Loading...
HomeMy WebLinkAboutSW4220602_Supplement-EZ Form_20220921SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Project Area (ac) 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 Is this project High or Low Density? 6 Does this project use an off -site SCM? Nordfab Systems, Inc. Buidli 13.91 1.15 Low No ion COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 ISand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 1 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Benjamin A. Palmer, PE / Project Engineer 28 Organization: Davis -Martin -Powell 29 Street address: 6415 Old Plank Road 30 City, State, Zip: High Point, NC 27265 31 Phone number(s): 336-886-4821 32 1 Email: bpalmer@dmp-inc.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. ``�I11111111//� ' •`�� �pFEj�oiy � • '� SEAL 25496 09/21/2022 F/VGI NEER ►►IIIIIII%%\` Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 1 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Type of SCM Entire Site LD 1 4 N/A N/A 5 Total drainage area (sq ft) 605919 605919 6 Onsite drainage area (sq ft) 605919 605919 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 305558 sf 305558 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) sf sf 10 New BUA not on subdivided lots (subject to permitting) (so Offsite BUA (sq ft) 93238 sf 93238 sf 11 sf sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) 11238 sf 11238 sf - Sidewalk (sq ft) sf sf - Roof (sq ft) 54000 sf 5400 sf - Roadway (sq ft) sf sf - Future (sq ft) 28000 sf 2800 sf - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) sf sf 14 New infiltrating permeable pavement not on subdivided lots (sq ft) sf sf 15 Existing BUA that will remain (not subject to permitting) (sq ft) 212320 sf 212320 sf 16 Existing BUA that is already permitted (sq ft) sf sf 17 Existing BUA that will be removed (sq ft) sf sf 18 Percent BUA 24% I 24% 19 Design storm (inches) .0 in .0 in 20 Design volume of SCM (cu ft) cf cf 21 Calculation method for design volume cf 0 ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 31 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 1.97 6 JAre curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project: