Loading...
HomeMy WebLinkAbout20141091 Ver 1_Shoreline Stabilization_201410152 0 1 4 1 0 9 1 State of North Carolina Department of Environment and Natural Resources DWR - Division of Water Resources i 15A NCAC 02H .0500 _ ateW r Quality Certification, Shoreline Stabilization Division of Witter Resources FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Four copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information OCT 1 5 2014 DENR - WATER RESOURCES 401 & BUFFER PERMITTING Name: D Mailing Address: 1 l c A v AJ (f a� I Telephone Number: 5/6 -SS 1) Fax Number: 334 - 3 E -mail Address: 1)0.v 1, 0 2) e ieay-t-V<� clr 2. Agent/ Contact Person Information T A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www.saw.usace. army.mil/ Portals /59 /docs /regulatory /regdocs /Permits /SAMPLE_ AGENT_AUTH ORIZATION_FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E -mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10 -2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: f�'P6�U� Nearest Town: SPjuoye, Subdivision name or site address (include phase /lot number): Directions to site - please include r ad names and numbers, landmarks, etc.. Describe the existing land use or condition oflthe site at the time of this application (residential, undeveloped, etc.): 6. Property size (acres): CU.. / e v c r--f 7. Lake/ river/ ocean adjacent to property: 9 CU Ike 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): ow �.,1 ��) cu C,k( A0,; V (,�� � 5 0�►�� P}wov[�� AIUV? oVS�A S, 9. Will work be conducted from land? From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 360 X ] 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 1® t F' S � l Owner /Agent's Signature} [15A NCAC 02H .0502(f)] Date -Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10 -2013 Page 2 of 3 Full Pond/ 3 60 Norma I Shoreline r W .Avtl La ke (At Full Pond /Normal Water Level) i E►, pvt'JeV4 l Ao, REP $ Z'-7 �6vve �� II P"01PK Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 3 of 3 �r �TL1�� s f ~� �� � •� ''�� . y � �� :� i, L f. �� {� • -+r /�- , . u � .tee N ►�S 1 4 s 0 I 1010, N � U rn m N !r v� f s j I�f 1 Po LoWr3 1Qo� �U �1 u0wr�ry pw .a a IF ,�° VW �d I � 5 1*44 Ne %.27 �, lLf �.- AC_ *.3 J�IY..` -. s (�. L � -e '`r,.• '{�4 Jig r, 1 i 1°� 1-4 W. r_ e. kik