Loading...
HomeMy WebLinkAbout20190230_CP4B hydro plans_20141015 0] See Sheet I-A For Index of Sheets' STATE STATE PROJECT REFERENCE NO. NO. SHEETS \ q STATE Old NORTH CAROLINA SHBBT TOTAL P :�• J MN. N.�. R-25826 DIVISION OF HIGHWAYS _ Ema PROD`cr STATE FRO.NO. F.A.FROJ.NO. BS RJFTION cw PROJECT R-25828 R-25828 34472.1.5 NHF-158 7 PE anon 5 o E�SOO' NORTHAMPTON COUNTY 00 y y, �� �n n x .� 1 ren o oea o Sr,o SR 2q LOCATION: US 158 FROM SR 1312 (ST.JOHN CHURCH ROAD) EXTEND/REPLACE 3054'CMP OR CULVERT oo '� TO SR 1333 (MT. CARMEL ROAD) EAST OF JACKSON -`- " +90 +/- o �o Ed ds Pocos,in -Y23- STA23+50.00 � �+ Mr' TYPE OF WORK: GRADING,DRAINAGE,PAVING,RESURFACING, END CONSTRUCTION Q�F� �1 AND STRUCTURES UY24- () VICINITY MAP GUARDRAIL, SIGNALS, us ,ss Merger 4B Meeting Plan Set 1MM4 M W BEGIN TIP PROJECT R-2582B -sR2- O —L— POT STA 450+51.83 s� -Y23- STA16+75.00 BEGIN CONSTRUCTION BEGIN BRIDGE RAMSEY CREEK -L- STA7W+9553 END TIP PROJECT R-2582B -ORI- BEGIN CONSTRUCTION —L— POT STA 902+00.00 ` US /58 BEGIN DETOUR END BRIDGE EXTEND/REPLACE CULVERT -Y22- STA/0+00 -L- STA8 12+0230 -L- STA457+82 +/- BEGIN BRIDGE A � � -Y22- STA28+9/J2 � SWAMP N G END BRIDGE SWAMP w -Y22- STA.30+8857 Q END DETOUR V e LIMITS -Y22DET- A30+4950 i -Y22- T 42+50 0 END CONSTRUCTION 0 z �s�y Jackson -SRI- -Y19- SR 1136 BOONES MILL RD. GUMBERRY SWAMP -Y21- US 158 BOONE'S G� MILL Q POND q� c INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION PORTIONS OF THIS PROJECT HAVE CONTROL OF ACCESS. BEGIN BRIDGE PRELIMINARY ]PLANS ff A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF JACKSON. -L- STA 641+2556 -Y20- SR 1126 DO NOT USE FOR CONSTRUCTION '• • CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD END BRIDGE BARROWS MILL RD. SEE SHEETS 2-G& 2-H FOR -Y22DET- PLANS A + V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared In the Office of; HYDRAULICS ENGINEER � ADT 2017 = 6018 DIVISION OF HIGHWAYS 50 25 0 50 100 1000 Birch Ridge Dr.,Raleigh NC,27610 moon, ADT 2035 = 7900 LENGTH ROADWAY T.I.P.PROJECT R-25828 z K = 11 % 2012 STANDARD SPECIFICATIONS � PLANS _ % P.E. 50 25 0 50 100 D = 16 % * LENGTH STRUCTURE T.I.P.PROJECT R-25828 = slGxaruRE: q RIGHT OF WAY DATE. JASON MOORS PE PROJECT ENGINEER ROADWAY DESIGN V = 70 MPH MARCH 13,2015 ENGINEER ��Q PROFILE (HORIZONTAL) * TTST =9 DUAL 7 un*z O TOTAL LENGTH OF T.I.P.PROJECT R-25826 = 8.50 MILES �� �Q w 10 5 0 10 20 FUNC CLASS = LETTING DATE. BRYAN C. KEY, PE pip°° EXPRESSWAY/FREEWAY MARCH 21,2017 PROJECT DESIGN ENGINEER v PROFILE (VERTICAL) Ak REGIONAL TIER RE. SIGNATURE: ffr H}Off PROJECT REFERENCE NO. SHEET NO. R-25828 2 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER P A V E M E N T S C H E D U L E IFE—ommE 'E PLANS DO NOT USE FOR /W ACpU15IT10N (PRELIMINARY PAVEMENT DESIGN) PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION PROP. APPROX. 1%2" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, E3 APPROX. 3" ASPHALT CONCRETE BASE COURSE, TYPE B25.00, C1 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. E 3 AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.58, PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.00, C2 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO E 4 AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. LAYERS. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.513, AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PROP. APPROX. 51/2" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, C'3 PLACED IN LAYERS NOT LESS THAN 1%2" IN DEPTH OR GREATER E 5 AT AN AVERAGE RATE OF 627 LBS. PER SQ. YD. THAN 2" IN DEPTH. PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.00, (,'4 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO E 6 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO LAYERS. BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 51/2" IN DEPTH. PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH, TO BE C5 PLACED IN LAYERS NOT LESS THAN 11/ PROP. 8" AGGREGATE BASE COURSE.2" IN DEPTH OR GREATER J 1 THAN 2" IN DEPTH. D1 PROP. APPROX. 2%2" ASPHALT CONCRETE INTERMEDIATE COURSE, R1 8 x 12 CURB AND GUTTER TYPE I19.013, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, 9 x 12 CURB AND GUTTER D 2 TYPE 119.013, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. R Z PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.OB, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" 2'-6" CONC. CURB AND GUTTER D 3 DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 21/2" IN DEPTH OR R 3 GREATER THAN 4" IN DEPTH. D4 PROP. APPROX. 21,12" ASPHALT CONCRETE INTERMEDIATE COURSE, R4 8" CONCRETE TRUCK APRON TYPE I19.00, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD. D5 PROP. APPROX. 3" ASPHALT CONCRETE INTERMEDIATE COURSE, T EARTH MATERIAL. TYPE I19.00, AT AN AVERAGE RATE OF 342 LBS. PER SQ. YD. PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE, EXISTING PAVEMENT. D 6 TYPE I19.00, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. u PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE I19.00, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" MILLING D 7 DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 21/2" IN DEPTH OR U GREATER THAN 4" IN DEPTH. E1 PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, W SEE WEDGING DETAIL AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.OB, E 2 AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO NOTE: PAVEMENT EDGE SLOPES ARE 1 :1 UNLESS SHOWN OTHERWISE. BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 51/2" IN DEPTH. CL SURVEY ft EXISTING SURVEY VARIABLE C a DE POINT -a N _ Tj MIN. _ _ _ _ _ _ MIN_ J MIN. U MIN. — _ - MIN. o" MIN. MIN. MIN. MIN. mo Wedging Detail For Resurfacing Detail Showing Method of Wedging Detail Showing Method Of Wedging N. w� o�' � PROJECT REFERENCE NO. SHEET NO. R-25828 2-A ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLE 'E PLANS -L- (US 158) DO NOT USE FOR /W ACpU15IT10N PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 6' 18' 10' 24' 46' 24' 10' 13'w/GR z 6' 6' C4 3" S9.5C VARIABLE o v 4' GRADE 2, GRADE 4' SLOPE z FDP POINT FDPS FDPS POINT FDP 37 2 2 C4 C4 V) D5 D4 C4 D4 2%2" 119.0C 025 0.04 0.04 .025 _ 0.08 6.1 6:1 0.08 - -T - -6:1 6:1 11Yz° r T bl. br Tp D5 3" I 1 9.OC ES 16Y2°E3 A 6:) GRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE VARIABLE E3 3" B25.00 ORIGINAL GROUND TYPICAL SECTION NO. 1 USE TYPICAL SECTION NO.1 -L- STA. 451+00.00 TO STA.457+00.00 E5 51/2" B25.00 -L- STA. 469+50.00 TO STA. 478+00.00 -L- STA.498+50.00 TO STA. 515+00.00 -L- STA. 553+50.00 TO STA. 559+50.00 11 8" ABC -L- STA. 609+00.00 TO STA. 641+00.00 -L- STA. 669+00.00 TO STA. 683+50.00 T EARTH MATERIAL -L- (US 158) U EXIST. PAVEMENT 6' 18' 10' 24' 46' 24' 10' z I 13'w/GR W WEDGING b 6 OVARIABLE V 4 2' I 2' 4 SLOPE O FDP GRADE GRADE FDP z O POINT F FDPS POINT C4 I C4 025 0.04 0.04 .025 6:1 4: 6:1 0.08 6:1 6:1 0.08 V T 6 16Yz" T I T b 16 6" r AR'3:7 TO 7 D J1 I J1 D 6.-7 VARIABLE GRADE TO THIS LINE GRADE TO THIS LINE SLOPE TYPICAL SECTION NO. 2 ORIGINAL GROUND USE TYPICAL SECTION NO.2 -L- STA.457+00.00 TO STA.469+50.00 -L- STA.478+00.00 TO STA.498+50.00 -L- STA. 515+00.00 TO STA. 553+00.00 -L- STA. 559+50.00 TO STA. 593+50.00 -L- STA. 599+00.00 TO STA. 609+00.00 -L- STA. 641+00.00 TO STA. 641+85.56 (BEGIN BRIDGE) -L- STA. 643+07.16 (END BRIDGE)TO STA. 669+00.00 -L- STA. 683+50.00 TO STA. 794+95.53 (BEGIN BRIDGE) -L- STA. 812+02.30 (END BRIDGE)TO STA. 902+00.00 -L- (US 158) I _ 6' 18' 10' 24' 46' 24' 10' 13'w/GR z b' I 6' VARIABLE V FDP GRADE 2, GRADE 4' KO O POINT FDPS I FDPS POINT FDP a 3 7 2 u_ D4 C4 D5 yy C4 C4 0.08 .025 0.04 I 0.04 .025 0.08 6:1 b,. 6:1 bd 4R. V 3: N T bn E3 16Y2" Jt T ' r ES 11Y2'�- - - 11Y2,. D E5 T 7 TO 6:7 m N VARIABLE GRADE TO THIS LINE GRADE TO THIS LINE GRADE TO THIS LINE ORIGINAL GROUND o SLOPE TYPICAL SECTION NO. 3 USE TYPICAL SECTION NO.3 o -L- STA 593+50.00 TO STA. 599+00.00 N� m� w� b� PROJECT REFERENCE NO. SHEET NO. R-25828 2-8 ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLE 'E PLANS DO NOT USE FOR /W ACpU15IT10N PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION —L— (US 158) I 10'MIN 24' 46' 24' 10' MIN 4' C4 3" S9.5C GRADE GRADE D4 21/2" I19.00 POINT �� POINT 0.060 — — — — — _ —� I D5 3" I19.00 - - - - - - - - -EXISTING - - - - - TYPICAL SECTION ON STRUCTURE USE TYPICAL SECTION ON STRUCTURE E3 3" B25.00 —L— STA. 641+85.56 TO STA. 643+07.16 E5 51/2" B25.00 11 8" ABC T EARTH MATERIAL —L— (US 158) U EXIST. PAVEMENT 10' 24' 46' 24' 10' 4, 4 W WEDGING GRADE GRADE POINT POINT 2.025 0.025 TYPICAL SECTION ON STRUCTURE USE TYPICAL SECTION ON STRUCTURE —L— STA. 794+95.53 TO STA. 812+02.30 —L— (US 158) 10' 24' 46' 24' 10' SHOULDER 6, SHOULDER 1'6"3' 3'1'6' 4' 2' I 2' '6"3' 3'1'6" FDPS FDPS GRADE STD.865.01 GRADE STD.610.03 POINT I POINT 6'vC 02 .04 .04 I VAR •02 .04 04 STD.610.03 L� m 9" 22„ 6" � 6" 6'VC a T T $$" 9' GRADE TO THIS LINE GRADE TO THIS LINE N TYPICAL SECTION UNDER —Y22— STRUCTURE USE TYPICAL SECTION UNDER —Y22— STRUCTURE N (16'-6" VERTICAL CLEARANCE + 6'-2" SUPERSTRUCTURE DEPTH) —L— STA. 765+96.77 TO STA. 766+97.49 (SEE ALSO STD 610.03 & STD 865.01) N� o� N-� Qo C5 PROJECT REFERENCE NO. SHEET NO. R-25828 2-C ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER -RPA- -RPB- (MIRROR) INCOMPLE 'E PLANS ( -RPC- pp NOT USE FOR /W ACpU15IT10N `�-RPD- (MIRROR) PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 6'. 18' 10' 2'. 12' 12' o� I VARIABLE w V SLOPE z 4' GRADE 4' C4 3" S9.5C O �F.D PS I POINT FDPS 04 02 22 6n 6:1 6„ I o6" oa VAR 3.7 TO 6a D4 2%2" I19.00 T 15„ T ORIGINAL GROUND D5 3" I19.00 VARIABLE I GRADE TO THIS LINE SLOPE TYPICAL SECTION NO. 4 USE TYPICAL SECTION NO.4 -RPA- STA.10+00 TO STA. 30+19.61 E3 3" B25.00 -RPB- STA 10+00 TO STA. 26+05.68 -RPC- STA 10+00 TO STA. 24+41.94 -RPD- STA 10+00 TO STA. 24+82.63 E5 51/2" B25.00 -Y20- (SR 1126) -Y21- (US 158) SR1- 11 8" ABC -SR2- -DRI- 8' 6' 10' I 10' 6' T EARTH MATERIAL *12' *12' GRADE I U EXIST. PAVEMENT POINT I 3•T .OS 2 •0 .08 V :jT0 a.1 WEDGING ORIGI N A L GROU 4 I GRADE TO THIS LINE ORIGINAL GROUND TYPICAL SECTION NO. 5 USE TYPICAL SECTION NO.5 -Y20- STA. 18+50.00 TO STA. 21+46.47 -SRI- STA.10+48.69 TO STA. 30+53.04 -SR2- STA. 10+26.08 TO STA. 54+19.74 *-DRI- STA. 10+47.09 TO STA.11+27.90 •-Y21- STA.10+4 7.00 TO STA.15+00.00 -Y19- (SR 1137) USE CUL-DE-SAC INSET -Y23- (SR 1333) -SRI- STA.29+41.33 TO STA. 30+53.04 -DRI- -SR2- STA.10+26.08 TO STA. 11+38.54 I 8' 6' 12' 12' 6' *10' I *10' GRADE POINT C2 W I Cl C 3 oB .02 .02 .08 vqR a:�T ORIGINAL GROUND - } T - O 4-1 T 7" UL Et 7" T u I El ORIGINAL GROUND GRADE TO THIS LINE ExlsT.vAR.18'TO 20 GRADE TO THIS LINE TYPICAL SECTION NO. 6 USE TYPICAL SECTION NO.6 •-Y19- STA.10+4 7.00 TO STA.12+00.00 -Y23- STA. 16+75.00 TO STA. 19+85.77 -Y23- STA. 20+87.69 TO STA.23+50.00 -DRI- STA. 10+47.09 TO STA.11+27.90 a CUL-DE-SAC INSET N SRI- -SR2- 8' 6' VAR 10'TO 60' GRADE POINT .08 .02 wo T 22„ I o� PROJECT REFERENCE NO. SHEET NO. R-25828 2—D ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER (j —Y22— (NC 305) INCOMPLE 'E PLANS NOT USE FOR /W ACpU15IT10N PRELIMIN RY PLANS i DO NOT USE FO CONSTRUCTION 8' b' 2' VAR 12'-18' VAR 12'-18' 2' FD FDPS PS GRADE ca POINT w ca ca C4 3" S9.5C 3 .08 .02 .0 2 .08 ORIGINAL GROUND 6.1 T — — — — r VAR 3:1 TO 4'1 D4 2%2" I19.00 E4 D6 ORIGINAL GROUND GRADE TO THIS LINE GRADE TO THIS LINE D5 3" I19.00 TYPICAL SECTION NO. 7 USE TYPICAL SECTION NO.7 —Y22— STA. 17+50.00 TO STA. 21+00.00 E3 3" B25.00 E5 51/2" B25.00 11 8" ABC —Y22— (NC 305) T EARTH MATERIAL 8' 10' VAR 12'-18' VAR 12'-18' 10' 6' *18' *18' U EXIST. PAVEMENT GRADE 3•� C4 POINT W ca ca W WEDGING A:1 .02 .02 .0_2� 02 .08 V ORIGINAL GROUND — — — — — AR 3:1 TO 4.1 D6 b r ORIGINAL GROUND E4 U GRADE TO THIS LINE GRADE TO THIS LINE TYPICAL SECTION NO. 8 USE TYPICAL SECTION NO.8 *—Y22— STA. 21+00.00 TO STA. 23+23.00 —Y22— STA. 37+50.00 TO STA.42+00.00 —Y22— (NC 305) 8' 10' 12' 12' 12' 10' 6' GRADE �j POINT �J 3 T 4:1 .02- .0_ 2- ��2 .08 V ORIGINAL GROUND AR 3r1 TO r b„ 6„ r 4.1 0 W I —' ORIGINAL GROUND GRADE TO THIS LINE a TYPICAL SECTION NO. 9 USE TYPICAL SECTION NO.9 —Y22— STA. 23+23.00 TO STA.28+91.12 (BEGIN BRIDGE) —Y22— STA. 30+88.57 (END BRIDGE)TO STA. 37+50.00 N N �o N� o� N� m� w� b� PROJECT REFERENCE NO. SHEET NO. R-25828 2-E ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLE 'E PLANS DO NOT USE FOR /W ACpU15IT10N PRELIMIN RY PLANS -Y22- (NC 305) DO NOT USE FO CONSTRUCTION 5/2' 2' 12' 12' 12' C4 3" S9.5C GRADE POINT D4 21/2" I19.00 0.02 0.02 SIDEWALK SIDEWALK D5 3" I19.00 TYPICAL SECTION ON STRUCTURE USE TYPICAL SECTION ON STRUCTURE -Y22- STA. 28+91.12 TO STA. 30+88.57 E3 3" B25.00 E5 51/2" B25.00 11 8" ABC �-Y22DET- T EARTH MATERIAL 3' 6' 10' 10' 6' U EXIST. PAVEMENT GRADE POINT W WEDGING � OS .02 I 02 OS ORIGINAL GROUND 3.� BAR 3:1 TO 4:1 T $$" T GRADE TO THIS LINE ORIGINAL GROUND TYPICAL SECTION NO. 10 USE TYPICAL SECTION NO.10 -Y22DET- STA. 12+32.22 TO STA. 28+50.68 -Y24- (US 158) 8' 6'3. VAR 14'TO 56' 14' 6' CROWN POINT 39 08 EXIST EXIST OS w r 4:1 VAR 3:7 T ORIGINAL GROUND — — — — 0 4:) T Z y,. U I ORIGINAL GROUND GRADE TO THIS LINE E EXIST.28' a TYPICAL SECTION NO. 11 USE TYPICAL SECTION NO.11 N (CUL-DE-SAC) -Y24- STA. 27+02.93 TO STA. 28+10.81 N �o N� o� N� m� w� b� PROJECT REFERENCE NO. SHEET NO. N R-25828 2—F MEDIAN GRADE POINT TRANSITION ROADWAY DESIGN PAVEMENT DESIGN ENGINEER ENGINEER INCOMPLE 'E PLANS DO NOT USE FOR /W ACpU15IT10N PRELIMIN RY PLANS DO NOT USE FO CONSTRVCTION —L— (US 158) 0.025 I 0.025 / \ GRADE - - - - - - - - - - - - - - - / \ POINT A B C C B A SE TION C—C A B C C B A —L— \(US 158) — — — — — — — — — — — — — — 23' 23' 150' 1115W / I \ I II II IV / \ 0.025 / I \ 0.025 GRADE/// \ GRADE POINT / \ POINT SECTION B—B \\ I II III IV / \ —L— STA 518+50.00 —L— STA 520+00.00 —L— STA 521+00.00 —L— STA 522+50.00 / \ —L— STA 537+00.00 —L— STA 538+50.00 —L— STA 539+50.00 —L— STA 541+00.00 / \ —L— STA 580+00.00 —L— STA 581+50.00 —L— STA 582+50.00 —L— STA 584+00.00 / \ —L— STA 602+00.0 —L— STA 603+50.00 —L— STA 604+50.00 —L— STA 606+00.00 / —L— (US 158) \ —L— STA 668+25.21 —L— STA 669+75.21 —L— STA 671+00.00 —L— STA 672+50.00 / 23' 23' \ —L— STA 689+28.81 —L— STA 690+78.81 —L— STA 700+02.54 —L— STA 701+52.54 —L— STA 854+46.29 —L— STA 855+96.29 —L— STA 872+96.29 —L— STA 874+46.29 / I \ a 0.025 0.025 E -a GRAD GRADE POINT POINT N SECTION A—A Nod s° m� w� b� PROJECT REFERENCE,yNO. SHEE t,NO. .. n R-25828 4 i RhV SHEET NO. \ `� '� ROADWAY DESIGN HYDRAULICS � � r ` � � / @, � \ � �. � ENGINEER s" /ENGINEER / I c® PL ,PL AN 1�0 NSA'USE FOR /W ACOUISITISSN / I$ 1LIMIN Nµp a pp tin � D�NOT'USE PIGS r III I is W O / N� I o Y ry � n n m ......: / POND t �5 WOODS AND SWA a I a � -- ,. ;CI.33 RIP R OE PROTECI'IOV) ,% 'Clang Rrftap e s ..-...,, _.___ ____�. �./; ....-m- �,_ a/w CL R RIP'RAP \ F .. _ m P N 70 GMSVB(/RG /.. US V58 26;4357 MTL ,...ci .,.,GRAU 350 TC Ste' - - � _i �—�-- •, ., —, .---"'-.--,� --------__ 5. � _ ..,,. *COI- e a- 0 r (BADE / 1 6 RIP RAP RA4,950 T L-3 TOE PROI . �� V. RAP N C � . m e� 0/11 C \ H RI RAP P (/�S Y F TOE PROTECTION iRA �RA� �' t-R r `" CL B RJR'RAP m� �, / � _ ri........ n� D — \ 8_,�/ 2442330 Fes. _ fi, C f'L x SWAMP /' -°P` 7KE I RIGHT 0 �W p �kD5 AND SWAMP c'L" "� C.Q RIP RAP i F JS _ _ I i t I FOR -L- PROFILE SEE SHEET,/39 SHEET NO. PROJECVREP�=.EIICE 711.= T Ur .. zz 562Y 1 1, 5 m T' RIW SHEET NO. ' I DESIGN HYDRAULICS T T ENGINEER ENGINEER T U, INCOMPLE rE Mtils,", NO NOT USE FOR k/W T/ T T, T PRELIMINA RY PLAN9 DO NOT USE FO CONSTRUCTION/ `7- T T T T/ T/ Ln/ WOODS GRASS AREA T/ CUT OVER C:) 41 4- 4/ 0 %o -,L-, tR 1-R Exis TING W T, 4s— —c— C z GONG RCP — — — — -..® — — F C ---- C —————————— F� —77-,� F E GRADE L us/58 7,,,— -7 —————— -3 off= --————————————-- -————————— %o EXIISTf R/W -\G\PJ DE —GRADE o GR;L RA CA-7-1 T' F c c L-7 7— 4- c c c c 4, LLI T c c N Lu IR —F Lu Mw 'T 4- 4- ­7 4 CUT OVER 1 4� ------------- T, TT 4- T /T T, T T T/T TT T TTT T/ 'T TTT T/ TTI T 110= 4 TI T T,e T IT T 'T/ T/ N T T A. TI TT T TTT T T/ Z- 17� fppp 411111 Rt A bs—Pe Rd 3:1 T, 'T T A, 0 T/ A, G IT �T FOR —L PROFILE SEE SH "T ET/39 PROJECT REFERENCE NO. SHEEfl,16. azz ded 1 ci RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE rE PLANS M NOT UgE FOR k/W ACPUISITION RY,/'PLANS 4„ 00�1OT USE PO CONSTRUCTION CUT OVER CUT OVER ci 0 4/ O o 0 41 41 41 77 -77 4- 7 F_ F_ -F_ F 15"CMP 1 26 BST us 58 GRADE ------- - ------------------------- ------qMMM2____ FE$ Lo Fs- RADE A, -7 ja Lu Om* GRADE G . 7 \ GRADE ILL 4m - - -- — — — -- — — — — — — — — — — — — — — — — "7- F F F F F F F F F F F F F F F F F F F 4/ ui /RN 's GRADE 4- u N CUT OVER CA OVER < I < F OR -L- PROFILE SEE SHEETS 39 & 40] PR REFERENCE- EET NO. 4/" 4- _ SHEET NO.. ROADWAY DESIGN 'P DRAULICS ENGINEER /ENGINEER r PLANS ACQUISITION 41 4- tl 4/ _41 .... .. .......... ........... ..... F Bmio FS17-7-14-60-100-1 : , ELEVR Tl '19,1,1 t.499,00 Lt. N 96 92 E 2445652 d5 TI v - B TION -47.00 177T dloo_ 'f` R/C K 1 20" PINE 714 O�045 0.040 �Ls CHAPEL lgvi' 01 CUT OVER CUT OVER C) PUMP'O'JsE V / % ',CEMETERY + + '�"., - I "t v IR 10R� v CL B RIP RAP F F F — ", — 11 — / S� Y F —k-- \�--f-- F- 2b — — — — — — — — — — — — — — -E- -15'RCP OR GRADE --———————————————— —————————— ———— us 158 26'3ST L US/58 26'BST -4- GRALI —GRADE 'g 1. ­ 0= ——————— ——— ——————— ————————— ——————————— JF4P 2 I_ n _77 777 7� cmmm� E_* I EX15TING R/W, 12 GRLUE —GRADE _G DE uj Lu Lu F F F F F F F F F F F F F F F F F F F F uj Lu IR F Flill F > W J 4✓ 4/ CUT OVER C T OVER A > z R, 4 PLANS NSTRUCTfON DE Lill! R, M --------------- ------ ------- --- PROFILE-SEE-SHEET--{0- PROJECT REFERENCE NO. SHEET NO. 4- -77 7 7 / -7 77 o ,?W SHEET 0, 4- —41 ROADWAY DESIGN HYDRAULICS < ENGINEER ENGINEER 4- 41, -41 -4� 4- 41 r S 41 4- 4- RY PLANS CONSTRUCTION 4- 41 41 41 N 41 4- ......... 1 ON 3 445652 .00 17 7�,�T PINE z ...................... WOODS WOODS CUT VEJ + + ARN AK Lo F F F F F F Cl B RIP RAP F F F F F E- ---t— - — — — — — - --a-- F f F F GRADE -R- - 0 FES "7 ADE ------------- ------------------------- US 158 26'BST is.RCP'' Z7—Z- ILI ---———————————— Fll -4� Lu 0 77 -77- E GRADE G CT 1 GRADE—�l LfIRADI V) F I F F F 1 0 F F F F F F F F I F F Es F F F F I'R tR F 41 P CUT OVER V 4/ CUT OVEI,-)�/ CUT OVER 4- R, N N R, FFOR PROFILE 5EE SHEETS 40 PROJECT REFERENCE NO. SHE RW SHEET NO. ROADWAY DESIGN ENGINEER ENGINEER WOODS ec 0 'WOODS WOODS o —— ——---———————-- C vq/FEs 7 US 158 26 BST 5.C�p W/FES Ln xi Es . rn COWS S C, 0 C,\ F Lf)F tie F, F F 7 F 00 F GI DE GRAEfE F CULT —GRADE C) GRADE— D p Z fj 0 36 o 4L� �'SPLIT RAIL \A DI X ISBKD A ok� E-1 I GRAD —GRADE Ld F CIL B RIP R F, -- — — — — — — — — — - - CC GRADE F F F F, A, L) DE F F F F F F F F \F F F F F P F F I F CL B RIP RA F IR lu F 41 41 CULT WOODS Lul i 00, _j ui R, Z E2M MONOLITHIC CONCRETE ISLAND F OR -L- PROFILE SEE SHEET 41 FOR -DRI- PROFILE SEE SHEET 56 •„ EFER NCE N 'PROJECT R E SHEET NO. J "' "6N gM ft`U 9�•R 6�S1P45 IK E E1`LN 7"E�E P a _ RS SHEET 110 48 zgl 04 F R OADWAY DESIGN HYDRA—UL- IC S 00 ENGINEER ENGINEER PT'1 ON 30 OA, . CULT � INC®NI1�1L1E � 1P1L.�NS � ( �� � � / � DO NOT UB6 FOR /W ACOU191TION - �� .,,, ,.... ...mow. ' , """"^ .., ": -'„,^---•� WV 94 5 u �v I—k-- w0005 __ °4�. ° A woo j ( P W r WOODS s w F .._.�...._.,_. —.^^ WOODS ....... �.,...� ....... �. ..w....._._ __L__.___._ \�\\ '`\ \ h v _7 WOODS � GLADE CULT g-- � LLJ o i W E \E p P�, --._ CL R RN RAP s ..._.._F 7GI 9d1 �[DE � E f \ o A \ G ( ( / RIP f P r A W m p. X0005 J WOODS WOODS C F � Wq r , �'" `�� •, `.. WOODS 0 I I / I ` v u , I i MONOLITHIC CONCRETE ISLAND - �� FOR -L- PROFILE SEE SHEETS 41& 42 PROJECTIREFE SHEET NO. atNCE NO, GIG SHEET NO' ROADWAY D SIGN HYDRAULICS SHEET NO 'ENGINEEV 'RA�LCS ENGINEER S INCOMPLF,rP,` PLANS 0' I Nl�P�E FOR k/W ACEIUISJ�70N P Oo pj��, , NS R#,'LIMINA RY PLANS' FO NSTRUCTION ......... r /> T/ L Ln -j z Lo L0 + Ln WOODS 0- IR IR — 7: - - - - - - - - - - - Ln - - - - - - - - - - - - - - - F F I I - - -F - - - - -F—F- - - - L- —J44w — — — — - - - -�7GRADE EXSTNG RW — F — � <_GLA LE �: - ii F x 7-/ DE GRADE o nil us 158 28'BST ———————————————————————————— —————-- L- o C EXISTING RW 2G I's to Lu i of 711 E3 61 j O - - - - - - - - - -- - -- - - - - - - - Lu F F F— — — — — - — —P —F F— — — — — - — — — — - --LLL- F F — — — — — — — - F— Xt- -III— F CRA GKFADE \,F c c F IF F F F CL 13 RIP RAP GRADE G DI Lu /—RN Lu IR WOODS v F- Y,.2 ]FOR -L 'PROFILE SEE 'SHEI& 4 2 CE NO. SHE � PROJECT REFERENCE ET NO. ROADWAY DESIGN HYDRAULICS ES SHEET NO. ENGINEER ENGINEER w w INC®NI1�1L1E � 1P1L.�NS i v �'` . I�,wyl �� a:° I � �'°'a.., � ,," � q, '� /� •� ,...., � .. � �` �,„,,,,.� � � I oo NoT oeR eo eoNeTeoeTwN . d 0 XX N°^ *w 4 `� WOODS ....,./ ,. I o ; v i G' s i A i I � w000s " d 6 ° y_ jWp S. CN RIP RAP ciK w000s V \ ` I I I , p C'7 IR tZin. F LO g d \\ P \ r \ 7G1 ._.�_ GRAD cn ... ... ... ... .::........ F 5. q I x BM11 ELEVATION 95.35 N""3921 E 2449855 ,✓ BL STATION 48 75 00 155 RIGHT { R/R SPIKE IN 15' PINE .... ......... ......... .a.,,.,.,,.,. \` -W B RIP A us isa — — — ^" "GRAD W CsP_ I 4 wo4oS i y' h ,, _ �,. FOR, —L— ,PROEIL ,�4 E MEETS 42 & 43 PROJECT REFERENCE NO. SHEET NO. L. T, RW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER T/ lr,� la;=s RY PLANS CONSTRUCTION ji T v T BM12 ELEVATION Lo N 506�897.01 Z 963142 E 24 + B�STATION 66 40.00 150 LEFT co L-• R/R.SPIKE.IN.13 OAK ..� \-wl-1 Lo G T/ P,4 z D . ...... GRADE > 2GI- + "A ———————————————--- U I GU& 158 BST bq US 158 2e AST Lul:: _M> q G -————————— — 4F— --—7- ES F CL lIP GRADE F F WOODS of\ L WOOD�,' T, T T\ "T (uj I H1 EEP, NOLIT C MO� 11 �H T T/ FOR -4- PROFILE "�E� E�liT 43 PROJECT REFERENCE NO. A RW SHEET 0. S ROADWAY ESIGN YDRAU'C GJ�4 D EN EER �E 4GINI'ER v RY my .°.. ............ th h ...... r Lo ARN AWN Ln kwi Zo WOODS- ax, ------ c c GP406 c F C F G, DE GRADY-r- 2GI A 15"RCP _FS us/58 28BST —tam — E=m T� CI.B Rif'RAP F F F F _T C, I, - 1, - % F/ - 7T c F GRAM— k L t—R N v oor -WOODS I ?j'\ 112�66D c c M WOODS �Gl C F�3 R 7 – El I GR 0 X PiL r StiRUCTION DE GRADE"".- V�� D r; 7� Lu 5* o \v FOR —L— PROFILE SEE ,�HEETS & 44 T \' \ 'I 1 1, 7 PROJECT REFERENCE=11. SHE NO. �Z 777 RW SHEET NO. ROADWAY DESIGN HYMMULItS ENGINEER ENGINEER', INCOI� 'fLE rE PLANS 'DO NOT U FOR k/7�ACQUISITION, PRELIMIN,4 1 1` 15LANS DO NOT USE FO:CONSTRUCTION AF J ............. /x + > > z &, 1 2 la , I �c; > > WOODS woo)as X WO + E— IR c c F F F c— cm T 30,cm --,T— .PAVED GUTTER z —————————— E_- GRADE _., US/58 28'BST < ——————————— �7 �TY'7 Pk e + CRAI E .......... BM ELEV RIP RAP ')T� -141 Lu- -Lu— c ADE GODE ;L B 9"1 1 R P N 96 ";2" GHT R-1 Lu F uj R/R S��6E IN 13 P:Lk.) c c V) ....... uj tn c TF c "T Lu 7 tR CI.I RIP Rp YOR c t! G� c 0 C 0 Et NO 'S > "- w-.-- -. V\ UON ITHIC CONCRETE ISLAND --��FOR \–L– PROFILE SEE SHEET 44, PROJECT REFERENCE NO. SHEET NO. 1 LE T. ,e RhV SHEET NO. `'• ^v'w \ ROADWAY S ENGINEER b0 NOT USE FOR /W,ACQUISITION i �,,, mw• y ,.. o o� PI$�ELI�IN E8Y LAMS / ar_ DO NOT USE PO CONSTRUCTION yy' J C i � � m / / / �v ✓ % // /� y. , z v� 1 �� O o u — v / _ \0 — - — va9, O b, + tl � , WbOOS y � '-cj c � � ._ �� i j. �a � _ n;:n;.n,.�k.r- � GLA ING RW _ -.,. EXISTING TRW .\ w s Q _ �, r »;" E r E —� '_°mss E-� -.w-.= .�`�� � — � �- „..... ........ ----u.. IS"GM W""iM ,� ....._ �� .�..—.,..�.-«....... �..._..�.., .... ., ..... 'W..�"`..,.--.....�' ,".^ • _ "'"" ---.. '.�-.^ _"'-.- -.a_' `w'-.."" NVE T_ RARE _. _... ,. .. ..., G ftCP 80.24 GRADE- JU—G 18'RCP . T � o 0 ,,, .. "_.. .. .. .. Exi rwG aw Lwa ..., o . ^a 4EC'G5. R[GHT �L1J � f6 IN Ia P /) (l� F GRADE E F — F \ �r / F F r� c F F F� IR .R P� / w � P' v • VI I F l SEE SHEETS 44 & 45 _ u / HYbY , A'n \ \ V RW SHEET NO. I � \ PROJECT REFERENCE NO. SHEET? O: '7 ROADWAY DESIGN HYDRAULICS/ ENGINEER ENGINEER, R E TAIN rXISTIN� RIDGE o INCOMPLE rE 1P1LAN9 ,4,"," "Po 0 N�USE F )UISITICR� PIPE /QR k/W AC TYPE-I : , I, I I :/ P 0 I'PRELIMINA Ry 77 DO NOT USE FO (,bNeTUC Po TYPE -77 TYPE B-77 SKETCH A TO SCALE) A, END CONSTRUCTION —719— POT S10.12700.00 pp -------------- 0 Pwmq "o TOWJACKSON T*SMP All, OCCONEECHEE NSHIP V z lk. 0 0 > >KKK," E23 GR+ X. ....... Z K < RAD GPADE 1131 C c -bi El 0"65 0,11 t Is-RAP mmm�. vn� *MM SojL a F FX -T--L --T ct CAI F Lu 50 1 'GPADt�� c P c c c 7/--7 c c c AN ........... R14 65,35,// y 6 ELEVATIQN 59t'j'3 N 9 E 2455452 / 'SH)R C. 117 R,f BL STI)TION 126 R/R SPIKE IN 12 PINE• .. ............ .. ........... J, + GRADE /Z IFOR PROFILE SEE SHEET\45 F -Yp- PROF ET �6 OR ILE SEE SHE PROJECT REFERENCE SHEET NO. a:2 I", id \7 RW SHEET NO. ROADWAY DESIGN /HYDRAULICS ENGINEER ENGINEER RETAIN �XISTNG,,BRIDGE r S RY PLANS MNSTRUCTION TYPE B-77 IT-y-PE, MM* TYPE B-77 1�7 Q( Z T/ BRIDGE SKETCH INOT TO SCALE) L—, V X CNN NN, No CIO A z > rpGUMBrRRY SWA P cy) 1.00 %0 GUVBERRY SWAM ,A 000, BET, ST EL vv STEEL -RIABLE E/W SEE 1­1 C c . ..... INV-60,,P Y -.vx C. LE'=6�.72 UD6— m -i- --1 *MM ;RADE 7 so URADE CL�it Rif,h qDT 4-4-44! 5 E T1 F, TOE PROTECTIO CL B RIP C RAP P F/ F N V", F F J, -7— zz� //,v V, Twy -111 TYPE -�I7 V\ Y, IS FOR -L- PROFILE SEE SHE L7�S 45 461 PROJECT REFERENCE NO.=SHEET NO. L2 SHEET 0. ES,7. ,, HYDRAULICS ENGINEER ENGINEER CULT 96 C) %0 ............. BM15 N 604 457 'T.72 P 9 79 'LEVATION /S c E 2 785 3L STATION 152-33.00 200 LVFT U/P SPIKE IN 24" OAK c '750,,- + r tR\ RN AR-\ c Cir, p GWE 7 ES 158 31 BST 15,cmp 31 o iBLR fie Rir-rokp­/ Lu y. I/-----------F— ------ ------------ ------f— F ----------r— LLj % F Lu 8 T� AR'\ F '100"n C f RUINS \RlINI L o O'D f ? BM N BL EM MONOLITHIC CONCRETE ISLAND FOR -L- PROFILE SEE SHEET 46 ,l FOR -Y20- PROFILE SEE SHEET 57 v PROJECT REFERENCE NO. SHEET NO.,, R✓ SHEEP�NO, ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER RY PLANS CONSTRUCT10N CULT SFr ln ++ FOUND II L + %0 C C" ZZ- GR c ADd + GP DE Ln -0 G1 GRADE C�l zz C C A. Z;R 2 z 15'CMI VVIFES ui US'58 28'BST a- CL B RIP RAP F ECM F F IIFD F GRADE ul F F F F F F U-1 R u CULT Z�l -RQ�ILE\,SEE SHEETS 46 &=47 / -�, ^"" - - PROJECT RE ERENCE NO. SHEET NO. � 7 SRN✓ SHEET NO. ,,,,rROADWAY DESIGN - HYDRAULICS ENGINEER ENGINEER r 7 yu q Wry r RY PLANS CONSTRUCTION r Al 4 CI - I � i 04_ WOODS / CULT W CL i c o "RIP RAP �« , gr N'. F H/ � �, �. � .L&RIP RAP � l F ` � �. t , o i e, \ I� W zGi l; io prop t existing d�h' ° ap G7 \ P w —p m i R r r \CULT CULT V, I r I C, i .w i w, � .... ...^' CULT ` `'� PAVEMENT REMOVAL he prop ditch to o existing ditch " v v C G�ONCRETE ISLAND ' rte. v v —L— ONOLITHI i=pr°9 d ditch to N \ \ �e \ / FOR —Y l iPPROFILE EE SHEET 47 i SEE SHEET 57 � sr m .- .,�„,.. ....., - - r,,• �O ROADWAY D SIGN" HYDRAULIC$ N ER / ENGINEER l � I �....._ �LE U9E POR ACQUISITION PlkELI E�� II�ll t�N9 USE FO ITA',�STRDCT[ON �a SAG ' i / o F h SRI 11+41.13 a Elev. 98.88 CULT _ .. ... , CREST CULT / o raw - — Elev. 103.42 f� F _ CULT ,\ o F --�. --.»._.__ ,_,w ---.� RIP " F f ..�. .._... '-------- —..� ._... ___. �..r. F --+- .�.--. F P F ...-� RAP 4,, r' P / / F ADE Zzz r I- w � F "`� � ll�((((Irlrrr�((lll(�C'la sGl r F e yp F / co 0 0 0 0 0 \ s a BADE M /� �AD � I ,. CULT 6 !: C .. `-......�.` V. RIP RAP LLJ..... CV.B RIP RAP F `"`.. -.»»..�.._..... C..1 ,/,_.,,„. ..._ �._ .,..._ .�....7 .__.. _,,,____ .,�.�,. ..� W -- ---- - _._.. ..�,,........ ._.... ,_--..�... F / E P' � P F F p�F F �CL ff kiF^ p Cd RIP CULT / //'� CULT i MONOLIT yle CONCRETE ISLAND<, L- PR FILE SEE SHEETS 47 & 48 FOR -SRI--1 PROFILE SEE SHEET ,58 .,xx PROJECT REPERENC�E I SHEET I Pd \ \ Ll L � �/ / \ I EET NO, ROADWAY GN HYDRAULICS• ENGINEER ENGINEER [NCOM LEr 0 k/� 'aj��IS 'OR M NOT USIFF / . """" V - F / PRELIMIN AY PLANS / / '""*w ,,E� � \ � � M NOT USE ED CONSTRUCTION fr V r f A „CULT CULT CL 13 RIP RAP- v v + ---------- WOODS IR \1 11 111'RAP + CL B RJR RAP T 110 CL 1 Kir cu F IF F v Jill Dt S GRADE �E CA S u u 201 311 RADE FS uj F ------------- F F F CULT G DE X K �7 \ CL B RIP RA CULT CUL� CULT CL RJR COL r CULT A, .� e f, 6 \ u. i ! ''oil ............ T� SHEET N"I -UCT ENGINEER 7T FOR -L- PROFILE SEE/SHEET 48 F OR -SRI- PROFILE SEE SHEET 58 PROJECT REFERENCE Q. SHEET NO. RW SHEET No. ROADWAY DESIGN HYDRAwqCS ENGINEER ENGINEER r S RY PLANS U� CONSTRUCTION U, Ul J 04 WOODS Iry CULT ,Ooc� XASSB,Rip Rcip OE P R 01EC110N -IV + Z! F c c c z c FI F— GpADE c ft.--GRADE a V- G ---------- N _7 GRADE /F CIL B RIP RA (�?\ c GRPDE c C Ljj R De c F ACRE F C c c c c C F c c WOODS < W uj CULT CULT - ------------- ------------ Fes, i rFOR -L PROFILE 7E SHEET�,� 48 & 49 PROJECT REFERENCE N�0. SHEET NO. % \ .w RN✓ SHEET NO. � ROADWAY DESIGN DRAULICS / ENGI�!£ER sENGINE£R tn I V GGLT CRE T .. + / RP11_�81.35 / HI v. 131.48 F F E F F —— 7 GRA V) RADF q F F �� e --"----" — a ----- F� �, a CaiAC7E � W F / o -- N C RAP e o & / ww, � s� OIJLT LTA ` 6 E \ �P 00 i \ � 4 FOR —L— PROFILE SEE SHTET 49 � FOR RPB— — PROFILE SEE SHEET 61 FOR, -RPC- PROFILE SEE SHEET 62 _~- v - INCOMP PE PLANS BRID ETCH 'RPB 20 Ei—125.80 RPD 4+ N" 2017 D 36 rifler, owl es 32 7 700 06 00 A F 1 2145 PLANS PROJECT REFERENCE NO. SHEET NO. i BB r RW SHEET'NO, ROADWAY T T 'TYPE B-77 T ENGINED ER S IGN HEYNDGRAINUELEICR S > INCOMPLE rE PLANS, DO 44OTffSE FOR k/W ACQUISLTFON TYPE 17 `­ ky OLANS - CONSTRUCTION N Tf 4Z 1612' B-77 E -T� 7 RE B-77 TYPE B-77 I=7 BRIDG E SKETCH (NOT TO SCALE) PG/> O 35 P W0QLS 6? CL B RIP RAP(CULT F k + \c \"c CATI C C14 c C c -7: IlL B RIP RAP a L DE C F GL, �PF II T T T T LLJ G -!EH'GPADE '�o RIP RAF c c P PAP c�8 RIP PAP 7, c c C c c c c c ODS I V F WOCI; CULT A- w? 27: AA/'4 r ion ........... TYPE TY 77- '� FOR —L 7"PR FILE' SEE SHEETS o & 5/ FO —RP 8— PROFILE SEE SHEET 60 PROJECT REFERENCE NO, SHEET NO. BEGIN BRIDGE '.`., � END BRIDGE"- "I -L- Sta.794+55.53 Sta.812+02.30 RlW SHEET NO, /1p ROkDWAY DES,�,N/ HYDR�WLIC T �T TYPE 8-77 ENGINEER ENGII EER 4 N, IN(j�*PLH F PLAN -V RY TYPE B-7 /V/� PR N PLANS NOT USE ED CONSTRUCTI N n PE B-77 s9s) FEI* TYPE -77 4 TYPE Ii APPR.SLAB END APPR.SLAB� 1 4- 4 -L- q 794*iz-,�-1 -L- Sto.812+14.30 (NOT TO SCAA) 4- BRIDGE/SKffCH _7 0 C? J� Ck 8 RlP"p� V- I.All Vii- 0 'V V-- CL 6 RIP RAP C; 4-- . F .......................... 4=) Xv CL 8 RIP RAI...... Pit, 7�- Q/-- Woo, GRADE 7—. G DE 2GI Luau -,v V-- ui 'V -V- CIL B RIP SWAMP\ 'N000s ............. 4- 4- OM18 ELEVATION 7 8 ; E 24651Zo� BL ST TI� 8I-38.00 &I RIGHT ; Qk R/ IIIE "S .!K 41 t 'v- 4- 4� V _V- A lk 4-- V- Q/-, 4-- I All 77"7-7- C, C) ri -0 jtl� z V-- 4- 4-- —Lj PROFILE�' SEE SHEET V FOR 5/ 1 PROM a 29 ROADWl"yW SHEET AY DESIGN HYDRAULICS TYPE 6.77 TytLE EN91NEER ENGINEER 1 r1 '. T T F7&4--- L z ; rE PLAN'S k/w ACQUISITION n PE B-73 AY PLANS DO, OT USR POR ;NSTRU�10N TYPES-77 N 7442'-18. 'E n n --T '7 h ^k PE 77 PE BRI �E S,� T,TO "!�'ITCH co ICULT Rlp""p C) CULT V) 2Gf F Type a WOOD�N e%j N I op't T�PE GI 7 G + 350 TL-3 F P\ IR c ui c c c c*- o F U/ LLJ rpE V) WOODS LG, <-"AD cy) CULT p LU N" p F WOODS A. CUL T J j D;�:N S ? -�S �sT� u� NJ TYPE B-77 J FOR ;PROFILE SEE SHEETS 5/& 52 PROJECT REFERENCE NO. SHEET NO. J 30 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER CULT + - 0 Elev. 1 0.37 Rip SYS Ong GVADE Gk GRADE CL RI RAP C ditch existing ditch "I, CULT WOODS CULT 2N E PROJECT REMENCE NO. SHEET NO. - RW SHEE r NO $ -7 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE rE PLANS w NOT USE FOR k/W ACQUISITION PRELIMINA.RY PLANS DO NOT USE FO i.CONSTRUCTION yn In/ f Q0 j G �2 +67-69 0.37 0 L R RIP RA f( LT CIL B RIP PAP PROTE I CULT B RIP P CULT F F /+ F A A, c c c c c c ..... F F C F F Z— 7 c FF _2--- -----------4— F 7 N CV) v. j 71 — IQ Lo Zi- -7 A 1 1 1 WDS RARE ary Gkl DE , k Dj 91 RAD Uj:: GR GR�OE 7 77 z—7 A�r — — — — — — — — — — — — 7 — wj —GRADE F F ui _I YL B RIP P�p c c /7 LLJ c- C An IR "L c c c c c c C Lia c j CULT u C 4p L-— tR, 'FOR —L— PROFILE SEE SHEETS 52 ,& 53 FOR 'PROFILE SEE SHEET );`�R2 S 64\,,\ PR T E D IN D I YDRA IC ENGftJ P E PL N USE 01y/ LR/.\ACQV ly Ll 1*(4. Y N ] N SE FO cONSTR crON In CREST SR2 47+88.74 4t Elev. 118.47 111(Nr tie prop ditch to CULT ..iStm g ditch K" Y s 0 F F C C C C C C E C + C A/ F o P1 -76 8 GRAD"-- 2CA UF 7 + GRAM— C C C� C RIP RAP, —00 C > C ------- F Ld F C tie I F L existing ditch A C CULT C U C Wool CULT 0 12B w� \ - V, 13 // w� ti prop di V Ali,,g dikh GR SUB STATION IR /10 X 14 ........... i ea CULT rz A U\ MONOLIMC CONC)"?IETE ISLAND M X FOR -L- PROFILE SEE SHEET 55 OR -Y23-IPROFILE SEE F SHEET 66 FOR -SR21- IPROFILE SEE SffET T4 -65 PROJECT REFERENCE NO. SHE NO. � ... . ,. =z ze ROADWAY RN✓'SHEET 3 DrWAN DESIGN "YDRAJ EE�S e T NO. i "^ h PLANS , E2 USE FOR /W ACQUISITION /// / ' PRELIMIN RY PLANS yC �� o� / r E ^^ SqG W 1. CULT...m ..^"' T_ VINYL PLANTER vigil cr R RIw var ^r. �� ,� ._..... + �, ` ' rOE PROIECTION '..� `� \ CL B RIP RAP i � B RIP RAP R Lj� Gil [7E –w J r �� P r E F E' P-Iw P Nir GRADE– ' _ — -• - P - o _..� c�\,'sue,_ P : w I GJADg Pqw CL B RIP RAP ""hw- •------ -.=.._._. ,�.. ',�. j -...-1. r-`�-._�, ,,, - ... ......--- _ ;v .. _ — IR a r o ` iC.B RII RAP / P _ P RP I ,P P ' P F R �I WOODS ' Lu CL B RIP RAP c _ µ PEST o� —tie prop iich �..� existing ditch �.. ( ( ^n,,,. J' ,.-°^ /� � ' IN / / �..-rte^"'--"..►�' ..-/' n y / INV' vv � / C J m _ �.. CULT ol CUR 0�lOLlT,HlC CONCRETE ISLAND �+ �� �', R -C- PROF,lLE SEE SHEETS1 53 &,54 ' FERENC NO 2 m PROJECT RE SHEET NO. ♦,° �' / q� ROADY...DESIGN HYDRAULICS ENGINER""*,� ENGINEER tl I / DO NOT USE FOR EE IT[ON ll"�WAEP-�011TMI FO CONSTRUCTION All FM o yV / a i pp t i VIN L� � � � '"`^a„ � _ � V' 1 m • \ d LAN ERDI CL�RIP 1 � N Tr .✓ q b C! / _.,�...._. .�._. .� _ 00 I ' ( UNIT ( C C , C ' P C C 2..PORT C C ! C. C � _ _ F F. GI AD �RADE __ �1 i o _ _ uj RCP -- i sL-^a GR .�. ]o C .r"' �� 'P DE- BST ----" cL ai RIP RAP R ru,N i to _ _ _ 28'BS --s.'..__"� �, P'W FES G q'VINY� Cl. E W {.. r1 CLBRIWRA 'r r. F � ' RCP W/FES _ _ pp IBB SK C, ISBKD - u A CP W/FES , 25FB / .,.. - ...-r....,— 1 1 § N ....- _ II -ISeKO 1 �o CO a s- NM9�a24 ry e-•s m e9 a[cA r prop SEND I + `� - BL%'TAT IO HT � -- _. ____.._ r^' .. _ \,,° ......, �.., Q 1 `pro-.-..." .✓' B B / �7a JIM 21 OPINE SPIKE Iq P .-. -"." rr`-' - / existing ditch .„ e RUINS a r / f woaos RU INS,, FOR ST—54 PROJECT REFERENCE NO. or SHEET NO. RN, SHEET NO, ROADWAY DESIGN HYDRAULICS < ENGINEER ENGINEER N rE PLANS k/W A qVISFTION RT/ PLANS M�STRU�10N 7 N� v .......... tc,11, �A N 3Cc!)8'X 6'RCBC TH VSW 00IQ -IN �MRREL 2 AND RN fT "Ilir IN Ln J IR'\ 1 AND 3K- ------ WF 7 7� F F_ Woods F F j > GRADE G DE 2 Ps 71 1� K- ............ w a) T* =W7— 54-CMP�1 00 7 wise 28'BST GRADE GRADE 8 - o ---— ——————— — — -- — — — — — - -7-77 GRAD x 7-- NV-9e, N�9 v if I C4 6RIp RAP 13 R) F F F S E311 N ­39-34 74' R/p s ATICIN 118 IKE UV 00 89 P1 INE p GHT o 1p, PL NS O�S u N /-E 'J- G DE DE J/ )E31 > 3 / —ORL— PRC)FILE SEE SHEET'54 N PROJECT REFERENCE NO. SHEET NO. 36 RW SHEET NO, ROADWAY DESIGN HYDRAULIC ENGINEER ENGINEER C9\ X A 0 ECK El —D EC T zo ,"BM 17," ELEVATION • 113. ISBKD ISFD 6785G E,,1462,9 K,I I BE STOTIPN 254-16;00 973 RIGHT R/R SPIKE IN IS' L 00 2SFD S3 o 11 CV 7 hI NV�1071 p Tm E,� E�11T- EIP C&C 1-1 OF✓ACK -2,4'CHL P 0 cash EXISTNG RW 0 Lu W ISBKD 2�RlKn D' uj D CK s B B BB LK u S < 2SFD 4/ P, .4 "P, r E PLANS k/W ACQUISITION Q�l RY PLANS CONSTRUCTION oo SFD ,Lo J ;D�-ll 77 -41 4 FOR, -Y242ET- SEE SHEET 2-H F OR -Y22 PROFILE SEE HEE7� 59 PROJECT REFERENCE'NO. SH T NO, IV✓ SHEET/ 0. WAY DESIGN x YDRAUL RS ENGIN +14�E 4�ll1 NS N.T�PL PRELImly W NOT L fS F01 M I N" CH �77 %�,N� x A Z ti 48' x x x 0 19, vvoo�s [sBKD 1.5 SFD woo�s C Fj z0* All LO C-11,09C n H." Nyll .6t d38 09C L0. 7 7, F NC 305 dST zo r 0 co tie ditch to "11" V) e.iZg ditch 00+ CULT /Z CULT 9 MPL'F, T NOT R pp ,5.0 gg" FOR -Y22DET L� AHE�k� _Z FOR -Y22 PROJECT REFERENCE NO. SHEET NO. 2017 AVERAGE DAILY TRAFFIC, T 2035 RW EE[ 0. WLIC ROAOWAY DES 16N HYDRA s ENGINEER ENGINEER -SR2-NEW SERVICE RD C-3 bk" NO z T- CP TY RUCTION PLANS CONST 555 e55 8 oo 0 Y23-MT.CARMEL RD SR 1333 CJ CULT CULT CULT SAG — — — — — — 7 SR2 /RUiNs Elev. 115.17 f C c J;K ............. ...... BM20 ELEVATION - I N 974429 E 2470729 BL STATION\351-98.00 1387 LEFWT D/R SPIKE 20' PINE \ I \j J . ...... ...........\..... 0 J \j RUNS Aso_ c Ln c c + cy)x :n . .......... . ........ SR 1333 UT LAffMEL HO U'BST —--—————————--— —————————— ———— ♦ z IASTINI Rl—' N c 'Nw SN WOODS wagErs ISEI-- 03 """SE i6 E IXIST So MP14 Vb 01 FOR 4,�J P FILE SEE SHEET 66, RO Allp FOR —SR2— P80FILE -SEE SHEET 65 PROJECT REFERENCE NO. SHEET NO. N R-2582B 39 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 130 P/� 455+75.00 EL 8130' INCOMPLE rE PLANS VC - 6W DO NOT USE FOR /W ACQUISITION 120 K - 184 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION rBEGIN GRADE Vo �� - STA.451+00.00 = 90.67' 110 100 100 90 90 80 r-/i 80 70 � � ` — _ - - r 70 � J 60 60 FOR-L- PLANS, 50 SEE SHTS 4 & 5 50 40 40 451+00 452+00 453+00 454+00 455+00 456+00 457+00 458+00 459+00 460+00 461+00 462+00 463+00 464+00 130 P1= 465+n21 130 EL = 93.42' VC = 250' K = 290 120 Vo= 70nWn 110 110 100 100 (+112865 MC 4249% 90 90 i 80 80 70 70 M k 60 60 m N N FOR-L- PLANS, 50 SEE SHTS 5 & 6 50 N� N� N� 40 40 m 464+00 465+00 466+00 467+00 468+00 469+00 470+00 471+00 472+00 473+00 474+00 475+00 476+00 477+00 478+00 o� tr PROJECT REFERENCE NO. SHEET NO. R-2582B 40 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 120 lzu 110 110 l+10.4 100 100 go 90 80 80 70 70 60 60 FOR -L- P NS, SEE SHTS 3 & 7 50 50 478+00 479+00 480+00 481+00 482+00 483+00 484+00 485+00 486+00 487+00 488+00 489+00 490+00 491+00 492+00 140 140 130 130 Ei _ 11020' V - 250' 120 K - 120 Vo= 70mph 110 (00.4247 !- .3233% 1 110 100 100 90 90 80 80 70 70 Z 60 60 g FOR -L- MANS, SEE SHTS 7 & 8 N4R YN3 50 50 492+00 493+00 494+00 495+00 496+00 497+00 498+00 499+00 500+00 501+00 502+00 503+00 504+00 505+00 506+00 tr PROJECT REFERENCE NO. SHEET NO. R-2582B 41 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION Pl= 5194 00.00 EL = l05 44' 120 120 vc 24' K - 335 v = 70 110 110 t- 3233% t+1030 3% 100 100 90 90 80 80 70 70 60 60 SEE SHTS 3 & 9 50 50 506+00 507+00 508+00 509+00 510+00 511+00 512+00 513+00 514+00 515+00 516+00 517+00 518+00 519+00 520+00 150 150 140 140 -- Sta.52 +00.00 - Rl- Sta.1D+00.00 L 108.7 C = 210'130 _ 130 120 120 110 110 100 100 90 90 80 80 Z 70 70 FOR _ g r1 SEE SHTS9 &S10 N4R YN3 60 60 520+00 521+00 522+00 523+00 524+00 525+00 526+00 527+00 528+00 529+00 530+00 531+00 532+00 533+00 534+00 PROJECT REFERENCE NO. SHEET NO. N R-2582B 42 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 120 110 110 (-)03000>., 100 100 90 90 80 80 70 70 6O FOR—L— PLANS, 60 SEE SHTS 10 & 11 50 50 534+00 535+00 536+00 537+00 538+00 539+00 540+00 541+00 542+00 543+00 544+00 545+00 546+00 547+00 548+00 140 140 130 130 P/- -%/+8140 120 EC - Mr 120 VC - 450' K - 750 Vo- 70mph 110 110 100 100 103000% 90 90 80 80 N a 70 70 m " N 60 60 l o FOR —L— PLANS, SEE SHTS 11 & 12 o� 50 50 m 548+00 549+00 550+00 551+00 552+00 553+00 554+00 555+00 556+00 557+00 558+00 559+00 560+00 561+00 562+00 o' PROJECT REFERENCE NO. SHEET NO. N R-2582B 43 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 120 110 110 t+ 3000% 100 100 +103000% 90 90 80 80 70 70 60 60 FOR -L- PLANS, SEE SHTS 12 & 13 50 50 562+00 563+00 564+00 565+00 566+00 567+00 568+00 569+00 570+00 571+00 572+00 573+00 574+00 575+00 576+00 140 140 PI- 576+00.00 1 4 L4 EL - 10337' 130 VC - 300' 130 K = 500 Vo= 70nwh 120 1 1 1 1 1 1 1 1 1 1 1 1 120 110 110 100 100 90 - - - — - - — — _ _ — 90 80 80 a 70 70 m N N 60 60 lo FOR —L— PLANS, N� SEE SHTS 13 & 14 o� m� 50 50 576+00 577+00 578+00 579+00 580+00 581+00 582+00 583+00 584+00 585+00 586+00 587+00 588+00 589+00 590+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 44 ROADWAY DESIGN HYDRAULICS 130 P/= 599+65.00 ENGINEER ENGINEER EL = 9627' VC = 450' INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 120 K - 262 PRELIMIN RY PLANS V°= 70mph DO NOT USE FO CONSTRUCTION 110 100 100 90 go 80 80 70 70 60 60 FOR -L- PLANS, SEE SHTS 14 & 15 50 50 40 40 590+00 591+00 592+00 593+00 594+00 595+00 596+00 597+00 598+00 599 599+00 600+00 601+00 602+00 603+00 604+00 130 PI- 612+OOM 130 EL - 9374 Pl= 605+50A0 VC - 500' 120 EL - 84•46' K - 279 120 VC - 625' K - 182 V°- 70mpA 110 V. 70nWA 110 100 100 (+ -4247;1__4 (-)03 90 L8O /-) A/49% (+)1,42 7 80 —. � 70 70 0 v k 60 60 m FOR-L- PLANS, N SEE SHTS 15 & 16 50 50 Np N� N� 40 40 m 604+00 605+00 606+00 607+00 608+00 609+00 610+00 611+00 612+00 613+00 614+00 615+00 616+00 617+00 618+00 o, PROJECT REFERENCE NO. SHEET NO. N R-2582B 45 ROADWAY DESIGN HYDRAULICS 130 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 120 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 110 100 100 90 -ao3668i 90 80 80 70 70 60 60 FOR —L— PLANS, SEE SHTS 16 & 17 50 50 40 1 40 618+00 619+00 620+00 621+00 622+00 623+00 624+00 625+00 626+00 627+00 628+00 629+00 630+00 631+00 632+00 120 P1= 634+00,00 120 EL = 85.67` 110 KC= 26 P1= 639+70.00 P1= 645+35.00 110 Vo= 70mph -L- t + EL = 7269 EL = 687M -Y19- ta.10+0 .00 VC = 300' VC = 420' BOO ES MILL FD. K = 191 BEGIN BRIDGE END BRIDGE K 190 100 Vo= 70mpA Vo= 70mph 100 90 90 l- 3668% l-12 4Y H 80 -" "' — — 80 !-!22774 L OL l- 7044• 70 7 f-107 44% 1+1150247 60 60 r a 50 50 m " N FOR—L— PLANS, 40 SEE SHTS 17 & 18 40 No N� o� 30 30 m 632+00 633+00 634+00 635+00 636+00 637+00 638+00 639+00 640+00 641+00 642+00 643+00 644+00 645+00 646+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 46 ROADWAY DESIGN HYDRAULICS 120 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 110 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 100 90 90 80 — 80 � r 70 ol 70 60 _ 60 50 50 FOR -L- PLANS, 40 SEE SHTS 18 & 19 40 30 30 646+00 647+00 648+00 649+00 650+00 651+00 652+00 653+00 654+00 655+00 656+00 657+00 658+00 659+00 660+00 130 130 P1= 661+50.00 L- Sta.b 0+04.33 EL = 9299" 20- Sta. 2+01.81 120 VC = 350 ARROWS MILL RD.1 1 1 120 K = 291 Vo= 70mph 110 110 100 100 (+1 24% mo.3 90 - - - - - - - - 90 80 80 70 70 60 60 m SEEERSHTSP 9N& 20 N 50 50 Np N� N� 40 40 m 660+00 661+00 662+00 663+00 664+00 665+00 666+00 667+00 668+00 669+00 670+00 671+00 672+00 673+00 674+00 o' PROJECT REFERENCE NO. SHEET NO. N R-2582B 47 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER 4 L INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 120 110 110 100 100 90 — 90 80 80 70 70 60 60 FOR—L— PLANS, SEE SHTS 20 & 21 50 1 1 50 674+00 675+00 676+00 677+00 678+00 679+00 680+00 681+00 682+00 683+00 684+00 685+00 686+00 687+00 688+00 140 140 -L- To.699+112.54 -- Sta.690+98.81 -SRl Sta.10+ 0.00 130 _ _ NEW SERVICE RD 1 130 US 158 120 120 110 110 (+X,3000% 100 100 90 — — 90 80 80 a 70 70 m " N 60 60 loC FOR —L— PLANS, SEE SHTS 21 & 22 o 50 50 m 688+00 689+00 690+00 691+00 692+00 693+00 694+00 695+00 696+00 697+00 698+00 699+00 700+00 701+00 702+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 48 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER PI= 705+00010 EL = 106012' INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 VC = 300' PRELIMIN RY PLANS K = 469 DO NOT USE PO CONSTRUCTION Vo- 7OnWh 120 110 110 (+ .3000% (-J03 /% 100 100 90 90 80 80 70 70 60 FOR -L- PLANS, 60 SEE SHTS 22 & 23 50 1 1 50 702+00 703+00 704+00 705+00 706+00 707+00 708+00 709+00 710+00 711+00 712+00 713+00 714+00 715+00 716+00 140 PI. 724+50,00 140 EL = 99.4Y VC = 300' 130 K = 200 130 Vo= 70mph 120 120 110 110 100 100 90 90 80 80 a 70 70 m " N 60 FOR -L- PLANS, 60 N° SEE SHTS 23 & 24 N� o� 50 50 m 716+00 717+00 718+00 719+00 720+00 721+00 722+00 723+00 724+00 725+00 726+00 727+00 728+00 729+00 730+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 49 ROADWAY DESIGN HYDRAULICS 150 ENGINEER ENGINEER J INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 140 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 130 120 120 t+1415 7. 110 ,,,,, ,,,. ... ... ,..,,_ .i 110 100 — 100 90 90 80 80 70 70 FOR—L— PLANS, SEE SHTS 24 & 25 60 1 1 1 60 730+00 731+00 732+00 733+00 734+00 735+00 736+00 737+00 738+00 739+00 740+00 741+00 742+00 743+00 744+00 160 PI- 752+00.00 160 EL - 13130' VC - 425' K - 234 150 Vo- 70i , 150 140 140 130 t+ x598/. "L:)0.65527 130 120 120 110 110 100 100 a 90 90 m " N 80 80 No FOR —L— PLANS, SEE SHTS 25 & 26 o 70 70 m 744+00 745+00 746+00 747+00 748+00 749+00 750+00 751+00 752+00 753+00 754+00 755+00 756+00 757+00 758+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 50 O ROADWAY DESIGN HYDRAULICS 100 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 170 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 160 150 ZL Sta.76 6+53.81 150 -N22- ta. + US 3)5 140 140 130 130 H 7.65627 120 — 120 110 — — — — "'� — 110 100 100 FOR -L- PLANS,SEE S 2 90 L 90 758+00 759+00 760+00 761+00 762+00 763+00 764+00 765+00 766+00 767+00 768+00 769+00 770+00 771+00 772+00 170 170 Pi= 781+25.00 160 EL = u2Jr 160 VC = 250' K = 247 150 yo= 70nwh 1 1 1 150 140 140 130 130 120 120 110 — r-1o6 +0,35427 110 100 100 m N N 90 90 loC S PLANS, EESHTS 6 & 27 o 80 80 mro 772+00 773+00 774+00 775+00 776+00 777+00 778+00 779+00 780+00 791+00 782+00 783+00 784+00 785+00 786+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 51 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 150 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION BEGIM BRIDGE -L- S rA.794+115.53 140 130 130 120 120 M0,354 110 110 100 100 'w 90 ` 1 90 80 80 FOR —L— PLANS, SEE SHTS 27 & 28 70 70 786+00 787+00 788+00 789+00 790+00 791+00 792+00 793+00 794+00 795+00 796+00 797+00 798+00 799+00 800+00 160 160 Pi- 805+00.00 EL - 12052' 150 VC - 401 END BRIDGE 150 K = 611 -L- TA.812+ 2.03 Vo= 70nrh 140 140 Y w w V 130 r 130 Vf 120 ( 3542% (-jo.3avy 120 110 110 100 — — "' 100 r 90 ... r 90 N 80 80 loC FOR —L— PLANS, N� SEE SHTS 28 & 29 o� 70 70 m 800+00 801+00 802+00 803+00 804+00 805+00 806+00 807+00 808+00 809+00 810+00 811+00 812+00 813+00 817+00 00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 52 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 150 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 140 130 130 120 — 120 t-103 110 — -' ' 110 100 100 90 90 80 80 FOR —L— PLANS, SEE SHTS 29 & 30 70 1 1 1 70 814+00 815+00 816+00 817+00 818+00 819+00 820+00 821+00 822+00 823+00 824+00 825+00 826+00 827+00 828+00 150 150 Pl= 839+00.00 EL = 110.32' 140 VC = 250' 140 K - 417 V,,- 7OffO 130 130 120 '" 120 110 110 100 100 90 90 N a 80 80 m " N 70 70 loC FOR —L— PLANS, N� SEE SHTS 30 & 31 o� 60 60 m 828+00 829+00 830+00 831+00 832+00 833+00 834+00 835+00 836+00 837+00 838+00 839+00 840+00 841+00 842+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 53 ROADWAY DESIGN HYDRAULICS 150 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 140 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION 130 120 120 (+ Opp% 110 110 100 100 90 90 80 80 70 70 FOR —L— PLANS, SEE SHTS 31 & 32 60 1 1 1 60 842+00 843+00 844+00 845+00 846+00 847+00 848+00 849+00 850+00 851+00 852+00 853+00 854+00 855+00 856+00 160 160 P(= 865+50.00 150 - EL = 150 ((82r - 23- Sta.'0+06.62 VC = 250' IVT CARME1 CHURCH RD. K 349 140 Vo- 70ffo 1 1 140 130 130 120 120 110 - - - - - - - - - - — .�— �. — — - - - - - 1�- 1r"' - - - - 110 100 100 a 90 90 m " N 80 80 loC FOR —L— PLANS, N� SEE SHTS 32 & 33 o� 70 70 m 856+00 857+00 858+00 859+00 860+00 861+00 862+00 863+00 864+00 865+00 866+00 867+00 868+00 869+00 870+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 54 ROADWAY DESIGN HYDRAULICS 150 ENGINEER ENGINEER J INCOMPLE E PLANS -L- Sta 880+20.)0 DO NOT USE FOR /W ACQUISITION 140 -Y24- S Ia.2 +94.72 PRELQIMINA RYST PLIANS DO S 158 130 120 120 -10.4/57% 110 110 100 '- — 100 90 90 80 80 70 70 FOR —L— PLANS, SEE SHTS 33 & 34 60 60 870+00 871+00 872+00 873+00 874+00 875+00 876+00 877+00 878+00 879+00 880+00 881+00 882+00 883+00 884+00 150 150 140 140 130 130 �a 3 120 120 z a U 110 v 110 f-10.415 rX 3 100 100 90 90 a 80 80 m " N 70 70 loC OR—L— PLANS, N� SEE SHTS 34 & 35 o� 60 60 m 884+00 885+00 886+00 887+00 888+00 889+00 890+00 891+00 892+00 893+00 894+00 895+00 896+00 897+00 898+00 o' PROJECT REFERENCE NO. SHEET NO. N R-2582B 55_ ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER Pl 900+00.00 END GRADE INCOMPLE E PLANS EL - 10393' -L- STA.902+00.00 DO NOT USE FOR /W ACQUISITION 130 VC = 280' EL = 106.14' PRELIMIN RY PLANS K = 184 DO NOT USE PO CONSTRUCTION Vo= 70n ph 120 lzu 110 .� 110 100 f- .4157% (+11J0 % — — 100 90 90 80 80 70 70 60 60 50 50 898+00 899+00 900+00 901+00 902+00 903+00 904+00 905+00 906+00 907+00 908+00 909+00 910+00 911+00 912+00 140 140 130 130 120 120 110 110 100 100 90 90 80 80 a 70 70 m " N 60 60 Np N� o� 50 50 m 912+00 913+00 914+00 915+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 56 Al ROADWAY DESIGN HYDRAULICS 150 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 140 PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 130 BEGIN GRADE —DRI— STA.10+47.09 EL = 106.34' PI= 10+70.00 120 EL = 104.44' END GRADE 120 —DRI—STA.11+27.90 = — Pl= ll+00,00 EL 98.55' EL = 9899 110 110 100 � 100 /57/% 90 90 80 80 70 70 FOR —DRI— PLANS,SEE SHT 9 60 60 10+00 11+00 12+00 13+00 130 120 120 110 100 100 BEGIN GRADE END GRADE —Y19— STA.10+47.00 —Y19—STA'12+00.00 EL = 75.72' EL = 69.39' Pl- 11+17,00 90 EL - 7OJ2' 90 VC - 100' K - /4 80 80 70 70 60 60 a 50 50 m " N 40 40 No FOR —Y19— PLANS,SEE SHT 17 o� 30 30 m� 10+00 11+00 12+00 13+00 14+00 15+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 57 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 130 PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 120 BEGIN GRADE -Y20-STA.18+50.00 END GRADE 110 EL = 89.59' PI- 19+55A0 EL 20 94.31'.21+42.64 110 EL - 89.6r VC - 200' K 81 100 1001 90 90 — — — — — — t+ A2447 VIM" —— 80 80 70 70 60 60 FOR -Y20- PLANS,SEE H:191 19 50 50 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 140 130 130 BEGIN GRADE 130 -Y21-STA.10+47.00 EL = 104.64' P1= 11+55.00 EL = 10570 FEYND GRADE VC = /00' 1-STA.15+00.00 120 K = 19 = 95.86' 120 P/= 13+85.00 EL = 962M VC = 100' K - 26 110 110 100 / 100 r- 90 90 80 80 a 70 70 m " N FOR -Y21- PLANS,SEE SHT 21 60 60 Np N� o� 50 50 m 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 o' PROJECT REFERENCE NO. SHEET NO. N R-2582B 58 ROADWAY DESIGN HYDRAULICS 140 ENGINEER ENGINEER INV INCOMPLE E PLANS DO NOT USE FOR /W ACOUIS[TION P/_ 20+0040 PRELIMIN 130 RY PLANS BEGIN GRADE EL - 10386, DO NOT USE PO CONSTRUCTION -SRI- STA.10+48.69 VC - 300' EL = 101.69' K - 254 120 Vo- 60A + 110 EK - �'� 110 pi 11+00DO W ox.5835"/. (-)0.59t Lpy 100 i, 100 t+1058.57 90 90 80 80 70 70 60 60 FOR -SRI- PLANS,SEE SHTS 22 & 23 50 1 1 1 50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 Al 140 140 130 130 END GRA 120 -SR1- STA. 0+53.04 120 EL = 97.59' 110 110 100 100 90 90 80 80 a 70 70 m " N 60 60 N° FOR -SRI- PLANS,SEE SHTS 22 & 23 N� o� 50 50 m 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 59 ROADWAY DESIGN HYDRAULICS 190 ENGINEER ENGINEER 7 INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 180 PRELIMINA4.RY PLANS DO NOT USE FO CONSTRUCTION 170 END BI IDGE -Y22- TA.30+8 5.57 -Y 160 22- S A.?9+89.13 = 160 P1= 23+8533 BEGIN BRIDGE BEGIN GRADE EL = 12439' -Y22 STA.28 91.12 1550 —Y22—STA.17+50.00 VC = 350' 1550 EL = 126.44' K = 66 I+) Vo = 40mpA 140 140 PI- 29+48.66 EL - 15252" 130 VC 440' 130 K - 44 Vo' 4Omph +)5 • 120 -' - - 2>"l.'— - - - - - - - - - - - — - - - - - - - - 120 110 110 FOR —Y22— PLANS,SEE SHT 26 & 36 100 1 1 1 100 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 160 170 150 160 140 END GRADE 1 '550 -Y22- STA.42+50.00 EL = 113.08' P1= 36+80A0 EL = 116.OM 130 VC = 300' P1- 41+8623 140 K = 69 EL - 112.61' Vo= 40mPh VC - 100' K - 71 Va - 4Onph 120 130 110 120 100 — — — — — — —1- 4/. t+IOJ 110 a 90 100 m N N 80 90 No FOR —Y22— PLANS,SEE SHT 26 & 37 o� 70 80 mro 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 60 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 150 PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION 140 BEGIN GRADE -RPA- STA.10+00.00 EL = 112.84' 130 P1- 20+50.00 130 PI= 13+35.00 EL - 114.62' EL = 11127' KC- 196 120 K0 = 320 V� - 70n ' 120 Vo= 70mph (+ .4688% f+)2 % 110 110 100 — — — — 100 90 90 80 80 FOR —RPA— PLANS,SEE SHT 26 & 27 70 1 70 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 170 170 160 END GRADE 160 —RPA— STA.30+19.56 EL = 134.01' 150 150 140 140 130 130 120 "— — —' — 120 ool i i 110 110 m a 100 100 m N N 90 90 No FOR—RPA— PLANS,SEE SHT 26 o� 80 80 mro 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 t PROJECT REFERENCE NO. SHEET NO. N R-2582B 61 ROADWAY DESIGN HYDRAULICS 170 ENGINEER ENGINEER INCOMPLE rE PLANS DO NOT USE FOR /W ACQUISITION 160 PRELIMINA RY PLANS DO NOT USE FO CONSTRUCTION BEGIN GRADE —RPB—STA.10+00.00 pin 12+1336 EL = 130.83' EL = 132J0' 150 vC = 350 K pi= 2/+20„00 Vo 65 65mpA EL = 12430' VC = 500' 140 K 175 140 Vo= 65npn +b5944i r-10 5i 130 130 f-10.8605. t+1 0000 120 _ 120 110 110 100 100 90 90 FOR —RPB— PLANS,SEE SHT 25 & 26 80 1 1 1 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 170 170 160 160 END GRADE -RPB- STA.26+05.68 EL = 134.01' 150 150 140 140 130 130 120 120 110 110 a 100 100 m N N 90 90 No FOR—RPB— PLANS,SEE SHT 26 o� 80 80 mro 23+00 24+00 25+00 26+00 27+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 62 ROADWAY DESIGN HYDRAULICS 170 ENGINEER ENGINEER BEGIN GRADE INCOMPLE E PLANS -RPC-STA.10+00.00 DO NOT USE FOR /W ACQUISITION EL = 129.44' -Tu 160 PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION P1 12+00.00 150 EL - 129.02' VC - 350r pin n+0000 K = 138 Et = 1153r V = 55ffo VC = 500' K - 105 140 V. - 50nWh 140 130 130 5% 120 120 110 — -- _ _ '_ 110 100 100 90 90 FOR -RPC- PLANS,SEE SHT 25 & 26 80 80 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 170 170 160 160 END GRADE -RPC- STA.24+41.94 EL = 130.15' 150 150 140 140 130 130 120 120 110 110 N a 100 100 m N N 90 90 N� FOR -RPC- PLANS,SEE SHT 26 o� 80 80 mro 23+00 24+00 25+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 63 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER BEGIN GRADE —RPD—STA.10+00.00 EL = 111.82' Lo of INCOMPLE rE PLANS DO NOT USE FOR /W ACQUISITION 150 PRELIMIN RY PLANS DO NOT USE FO CONSTRUCTION 140 P1- 10+78.94 Pl= 12+15A0 P1- 14+96.39 Et - 111.79' EL = 1122r Et - 110.43' VC = 50' VC = 200' VC - 350' K - 144 K - 213 K = 133 130 Vo= 60�d Vo- 65nwh Vo= 55mph 130 120 120 +103065' (-JO, 327% 110 110 100 100 90 90 80 80 FOR -RPD- PLANS,SEE SHT 26 70 1 1 1 70 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 170 170 160 160 END GRADE —RPD—STA.24+82.63 1550 EL = 130.15' 1550 140 140 130 130 120 120 110 110 a 100 100 m N N 90 90 No FOR —RPD— PLANS,SEE SHT 26 Ho� "° 80 80 23+00 24+00 25+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 64 ROADWAY DESIGN HYDRAULICS 01 160 ENGINEER ENGINEER P1- 14+45.00 INCOMPLE E PLANS EL - 1240 DO NOT USE FOR /W ACQUISITION 150 BEGIN GRADE VC - 250' PRELIMIN RY PLANS -SRZ- STA.10+26.08 K = 97 DO NOT USE FO CONSTRUCTION EL = 125.13' VD= 50tto P1= 19+60.00 140 EL = 10970 VC = 500' K 161 Vo- 60ft" + 130 130 120 _ — '—' — ._ - - _ - - '`� �. 120 110 — ► 110 100 _ — 100 90 90 80 80 FOR -SR2- PLANS,SEE SHTS 30 & 31 70 70 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 150 150 140 P1= 32+65'00 140 EL = 113.6r VC = 5w K = 17628 Vo= 60non + 130 130 120 �' — 120 110 +103000' f+10 52847 110 100 100 90 90 a 80 80 m " N 70 70 lo FOR -SR2- PLANS,SEE SHTS 31 & 32 o 60 60 m 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 65 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER IF INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION P1 48+50„p0 PRELIMIN RY PLANS 150 p EL - 118.82' DO NOT USE PO CONSTRUCTION VC - 300' K - 270 140 Vo- 60mpA + 130 130 120 " "' 120 110 - - - - — — � "" � — — ..__ - - 110 100 100 90 90 80 80 FOR-SR2- PLANS,SEE SHTS 32 & 38 70 1 70 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 160 160 150 150 Pl- 53+35.00 EL - 115.03' VC - 50' END GRADE 140 K - 18 -SR2-STA.54+19.74 140 Vo- 20n7ph EL = 116.72' 130 130 120 _ "" — — 120 110 110 100 100 a 90 90 m " N 80 80 Np FOR -SR2- PLANS,SEE SHT 38 o 70 70 �a 52+00 53+00 54+00 55+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 66 ROADWAY DESIGN HYDRAULICS to 160 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 150 PEG GRADE END GRADE BEGIN GRADE END GRADE PRELIMIN RY PLANS STA.16+75.00 -Y23- STA.19+85.77 -Y23- STA.20+87.69 -Y23-STA.23+50.00 Do NOT USE FO CONSTRUCTION 114.52' EL = 116.73' EL = 116.83' EL = 116.55' 140 Pl- 21+83.44 Pl- 18+35.00 EL - ))4.44' 130 VC - ° W 4 -K 0 130 K = 43 K - 40 Vo- 30nWh Va = 30�h 120 120 ... _ (02 z MOL 961X r-�2 _ +)►2678% 110 � - - - - - - _ — _ 110 100 100 90 90 80 80 FOR-Y23- PLANS,SEE SHTS 32 & 38 70 70 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 160 160 150 150 140 140 130 130 120 120 110 110 100 100 a 90 90 m " N 80 80 Np N� o� 70 70 �c 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00 39+00 o� PROJECT REFERENCE NO. SHEET NO. N R-2582B 67 ROADWAY DESIGN HYDRAULICS 160 ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION 150 BEGIN GRADE PRELIMIN RY PLANS -Y22DET-STA.12+32.86 DO NOT USE PO CONSTRUCTION EL = 123.86' 140 P1= 18+75.00 EL = 11628' VC = 300' P/= 25+85.00 K = 203 EL 118.4r Vo= 40trpn + VC = /50' 130 V 130 ,= 0ap) 120 120 110 110 100 100 90 90 80 80 FOR -Y22DET- PLANS,SEE SHTS 02-G & 02-H 70 1 1 1 1 1 70 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 160 160 AL LTE 150 150 140 140 PI= 27+75.00 END GRADE EL = 114DW -Y22DET- STA.28+50.68 VC = /00' EL = 113.64' K = 57 130 Vo= 35mpb 130 120 120 -�2.30rji; (-Z-3-00 110 �'/ al - - - - - - 110 100 100 a 90 90 m " N 80 80 N� FOR-Y22DET- PLANS,SEE StO2-H C5 70 70 m 26+00 27+00 28+00 29+00 30+00 31+00 o�