Loading...
HomeMy WebLinkAbout20191706 Ver 1_Certification of Completion_20220922Staff Review ............................................................................................. DWR Project #: * 20191706 Reviewer List* Version: * Doug Perez:eads\djperez CERTIFICATION SUBMITTED ON 9/22/2022 1 Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to submit it to the DWR 401 & Buffer Permitting Branch. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Is this a Public Transportation Project? Yes si No USACE Permit# SAW-2019-02442 DWR Project #: 191706 Version: 1 County: Mecklenburg 401 Water Quality Certification Issued Date: 1 /3/2020 Applicant: Piedmont Natural Gas (Duke Energy) Project Name: PNG Line 470 Supplemental Attachments: Click the upload button or drag and drop files here to attach document PNG Line 470 Wetland Photos.pdf 3.78MB PDF only Who will be submitting the Certification of Completion? Applicant Agent Certified Professional Applicant's Certification I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. By checking the box and signing box below, I certify that: a I have given true, accurate, and complete information on this form; a I agree that submission of the "Certificate of Completion" form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the "Certificate of Completion" form." Printed Name: Kelsey Pace Signature Note, the 401 approval for the PNG Line 470 Project (DWR #19-1706) was issued under Catawba County in error; this project occurred in Mecklenburg County. Also, to comply with Condition #11 of the 401 approval, "Photos of the restored wetland areas shall be provided upon completion", please find photos included. DIRECTI 152 deg( Line 470 - Coffey Point DIRECTION 155 deg(T) Line 470 - Green Park Circle 7903°N ACC 17 m .93681°W DA W6S84 35.17197°N 080.93536°W 2022-09-16 11:43:29-04:00 ACCURACY 6 m DATUM WGS84 2072-09-16 11:34:04-04:00 DIRECTION 35.17921°N ACCURACY 7 m 199 deg(T) 080.93643°W DATUM WGS84 Line 470 - Coffey Point 2022-09-16 11:42:43-04:00 DIRECTION 150 deg(T) Line 470 - Green 2022-09-16 Park Circle 11:33:19-04:00 DIRECTION 35.17241°N 183 deg(T) 080.93548°W Line 470 - Green Park Circle ACCURACY 9 m DATUM WGS84 DIRECTION 338 deg(T) Line 470 - Green Park Circle 35.17239°N 080.93542°W ACCURACY 10 m DATUM WGS84 2022-09-16 11:32:49-04:00 DIRECTION 240 deg(T) 35.16280°N 080.92970°W ACCURACY 14 m DATUM WGS84 Line 470 - Shopton Rd. DIRECTION 35.16240°N 222 deg(T) 080.92944°W ACCURACY 33 m DATUM WG584 Line 470 - Shopton Rd. 2022-09-16 11:24:30-04:00 DIRECTION 296 deg(T) Line 470 - Shopton Rd. DIRECTION 326 deg(T) rr :r Line 470 - Shopton Rd. 35.16315°N 080.92950°W 35.16341°N 080.92951°W ACCURACY 20 m DATUM WGSB4 2022-09-16 11:22:15-04:00 ACCURACY 6 m DATUM WGS84 2022-09-16 11:22:31-04:00 DIRECTION 196 deg(T) Line 470 - Fallow Ln, 35.15000°N 080.92937°W ACCURACY 5 m DATUM WGS84 ACCURACY 6 m DATUM WGSB4 2022-09-16 11:14:52-04:00 35.14237°N 080.92477°W ACCURACY 7 m DATUM WGS84 DIRECTION 352 deg(T) 35.15058°N 080.92936°W ACCURACY 10 m DATUM WGS84 Line 470 - 2022-09-16 Fallow Ln. 11:13:55-04:00 DIRECTION 146 deg(T) Line 470 - Fallow Ln. Line 470 - Arrowood Dr. 35.15001°N 080.92938°W ACCURACY 6 m DATUM WGS84 2022-09-16 11:14:48-04:00 2022-09-16 11: 05 : 45--04: 00 DIRECTION 35.14245°N 163 deg(T) 080.92432°W Line 470 - Arrowood Dr. ACCURACY 7 m DATUM WGS84 DIRECTION 35.17911°N 333 deg(T) 080.93679°W