HomeMy WebLinkAboutNCC205219_NOT Closeout Documents_20220920North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Lenoir Project: PNG Line 466 Pipeline River basin: Neuse
Person financially responsible: PIEDMONT NATURAL GAS COMPANY Project #: LENOI-2021-012
INC - Dave Vena, Project Manager
Address: PO Box 33068, Charlotte, NC 28233
1. Project Location: Grainger Station Rd, Kinston
Pictures: No
2. Weather and soil conditions: sunny, warm, wet Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: September 16, 2022
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -
inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the
10. Comments: NPDFS General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice
of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-Termination. Please note that
this correspondence must be uploaded as part of completing the NOT process
Reported by: Bradley West Others present:
Date of inspection: September 15, 2022 Time arriving on site: 10:45 AM Time leaving site: 11:30 AM
cc: