HomeMy WebLinkAboutNCC223321_Site Plan or Location Map_20220922F_
SHEET —INDEX
C,"C CT M C C%/'. M 1 M T I eN KI
G-000
Cover Sheet
G-001
General Project Notes
E-0.1
Electrical Cover Sheet
E1.1
Electrical Plan NE
E1.2
Electrical Plan SW
L-011
Scope of Work Plan
L-201
Site Features Plan
L-202
Site Features Plan
L-203
Site Features Plan
L-204
Site Features Plan
L-205
Site Features Plan
L-206
Site Features Plan
L-501
Planting Plan
L-502
Planting Plan
L-503
Planting Plan
L-504
Planting Plan
L-505
Planting Plan
L-506
Planting Plan
L-601
Irrigation Plan Diagram
L-701
Site Details
L-702
Site Details
L-703
Site Details
L-704
Site Details
L-705
Site Details
L-706
Site Details
C-101
Existing Conditions
C-201
Demolition Plan
C-301
Erosion Control
C-401
Grading/Draiage Plan
C-501
Details
C-502
Details
C-503
Details
C-504
Details
C-505
Details
C-506
Details
C-506B
Details
L
GENERAL PROJECT NOTES
A. THE FOLLOWING GENERAL NOTES APPLY TO THESE CONTRACT DOCUMENTS AND ARE
NOT SPECIFIC TO ANY ONE DISCIPLINE.
B. IT IS THE CONTRACTORS RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUB -CONTRACTORS, TRADES AND SUPPLIERS WITH THE REQUIREMENTS OF THE
CONTRACT BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES
ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS
OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT
PARTY.
C. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE DISTRIBUTED OR
UTILIZED BY THE CONTRACTOR.
D. THE CONSTRUCTION DOCUMENTS ESTABLISH DETAILED MINIMUM REQUIREMENTS FOR
THE CONSTRUCTION OF THE PROJECT.
E. THE LANDSCAPE ARCHITECTURAL DRAWINGS ESTABLISH, COORDINATE AS WELL AS
TAKE PRECEDENCE FOR THE FINISH APPEARANCE OF ALL EXPOSED ELEMENTS OF THE
WORK OF ALL TRADES INCLUDING THAT WORK WHICH IS ILLUSTRATED PRIMARILY ON
DRAWINGS OF OTHER DISCIPLINES.
F. THE DRAWINGS MAY MAKE REFERENCE TO AND/OR ILLUSTRATE ITEMS WHICH ARE NOT
PART OF THE WORK OF THE CONTRACT. THESE "NOT IN CONTRACT" ITEMS ARE
REFERENCED AND/OR ILLUSTRATED FOR THE CONTRACTORS REFERENCE, INFORMATIC
AND COORDINATION ONLY.
G. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH APPLICABLE LAWS, CODES,
REGULATIONS AND ORDINANCES OF THE PLACE (CITY, COUNTY, DISTRICT AND STATE)
WHERE THE PROJECT IS LOCATED - ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
REFLECTED BY THESE CONTRACT DOCUMENTS.
H. EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD DRAWINGS AND OR
VISUAL FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITION
AT THE SITE PRIOR TO SUBMITTING A BID. THE CONTRACTOR SHALL NOTIFY THE
LANDSCAPE ARCHITECT OF ANY DISCREPANCIES.
I. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND SIMILAR RELEASES
REQUIRED FOR THE CONSTRUCTION AND OCCUPANCY OF THE PROJECT. THE
CONTRACTOR SHALL FURNISH COPIES OF ALL SUCH ITEMS TO THE OWNER AND
ARCHITECT WITHIN 10 DAYS OF RECEIPT OF SUCH ITEMS. IF PERMITS ARE ISSUED
SUBJECT TO CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR IF PERMITS ARE
DELAYED FOR ANY REASON, THE CONTRACTOR SHALL NOTIFY THE OWNER AND
LANDSCAPE ARCHITECT.
J. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN AND PROTECT NEW WORK
AS WELL AS EXISTING SYSTEMS AND ELEMENTS WHICH ARE TO REMAIN. ANY DAMAGE
TO SUCH SYSTEMS AND ELEMENTS SHALL BE IMMEDIATELY REPAIRED IN A MANNER
ACCEPTABLE TO THE LANDSCAPE ARCHITECT. IF SATISFACTORY REPAIRS CANNOT BE
MADE, THE CONTRACTOR SHALL REPLACE SYSTEMS AND ELEMENTS WITH "LIKE NEW"
QUALITY ACCEPTABLE TO THE LANDSCAPE ARCHITECT. ALL REPAIRS AND
REPLACEMENT COST SHALL BE THE FINANCIAL RESPONSIBILITY OF THE CONTRACTOR.
d*
7
W
TERRY►SANFORD
REGIONAL MAP
ucl
o rth
93 -il -r@
Fayetteville `
6
i
\ 'I
PROJECT LOCATION
os
o�
�a
Electrotek�
9. \ ` \`
Nood4ring�, a�Q
es, Fayetteville 4
` _Perfect Shad! _ J
Window7inl e/
agg B �d
wRowanSr WRol,-a Bragg Brio,
Rowan Park '`_ PROJECT SITE
1^� Row
Professional ��. a� Sr
Automobile De1aiZk1,,
W
a
1
NCWarks Career C
� t —
.�``` ; BB&T9
t
tt ,-
North Carolina �� t
Veterans Park
r
9
m y�anal �
w
res1ival Park
rP
Support
-enrent Office
Airborne & G
Special Operations... `T'
,Nbh Sl
Reger
First Baptist Churc
North Carolina
Veterans Park
Phase 11
300 Bragg Blvd.
Fayetteville, NC
28301
Owner
.....................................................................................................................
City of Fayetteville
121 Lannon Street
Fayetteville, NC 28301
Landscape Architect
................................................................................................................
RATIO
227 Fayetteville Street, Suite 301
Raleigh, North Carolina 27601
919-821-0805
Civil Engineer / Water Resources / Environmental
.....................................................................................................................
SEPI Engineering & Construction, Inc.
1 Glenwood Ave., Suite 600
Raleigh, NC 27603
Electrical Engineer
.....................................................................................................................
The Wooten Company
120 North Boylan Avenue
Raleigh, NC 27603
KEY PLAN
SEALIDATE
SHEET ISSUE
01
BID SET
09103121
02
FINAL PERMIT SET
02103122
03
NCDEQ COMMENTS
08/08/22
ARCHITECTURAL AND ENGINEERING
FMT10 COPYRIGHT NOTICE: THIS
DRAWING IS GIVEN IN CONFIDENCE
AND SHALL BE USED ONLY
PURSUANT TO THE AGREEMENT
WITH RATIO. NO OTHER USE,
DISSEMINATION OR DUPLICATION
MAY BE MADE WITHOUT PRIOR
WRITTEN CONSENT OF RATIO. ALL
COMMON LAW RIGHTS OF
COPYRIGHT AND OTHERWISE ARE
HEREBY SPECIFICALLY RESERVED.
PROJECT NO. 19097.000
SHEET TITLE
GENERAL PROJECT
NOTES
SHEET NUMBER
G-001