Loading...
HomeMy WebLinkAboutNCC214895_NOT Closeout Documents_20220919North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wilson Project: 2018 Water System Improvements L River basin: Neuse Person financially responsible: Town of Lucama - Teresa Whitehead, Town Project #: WILSO-2021-004 Administrator Address: PO Box 127, Lucama, NC 27851 1. Project Location: Various, Town of Lucama Pictures: No 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: September 16, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Others present: Date of inspection: September 16, 2022 Time arriving on site: 10:30 AM Time leaving site: 11:00 AM cc: