ®Yes ❑No If yes: (ii) Number 2 (iii) Length 14' 12' (iv) Width 14' 12' h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open Runabout, jet ski and kayaks I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. C. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 29' to the west and 20' to the east 36' to the west-84' to th-e_east-- - - _:- . - -- Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 561' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. Water depth at waterward end of structure at NLW or NWL :L@ N LW 8. OTHER El This section not applicable a. Give complete description: Remove the existing docking facility and install a new 6' x 99' pier, 20' x 20' covered platform, a new 6' x 28' foating dock with a 2' x 6' landing platform, a 8' x 12' fixed kayak launching platform, a 14' x 14' boatlift and a 12' x 12' "sling type" boatlift. Stops and limit switches will be installed if required. 8/14/21 Revised 7/1/22 Date 8733 Bald Eagle Lane Project Name Chris & Michelle Myers Applicant Name Agent for Applicant Signature 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27/06 0 c N O N U CD "o N a� O > U W CZ j L) 0Ea�o �m�c6mr—M C C`7 E n�`` dx u m Z Li COO C (0 U 0 '� U I 7D U) cL5 w J a� c 0 E cn � 070 00 X r M Q W tZl m L > M 2 I� Cl) Y co L � � a_ O — u, W I, �opuJO a- ueue i� w @ r� a m 0 a� fi U) f Z o l r — o `r--- cn f�0 " O a a� X I Bald .66 x ,9 0) -=-C cal dwe�j X p U r i �' n W 06 ff Fixed 1' (( o (8' I O L(L 00 1 2 -A N / N - —0 x a� a� a� 00 N o O U - u. n ti Y N Ca CU Y J moo clm lo T U O(�CDN (D N o N - M t IZ � JopuJOO m E ueuy e i_ � oc � co m �, 0 co o (a)U)c x o -� 4— w m { LL) O J Q 6uijsix�] U w Q cn (u u) (� wu= w0- �m W cc) U) �Z D o C (D z i� z El c c10 E c� 0 o� o0 0 U N � a� m U� n om ^L LL = L Z 0 O E 0 c 0U o }, �m X W oF- N L X 0 O � N n U L ON Q % 00 n I uF a� s � O N N L c O � � J +, c :3 W W U ^— W L1 U J L A ) U �(/ LL > O O �CO d' O 06Ln c co �� (Y) Uo~oZO00 N U)