HomeMy WebLinkAboutNCC203843_NOT Closeout Documents_20220920North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Wayne Project: 2019 Water System Improvements CN River basin: Neuse
Person financially responsible: Fork Township Sanitary District - Henry Braswell, Project #: WAYNE-2020-004
Chairman
Address: PO Box 1515, Goldsboro, NC 27533
1. Project Location: NCSR 1009 & 1226, Goldsboro
Pictures: No
2. Weather and soil conditions: Cloudy, warm, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
Title:
Date given/sent: September 9, 2022
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the
10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice
of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that
this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: September 8, 2022 Time arriving on site: 11:50 AM Time leaving site: 12:20 PM
cc: