HomeMy WebLinkAboutNCC203889_NOT Closeout Documents_20220919North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Alamance Project: Sandvik Application Center River basin: Cape Fear
Person financially responsible: Samet Corporation Project #: ALANIA-2021-014
Address: 309 Gallimore Dairy Rd, Suite 102, Greensboro, NC
1. Project Location: 1483 Dogwood Ct, Mebane
Pictures: No
2. Weather and soil conditions: 80's, Clear, Workable
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: September 19, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Turney Others present:
Date of inspection: September 13, 2022 Time arriving on site: 9:15 AM Time leaving site: 9:30 AM
Yes