Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3220805_Wetland Determination/Report_20220921
July 18, 2022 Mr. Tim Thompson LGI Homes 724 Hawley Street Charlotte, North Carolina 28214 Email: thompson@lgihomes.com SUMMIT ENGINEERING • LABORATORY • TESTING A Universal Engineering Sciences Company Subject: Estimated Seasonal High Water Table (ESHWT) Determinations Village at Granite Phase III Limestone Terrace Cornelius, North Carolina SUMMIT Project No. 3554.G0150 Dear Mr. Thompson SUMMIT Engineering, Laboratory and Testing, Inc. (SUMMIT) is pleased to submit this letter summarizing our observations of the soil test borings as related to Estimated Seasonal High Water Table Elevation (ESHWT) determinations in the proposed stormwater BMP ponds to be constructed for the proposed project listed above. This report contains a brief description of the project information provided to us, general site and subsurface conditions revealed during this exploration. PURPOSE OF EXPLORATION The primary purpose of this exploration was to obtain information regarding the subsurface conditions in the proposed stormwater BMP ponds, assess the engineering characteristics of the subsurface materials, and determination of the estimated seasonal high water table mark (if evident). Summary of ESHWT Determinations SUMMIT Project No. 3554.G0150 Village at Granite Phase III July 18, 2022 This report contains the following items: • Site Vicinity Map and Hand Auger Boring Location Plan, • Summary of Test Boring Observations, visual soil classifications and descriptions, • A general review of the subsurface soils and estimated seasonal high water table depth from existing ground surface (if evident), • Groundwater level measurements. EXPLORATION PROCEDURES SUMMIT visited the site on July 14t" of 2022 and performed two hand auger borings (identified as HA-1 and HA-2) in the proposed stormwater BMP ponds. The approximate location of the boring is shown on Figure 2 — "Hand Auger Boring Location Plan" provided in Appendix 2. The client (LGI Homes) provided SUMMIT a plan sheet titled "Grading Plan & Pipe Schedules" prepared by Bohler Engineering NC, PLLC, dated March 15, 2022, that indicated the approximate locations of the proposed stormwater BMP ponds. The borings were located by professionals from our office using the provided plan, recreation -grade handheld GPS, existing topography, and aerial maps as reference. Since the boring locations were not surveyed, the location of the borings should be considered approximate. We recommend the actual boring location be surveyed to determine the actual boring location and existing ground elevation. Hand Auger Borings HA-1 and HA-2 were generally advanced by manually twisting a bucket auger into the ground to approximate depths of 8 and 10 feet below the existing ground surface, respectively. The soil samples collected were visually examined and classified in general accordance with ASTM D-2488. Water level measurements were attempted at the termination of drilling. The classification symbols are depicted on the "Hand Auger Boring Logs" provided in Appendix 2. GENERALIZED SUBSURFACE STRATIGRAPHY General subsurface conditions observed during our geotechnical exploration are described herein. For more detailed soil descriptions and stratifications at the test location, the respective "Hand Auger Boring Logs" provided in Appendix 2 should be reviewed. The horizontal Summary of ESHWT Determinations SUMMIT Project No. 3554.G0150 Village at Granite Phase III July 18, 2022 stratification lines designating the interface between various strata represents approximate boundaries. Transitions between different strata in the field may be gradual in both the horizontal and vertical directions. Beginning from the ground surface, a layer of topsoil (surficial organic soils) was observed with thicknesses of approximately 3 inches. Beneath the topsoil layer in Hand Auger HA-1, fill (disturbed) soils that consisted of lean clays (CL) were encountered to an approximate depth of 2 feet below the existing ground surface. Beneath the fill soils in Hand Auger HA-1 and the topsoil layer in HA-2, residual (undisturbed) soils were encountered that generally consisted of lean clays (CL) and sandy silts (ML). Hand auger refusal conditions were encountered in Hand Auger Boring HA-1 at an approximate depth of 8 feet below the existing ground surface. GROUNDWATER LEVEL MEASUREMENTS At the time of drilling and after waiting more than 24 hours, groundwater was not observed in the borings. It should also be noted that groundwater levels tend to fluctuate with seasonal and climatic variations, as well as with some types of construction operations. Therefore, water may be encountered during construction at depths not indicated in the borings performed for this exploration. ESTIMATED SEASONAL HIGH WATER TABLE ESHWT is defined as the shallowest depth to a wet soil layer as a result of "true" or "permanent" groundwater at any time during the year. The ESHWT is typically identified with a change in the color of the soil layer due to water staining (typically, gray redoximorphic depletions and mottling). Spots or blotches of different color or shades of color interspersed with a dominant color in soil, commonly referred to as mottling. Mottling is a historic indication for the presence of groundwater caused by intermittent periods of saturation and drying, and may be indicative of poor aeration and impeded drainage. Mottling is a "general indication of groundwater" flow through this layer, but it is not known whether the groundwater flow was recent. Summary of ESHWT Determinations SUMMIT Project No. 3554.G0150 Village at Granite Phase III July 18, 2022 CONCLUSIONS Based on our observations, ESHWT indicators were not evident in soils sampled in the hand auger borings. Where the ESHWT is defined as the shallowest depth to a wet soil layer as a result of "true" or "permanent" groundwater at any time during the year. The BMP designer should take into consideration that perched water conditions may exist above the low permeable PWR stratum. The following table summarizes the results of the borings and our observations. Summary Table of the Boring Results and Our Observations Approx. GW Depth Hand Auger Boring ESHWT GW Depth After Refusal Test Depth Depth ATD 24 Hours Depth Location (Feet)' (Feet) (Feet)' (Feet)' (Feet)' HA-1 8 NE NE NE 8 HA-2 10 NE NE NE NE 1 Depths from existing ground surface. NE — Not Encountered in boring The analyses submitted in this report were based, in part, on data obtained from this exploration. If the above -described project conditions are incorrect or changed after the issuing of this report, or subsurface conditions encountered during construction are different from those reported, SUMMIT should be notified and these recommendations should be re-evaluated based on the changed conditions to make appropriate revisions. We have prepared this report according to generally accepted geotechnical engineering practices. No warranty, express or implied, is made as to the professional advice included in this report. Summary of ESHWT Determinations SUMMIT Project No. 3554.G0150 Village at Granite Phase III July 18, 2022 CLOSING SUMMIT appreciates the opportunity to provide our professional services for you on this project. If you have any questions concerning the information in this proposal or if we may be of further service, please contact us at 704.504.1717. Sincerely, SUMMIT ENGINEERING, LABORATORY & TESTING, INC. ��I�tiIIJii{t�� ` RO`' FAL r+� 042323 ' .y� 7/18/202? L ON 111110 Robert L. Price, P.E. Chief Engineer LIST OF APPENDICES "Xty111111111., CAR p4��,��' SUMMIT m : Engineering, Laboratory : oz 8 Testing, Inc. No. F-1454 < Appendix 1 Figure No. 1— Site Vicinity Map Adam Jordan Assistant Project Manager Figure No. 2 — Hand Auger Boring Location Plan Appendix 2 Hand Auger Boring Logs Summary of ESHWT Determinations Village at Granite Phase III SUNEMT Project No. 3554.G0150 July 18, 2022 SUMMIT ENGINEERING • LABORATORY • TESTING A Universal Engineering Sciences Company APPENDIX 1 Figures Oak Dr 9.. Figure 1 Site Location Plan Village at Granite Phase III Limestone Terrace Granity Quarry, North Carolina SUMMIT SCALE: NTS SUMMIT Project No.: 3554.G0150 n u.N. l e�i—d.g sd. C.. W" 3575 Centre Circle Fort Mill, South Carolina 29715 (803)504-1717 m MWE Ofso 1. E�j8] INS .��I®�®�� -•��rs-�. Ow, m m, won '• �� Lt la©��i .�� III •� ,� ; � .r • ��II�1®IIhI��I�'ti i"'qii®Ids �-�®�I�f�ll� �r�l®1llli�l�lf� �'' �'► mull®1® � �Ilil il�s,®� �I Homes - Village at Gra�nllte � stone Terrace •.'gyp ® _� �© I�-� ® B Figure 2 Village at GranitePhase III Hand Auger Boring Location Limestone Terrace 1AM Plan SUMMIT Granity Q•Carolina Summary of ESHWT Determinations Village at Granite Phase III SUMMIT Project No. 3554.G0150 July 18, 2022 SUMMIT ENGINEERING • LABORATORY • TESTING A Universal Engineering Sciences Company APPENDIX 2 Hand Auger Boring Logs /Ak HAND AUGER BORINGS & DCP TESTING SHEET Project Name: Villages at Granite Townhomes Project No.: 3554.G0150 SUMMIT [ ]D 7 n) 77 7� ENGINEERING • LABORATORY • TESTING Performed By. N. Sacks / R. F1tZGlbbon Date. 0 //14/2022 A Universal Engineering Sciences Company Location* Depth* feet Soil Descri tion Depth* feet DCP Blows Per 13/4-inch 1st 2nd 3rd Av . 0 — 0.25 Approx. 3 inches of Topsoil -1 9 6 is 12.0 HA-1 0.25 1 FILL: Olive Brown, Reddish Brown, and Gray Sandy Lean CLAY -2 9 15+ 15+ -3 15+ 15+ 1-2 Dark Gray, Dark Brown, and Reddish Brown Lean CLAY -4 14 15+ 15+ 2-5 RESIDUUM: Brown Sandy SILT -5 15+ 15+ 5-6 Dark Brown Micaceous Sandy SILT with Rock Fragments -6 15+ 15+ 6-8 Brown Sandy SILT -7 15+ 15+ -8 15+ 15+ HAR at 8 feet bgs on Rock Boring Terminated at 8 feet bgs Groundwater not encountered at time of digging 0 — 0.25 Approx 3 inches of Topsoil -1 15+ 15+ HA-2 0.25 - 1 RESIDUUM: Reddish Brown Sandy Lean CLAY -2 15+ 15+ 1-2 Reddish Brown Sandy Lean CLAY -3 15+ 15+ 2-5 Reddish Brown Slightly Clayey Sandy SILT -4 13 15+ 15+ 5-7 Reddish Brown Sandy SILT -5 11 15+ 15+ 7-10 Reddish Brown and Yellowish Brown Sandy SILT with Manganese Stains -6 10 13 15+ 15+ -7 13 13 13 13.0 -8 12 13 12 12.5 Boring Terminated at 10 feet bgs. -9 15+ Groundwater not encountered at time of digging -10 ELI 15+ IL��J Notes: * From Existing Ground Elevation * HAR — Hand Auger Refusal.