Loading...
HomeMy WebLinkAbout20220982 Ver 1_More Info Received_20220926Strickland, Bev From: Scarbraugh, Anthony D CIV USARMY CESAW (USA) <Anthony.D.Scarbraugh@usace.army.mil> Sent: Monday, September 26, 2022 8:58 AM To: Tankard, Robert Subject: [External] Chambers Attachments: SAW-2022-01565 More Information 08_16_22.pdf; Chambers Rip Rap Bank / 114 Emperors Isle / Coinjock NC / Currituck County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Anthony Scarbraugh Regulatory Specialist US Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 Phone: (910) 251-4619 Email: anthony.d.scarbraugh@usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. i Project Submittal Interim Form NORTH CAROLINA Envlronm¢ntcl avofiry Updated September 4, 2020 * Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: Project Contact Information Name: Daniel R Meads Who is submitting the information? Email Address: * meadslawnscapes@gmail.com Project Information Existing ID #: * Existing Version: * 202201565 1 20170001 (no dashes) 1 Project Name: * Chambers Rip Rap Bank Is this a public transportation project?* Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? * Yes No Unknown County (ies) * Currituck Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Rip Rap Permit Agent Authorization.pdf Scan Aug 15, 2022 (1).pdf chambers plan pdf.pdf Only pdf or kmz files are accepted. Describe the attachments or add comments: Attached are the following: Permit Agent Authorization Corrected Open Water disturbances (pages 4 and 5) Additional site plan and cross section. 390.06KB 900.09KB 143.34KB By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: * Submittal Date: Is filled in automatically once submitted. SAMPLE AGENT AUTHORIZATION FORM PROPERTY LECAL DESCRIPTION: LOT NO. )CC//4V2PLAN NO. PARCEL ID: � 6 ) STREET ADDRESS: �/ / C"2y°�✓0/ k� -_ s I�- / a ` J' U c,4- i "VC — Please print: Property Owner: (` ( c Property Owner: bv: The undersigned, registered property owners of the above noted property, do hereby authorize ( -es (Contractor / Agent) of �e�F/`s �Otwl1C l S (Name of consulting firm) LLc to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 2 U - $ Z ^ (& , We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. fij Authorized Sign ture Authorized Sig ature Date: %lam /ZL'Z-2- Date: C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): [*open Waters ■ Wetlands ■ Streams — tributaries • Buffers ■ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - - S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 -7 - CWefykic 504.6a k, h ^`4.4 T"g Gyrstfi(o.0IsAcre/ 02 - Choose one / Choose 03 - Choose one Choose O4 - Choose one Choose 4f. Total open water impacts 4g. Comments: coy 5- S , /` . 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? • Yes ■ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually below. If any impacts require mitigation, then you MUST fill out Section D of this form. list all buffer impacts 6a. Project is in which protected basin? • Neuse • Tar -Pamlico • Catawba • Randleman • Other: 6b. Buffer Impact number - Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) _ B1 - Yes/No B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 174 Linear feet of shoreline Roughly 700 Squarefeet of Riprap coverage 0 Crow d ma Gray) �.ww.r�wdrF Ito l[ f 41.4 Mean High Water (3') Mean Low weer (0') Haltom Aertmlnikmani 11' below mein kw warn Strickland, Bev From: Scarbraugh, Anthony D CIV USARMY CESAW (USA) <Anthony.D.Scarbraugh@usace.army.mil> Sent: Thursday, September 1, 2022 10:06 AM To: meadslawnscapes@gmail.com Cc: Montalvo, Sheri A; Tankard, Robert; Snider, Holley Subject: Chambers Rip Rap Bank / 114 Emperors Isle / Coinjock NC / Currituck County Daniel, As discussed, you may need to request a Pre -Filing Meeting with the NC Division of Water Resources (NC DWR) to comply with Federal Rule requirements for 401 Certifications. Information on requesting a Pre -Filing Meeting can be found at: https://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer- permitting/application-forms-help-documents. Since you submitted the Pre -Construction Notification (PCN) application through the electronic PCN process and have a DWR number: 2022-0982, you may want to contact Robert Tankard or Holley Snider with NC DWR concerning the Pre -Filing requirements associated with the project. I have also copied Ms. Sheri Montalvo with NC DWR concerning any fees that maybe associated with the processing of the PCN application. If you have any further questions, please feel free to contact me. V/r Anthony Scarbraugh Anthony Scarbraugh Regulatory Specialist US Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 Phone: (910) 251-4619 Email: anthony.d.scarbraugh@usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. i