Loading...
HomeMy WebLinkAboutSW3220902_Plansheet - Misc. Detail_20220921 (2)PVC END CAP \ PVC TEE PVC ELBOW PVCAEPN D PVC PIPE 1/2" HOLES IN UNDERSIDE END VIEW DESIGN CRITERIA SUMMARY: SKIMMER SEDIMENT BASIN WATER SURFACE SCHEDULE 40 PVC PIPE FLEXIBLE HOSE PVC VENT PIPE FRONT VIEW SCHEDULE 40 PVC PIPE / ~ORIFICE PLATE PVC TEE BOTTOM SURFACE RIP -RAP PAD REQUIRED UNDER SKIMMER COIR BAFFLES CONSTRUCTION SPECIFICATIONS 1. 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. "C" ENCLOSURE 2, 2. INSTALL THE COIR FIBER BAFFLES IMMEDIATELY UPON EXCAVATION OF THE BASINS. 3. 3. INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP WATER ENTRY (PRACTICE 6.62, SEDIMENT FENCE). UNIT 4. 4. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES AND SKIMMER SPACED A MAXIMUM OF 4 FEET APART. THE TOP OF THE FABRIC NOTE: SKIMMER TO BE TETHERED SHOULD BE A MINIMUM OF 6 INCHES HIGHER THAN THE INVERT OF THE PRIMARY SPILLWAY: TRAPEZOIDAL SPILLWAY WITH IMPERMEABLE MEMBRANE MAXIMUM DRAINAGE AREA 10 ACRES MINIMUM VOLUME: 1800 CUBIC FEET PER ACRE OF DISTURBED AREA MINIMUM SURFACE AREA: 325 SQUARE FEET PER CFS OF 025PEAK INFLOW MINiMLIM L/W RATI 07 2:1 MAXIMUM UW RATIO: 6:1 BAFFLE (TYP.) MINIMUM DEPTH: 2 FEET DEWATERING MECHANISM- SKIMMER MINIMUM RING TIME;2 DAYS DESIGN BASINASIN Lim 3 YEARS OR LESS DAM HEIGHT.- 5 FEET MAXIMUM / BAFFLES REQUIRED- 3 BAFFLES SEE NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. NOTE: BASINS LESS THAN 20' IN LENGTH MAY USE 2 BAFFLES. STONE W/FABRIC <_� G,4 �ERGEN SKIMMER SPILLWAY. TOPS OF BAFFLES SHOULD BE A MINIMUM OF 2 INCHES LOWER THAN THE TOP OF THE EARTHEN EMBANKMENT. PERSPECTIVE VIEW 5. 5. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET �F ¢ iAND OUTLET DISCHARGE POINT: BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 6. 6. ATTACH A 9 GAUGE HIGH TENSION WIRE STRAND TO THE STEEL TETHER STONE ENERGY DISSIPATOR NOTES: 1. LOCATE SEDIMENT INFLOW TO THE BASIN AWAY FROM THE DAM TO PREVENT SHORT CIRCUITS FROM INLETS TO OUTLETS. 2. BASIN MUST BE STABILIZED IMMEDIATELY UPON CONSTRUCTION AND PRIOR TO SITE INSPECTION APPROVAL, SKIMMER SEDIMENT BASIN / POSTS AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION WITH PLASTIC TIES OR WIRE FASTENERS TO PREVENT SAGGING. IF THE TEMPORARY SEDIMENT BASIN WILL BE CONVERTED TO A STABLE TRANSITION PERMANENT STORMWATER BASIN OF A GREATER DEPTH, THE BAFFLE REgUIRED TO THE HEIGHT SHOULD BE BASED ON THE POOL DEPTH DURING USE AS A BASE OF THE SLOPE TEMPORARY SEDIMENT BASIN. 7. EXTEND 9 GAUGE MINIMUM HIGH TENSION WIRE STRAND TO SIDE OF BASIN OR INSTALL STEEL T-POSTS TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL END POSTS AS SHOWN IN FIGURE 6:65B. INLET ZONE 25% OF SURFACE AREA g DRAPE THE COIR FIBER MAT OVER THE WIRE STRAND MOUNTED AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION, SECURE THE COIR FIBER MAT TO THE WIRE STRAND WITH PLASTIC TIES OR WIRE FIRST CHAMBER 25% OF SURFACE AREA FASTENERS. ANCHOR THE MATTING TO THE SIDES AND FLOOR OF THE BASIN WITH 12 INCH WIRE STAPLES, APPROXIMATELY 1 FT APART, SECOND CHAMBER ALONG THE BOTTOM AND SIDE SLOPES OF THE BASIN. 25% OF SURFACE AREA 9. D❑ NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN EXTEND BAFFLES UP AS TO NOT ALLOW FLOW AIROUND 10. ADJUSTMENTS MAY BE REQUIRED IN THE STAPLING REQUIREMENTS \ THE ENDS: TO FIT INDIVIDUAL SITE CONDITIONS. OUTLET ZONE 25%4 OF SURFACE AREA SUPPORT ROPE TO WIRE TO PREVENT SAGGING 4'MAX DESIGN LIFE OF FABRIC IS 6-12 MONTHS BAFFLE DETAIL SUPPORT POST 24" INTO BOTTOM OR SIDES STAKE TO SUPPORT WIRE -� 3' MIN COIR M E$H OR JUTE, TRENCHED INTO BOTTOM AND SIDE CONSTRUCTION SPECIFICATIONS 1. CLEAR, GRUB, AND STRIP THE AREA UNDER THE EMBANKMENT OF ALL VEGETATION AND RUU I MAT. REMOVE ALL SURFACE SOIL P HIGH AMOUNTS OF MATTER AND OR OF IT ALL CONTAINING ORGANIC STOCKPILE DISPOSE PROPERLY: HAUL OBJECTIONABLE MATERIAL TO THE DESIGNATED DISPOSAL AREA. PLACE TEMPORARY SEDIMENT CONTROL MEASURES BELOW BASIN AS NEEDED 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOODY VEGETATION, ORGANIC MATTER, AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES, AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT, 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL (TYPICALLY 4-INCH SCHEDULE 40 PVC PIPE) ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM THE FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURERS INSTRUCTIONS, OR AS DESIGNED. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACH THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT OR SUPPORT. BE SURE TO ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN, THIS WILL BE USED TO PULL THE SKIMMER TO THE SIDE FOR MAINTENANCE. 7. EARTHEN SPILLWAYS --INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTENT POSSIBLE. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE SPILLWAY. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC_ THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR: ANCHORING IN A TRENCH. THE EDGES MAYBE SECURED WITH 8-INCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE, NOT JOINED OR SPLICED; OTHERWISE WATER CAN GET UNDER THE FABRIC. IF THE LENGTH OF THE FABRIC IS INSUFFICIENT FOR THE ENTIRE LENGTH OF THE SPILLWAY, MULTIPLE SECTIONS, SPANNING THE COMPLETE WIDTH, MAY BE USED. THE UPPER SECTION 5 SHOULD OVERLAP THE LOWER SECTION(S) SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. (ADAPTED FROM "A MANUAL FOR DESIGNING, INSTALLING AND MAINTAINING SKIMMER SEDIMENT BASINS." FEBRUARY, 1999. J_ W. FAIRCLOTH & SCAN.). 8. INLETS --DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION, USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT- LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 9. EROSION CONTROL --CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED, STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL OTHER DISTURBED AREAS ABOVE THE CREST OF THE PRINCIPAL SPILLWAY IMMEDIATELY AFTER CONSTRUCTION (RFFFRFNCFS• SIIRFA(.F STARII 17A7I0N). 10. INSTALL POROUS BAFFLES AS SPECIFIED IN PRACTICE 6.65, POROUS BAFFLES. 11. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY (REFERENCES- SURFACE STABILIZATION). 3d PIPE OUTLET TO FEAT AREA WITH NO DEEINED CHANNEL 01011�y 1. La IS THE LENGTH OF THE RIP -RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS TAN 6". 3. IN A WELL DEFINED CHANNEL EX -TEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER La FABRIC MUST BE INSTALLED BETWEEN THE RIP -RAP AND SOIL d III III �)rff -mm _M mI FOUNDATION. 1 1 I I I 5. INSTALL PAD ON 0% GRADE FILTER BLANKET SECT. AA OUTLET STABILIZATION STRUCTURE NCDOT #5 OR #57 WASHED STONE RT,S. 4' M AX NCDOT #5 OR #57 WASHED STONE F%A CONSTRUCTION SPECIFICATIONS: 1. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER FABRIC FOUNDATION, 2. KEEP THE CENTER STONE SECTION AT LEAST 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. 3. EXTEND STONE AT LEAST 1-5 FEET BEYOND THE DITCH BANK (FIGURE 8.83B) TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. 4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. 5. PROTECT THE CHANNEL AFTER THE LOWEST CHECK DAM FROM HEAVY FLOW THAT COULD CAUSE EROSION. 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM IS STABLE. 7. ENSURE THAT OTHER AREAS OF THE CHANNEL, SUCH AS CULVERT ENTRANCES BELOW THE CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES, 4 TO 7 IN STONE (TYP.) 12 IN MIN. TOP OF BANK FLOW 2, 7 ra DEPTH 12 IN OF APRON 12 IN MIN. DITCH,D (TYP.) Y=D/2 I 8 IN 5 20 1N 2 FTO MAX. -� SUppE, 8 IN KEY IN NONWOVEN GEOTEXTILE GEOTEXTILE 6 IN ' SPACING, X APRON (TYP.) 4 TO 7 IN STONE NONWOVEN CHANNEL PROFILE GEOTEXTILE CHECK DAM 2' MAINTENANCE NOTES: MAINTENANCE 1.) TOTAL DRAINAGE AREA FLOWING TO SILT -METAL FENCE POST INSPECT SEDIMENT FENCES AT LEAST FENCE MAY NOT EXCEED 114 ACRE PER 100' ONCE A WEEK AND AFTER EACH OF FENCE. DRAINAGE AREAS MAY BE 14 GAUGE MINIMUM RAINFALL. MAKE ANY REPAIRS INCREASED WITH A STORAGE PIT IN FRONT HOGWIRE (OPTIONAL) IMMEDIATELY. OF FENCE ANDIOR STONE OUTLETS. SHOULD THE FABRIC OF A SEDIMENT 2.) MAXIMUM PLACEMENT OF POST USING PROPEX FENCE COLLAPSE, YEAR, DECOMPOSE HOG WIRE WITH APPROVED EROSION xQ FABRIC WIWIRE BACKING OR BECOME INEFFECTIVE, REPLACE IT CONTROL FABRICS TO BE 8'4% s, g PROMPTLY. 3.) MAXIMUM PLACEMENT OF POST WITHOUT b REMOVE SEDIMENT DEPOSITS AS HOG WIRE WITH APPROVED EROSION N ACKFILL WITH DIRT NECESSARY TO PROVIDE ADEQUATE CONTROL FABRICS TO BE 6-0".STORAGE VOLUME FOR THE NEXT RAIN C) SKIRT AND WIRE OF FABRIC SHOULD BE AND TO REDEUCE PRESSURE ON THE TRENCHED 5" INTO GROUND AND co FENCE. BACKFILLED WI DIRT TO 6" ABOVE GROUNDFLOW REMOVE ALL FENCING MATERIALS AND io = = UNSTABLE SEDIMENT DEPOSITS AND ==ITI=III1 --1 _ _, BRING THE AREA TO GRADE AND 6" STABILIZE IT AFTER THE CONTRIBUTING o DRAINAGE AREA HAS BEEN PROPERLY N STABILIZED. 19 GAUGE HARDWARE CLOTH Y4 MESH OPENINGS INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (/, INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL, REPLACE STONE AS NEEDED. STANDARD INLET PROTECTION (HARDWARE CLOTH & GRAVEL) NTS z � KEY IN GEOTEXTILE 6 IN IN LAYE2 R OF WASHED AGGREGATE CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATE STABILIZE IT IMMEDIATELY. AMERICAN EXCELSIOR COMPANY 2 CURLEXe NET FREE BLANKET -MIN. (OR EQUIVALENT) COMPACTED SOIL 24" MIN. FL°IN -III III III III 6 TYPICIAL I I I III III III III _III III III I I I CLEAN WATER DIVERSION SWALE N.T.S. SILT FENCE POST: METAL T-POST 5'4' OR 6'4' IN HEIGHT DEPENDING ON FILL SLOPE (MIN, 1,33 LBILF STEEL CONSTRUCTION) FABR10.3-0" IN WIDTH (MUST MEET STANDARD S-PECIFICATIONS FOR SILT FENCE - A$TM D 6461). SILT FENCE DETAIL N.T.S. a OL d50=4" 4' SILT FENCE W/ TEMP. ROCK OUTLET •iTe TYPICAL SWALE CROSS-SECTION: SILT FENCE CLASS 1 OR 2 RIP -RAP WITH 6 INCHES OF WASHED STONE ON STEEL POST UPSTREAM FACE 4' MAX. WIRE FENCING (IF APPLICABLE) STEEL POST i CLASS 1 OR 2 WOVEN FILTER FABRIC ?� RIP -RAP 7 MIN_ WASHED STONE NCDOT #5 OR #57) - __ -III -ul GENERAL NOTES: MAINTENANCE NOTES: 1. SEDIMENT FILTER OUTLET SHALL BE 16 INCHES HIGH BUT NO TALLER THAN 18 INCHES. 1, FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING 2. CLASS 1 OR 2 RIP -RAP SHALL BE USED AND COVERED WITH 5 INCHES OF NCDOT #5 OR PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. #57 WASHED STONE ON THE UPSLOPE SIDE. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. OR REMOVED IT. 4. SITE OUTLETS AT ANY POINT SMALL CONCENTRATED FLOWS ARE ANTICIPATED AND AT THE 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT DIRECTION OF THE INSPECTOR. OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. GRADE, PREPARED AND SEEDED. ROCK OUTLET FOR SILT FENCE NTS CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL, IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. COMPACTED SCII 6' TYPICAL DIVERSION SWALE DIVERSION DIKE HOLD-DOWN STAKES _ 4' MIN _ ISLAND OVER INLET 15 MIN INLET 10' SPACINGPLASTIC coRRucATE� v PIPE 41 x 4'W x 18" DEEP CLASS "B" RIP RAP STABILIZE 1� OUTLET \ TOP OF 4' min DI VERS ON T NATURAL GROUND a V MIN. 1.5' MIN I�T ' a a a _ 4' MIN DIVERSION CHANNEL LEVEL TEMPORARY SLOPE DRAIN TOP OF HAND -COMPACTED FILL (ISLAND) o.s' min 3:1 a a Z ilr;� D � � ~ 2 QJ i7 2 gaz =afl �I.-� Z zzm Z �} z W LL Q J 0 < 0 0 ro V C? J Q � W U} J a 0 Z 2 0 H a z Z 0 J co 0 0 w ~ � Q W Q oz U 0 z of =0 Uzm= O oU0 LU Lu a}�Q x-0 W a m a Z o Z O_ E E W C S a W H- a cl a a a a A A DRAWN BY : JRA CHECKED BY: AC DATE: 08/05/2022 PROJECT NO.: 03003.003 REF. NO.: - SCALE: NTS H R 053670 SHEET 'I OF 1 2