HomeMy WebLinkAbout20071222 Ver 2_More Info Letter_200709200~ W ATFR Michael F. Easley, Governor
`O~ QG William G. Ross Jr., Secretary
(q ~. North Carolina Department of Environment and Natural Resources
~ =.1
O ~ Coleen H. Sullins, Director
Division of Water Quality
September 20, 2007
DWQ Project # 07-1222, Ver 2
Johnston County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Taylor Blakely
Blakely Design Group
700 Exposition Drive
Raleigh, NC 27615
Subject Property: Smithfield Heart and Vascular Associates
Ut to Buffalo Creek [030402, 27-42, C, NSW]
REQUEST FOR MORE INFORMATION
Dear Mr. Blakely:
On September 14, 2007, the Division of Water Quality (DWQ) received your application dated
September 5, 2007, to fill or otherwise impact 25 linear feet of perennial stream, and 1,200 square feet of
Zone 1 Neuse River basin protected riparian buffers and 0.00 square feet of Zone 2 Neuse River basin
protected riparian buffers to develop a commercial property. The DWQ has determined that your
application was incomplete and/or provided inaccurate information as discussed below. The DWQ will
require additional information in order to process your application to impact protected wetlands and/or
streams on the subject property. Therefore, unless we receive five copies of the additional information
requested below, we will have to move toward denial of your application as required by 15A NCAC 2H
.0506 and will place this project on hold as incomplete until we receive this additional information.
Please provide the following information so that we may continue to review your project.
Additional Information Requested:
1. Please re-submit your site plans on full plan sheets at a scale of no smaller than 1"=50'.
2. Please be aware that the final, written stormwater management plan approval on letterhead from
the reviewing local government (Town of Smithfield) and one copy of the approved stormwater
management plan, including plan details, calculations and other supporting information, must be
received by this Office before the impacts specified in this Certification occur per Condition No.
4 in GC No. 3631. Also, before any permanent building is occupied at the subject site, the
facilities (as approved by this Office) shall be constructed and operational, and the stormwater
management plan (as approved by this Office) shall be implemented. The approved structural
stormwater practices as well as drainage patterns must be maintained in perpetuity. No changes to
the structural stormwater practices shall be made without written authorization from the Division
of Water Quality.
3. Please indicate all stream impacts including all fill slopes, dissipaters, and bank stabilization on
the site plan.
N~o°e~Carolina
401 Oversight/Express Review Permitting Unit ~ -'K~uCa~~r'/
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: http•//h2o enr state.nc us/ncwetfands
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/]0% Post Consumer Paper
Blake Design Group
Page 2 of 2
September 20, 2007
4. Please indicate all riparian buffer impacts on the site plan and clearly label impacts (Buffer
Impact 1, etc.).
Please locate all of the protected riparian buffers as overlays on the site plan, clearly showing
Zone 1 and Zone 2.
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting to d cuss this matter.
Singly. . wh
Cyndi Karoly, Supervisor
~O1 Oversight/Express Review Permitting Unit
CBKlijm
cc: Lauren Cobb, DWQ Raleigh Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Jamie Guerrero, PNT Environmental Consultants, 34 Castlewood Drive, Clayton, NC 27520
Filename: 071222Ver2SmithfieldHeartAud VascularAssociates(Johnstoo)Ou_Hold