Loading...
HomeMy WebLinkAboutNCC223321_Site Plan or Location Map_20220922F_ SHEET —INDEX C,"C CT M C C%/'. M 1 M T I eN KI G-000 Cover Sheet G-001 General Project Notes E-0.1 Electrical Cover Sheet E1.1 Electrical Plan NE E1.2 Electrical Plan SW L-011 Scope of Work Plan L-201 Site Features Plan L-202 Site Features Plan L-203 Site Features Plan L-204 Site Features Plan L-205 Site Features Plan L-206 Site Features Plan L-501 Planting Plan L-502 Planting Plan L-503 Planting Plan L-504 Planting Plan L-505 Planting Plan L-506 Planting Plan L-601 Irrigation Plan Diagram L-701 Site Details L-702 Site Details L-703 Site Details L-704 Site Details L-705 Site Details L-706 Site Details C-101 Existing Conditions C-201 Demolition Plan C-301 Erosion Control C-401 Grading/Draiage Plan C-501 Details C-502 Details C-503 Details C-504 Details C-505 Details C-506 Details C-506B Details L GENERAL PROJECT NOTES A. THE FOLLOWING GENERAL NOTES APPLY TO THESE CONTRACT DOCUMENTS AND ARE NOT SPECIFIC TO ANY ONE DISCIPLINE. B. IT IS THE CONTRACTORS RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF ALL SUB -CONTRACTORS, TRADES AND SUPPLIERS WITH THE REQUIREMENTS OF THE CONTRACT BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT PARTY. C. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE DISTRIBUTED OR UTILIZED BY THE CONTRACTOR. D. THE CONSTRUCTION DOCUMENTS ESTABLISH DETAILED MINIMUM REQUIREMENTS FOR THE CONSTRUCTION OF THE PROJECT. E. THE LANDSCAPE ARCHITECTURAL DRAWINGS ESTABLISH, COORDINATE AS WELL AS TAKE PRECEDENCE FOR THE FINISH APPEARANCE OF ALL EXPOSED ELEMENTS OF THE WORK OF ALL TRADES INCLUDING THAT WORK WHICH IS ILLUSTRATED PRIMARILY ON DRAWINGS OF OTHER DISCIPLINES. F. THE DRAWINGS MAY MAKE REFERENCE TO AND/OR ILLUSTRATE ITEMS WHICH ARE NOT PART OF THE WORK OF THE CONTRACT. THESE "NOT IN CONTRACT" ITEMS ARE REFERENCED AND/OR ILLUSTRATED FOR THE CONTRACTORS REFERENCE, INFORMATIC AND COORDINATION ONLY. G. THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH APPLICABLE LAWS, CODES, REGULATIONS AND ORDINANCES OF THE PLACE (CITY, COUNTY, DISTRICT AND STATE) WHERE THE PROJECT IS LOCATED - ALTHOUGH SUCH REQUIREMENTS MAY NOT BE REFLECTED BY THESE CONTRACT DOCUMENTS. H. EXISTING CONDITIONS SHOWN ARE FROM AVAILABLE RECORD DRAWINGS AND OR VISUAL FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITION AT THE SITE PRIOR TO SUBMITTING A BID. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES. I. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND SIMILAR RELEASES REQUIRED FOR THE CONSTRUCTION AND OCCUPANCY OF THE PROJECT. THE CONTRACTOR SHALL FURNISH COPIES OF ALL SUCH ITEMS TO THE OWNER AND ARCHITECT WITHIN 10 DAYS OF RECEIPT OF SUCH ITEMS. IF PERMITS ARE ISSUED SUBJECT TO CERTAIN CONDITIONS OR REVISIONS TO THE WORK OR IF PERMITS ARE DELAYED FOR ANY REASON, THE CONTRACTOR SHALL NOTIFY THE OWNER AND LANDSCAPE ARCHITECT. J. THE CONTRACTOR SHALL TAKE PRECAUTIONS TO MAINTAIN AND PROTECT NEW WORK AS WELL AS EXISTING SYSTEMS AND ELEMENTS WHICH ARE TO REMAIN. ANY DAMAGE TO SUCH SYSTEMS AND ELEMENTS SHALL BE IMMEDIATELY REPAIRED IN A MANNER ACCEPTABLE TO THE LANDSCAPE ARCHITECT. IF SATISFACTORY REPAIRS CANNOT BE MADE, THE CONTRACTOR SHALL REPLACE SYSTEMS AND ELEMENTS WITH "LIKE NEW" QUALITY ACCEPTABLE TO THE LANDSCAPE ARCHITECT. ALL REPAIRS AND REPLACEMENT COST SHALL BE THE FINANCIAL RESPONSIBILITY OF THE CONTRACTOR. d* 7 W TERRY►SANFORD REGIONAL MAP ucl o rth 93 -il -r@ Fayetteville ` 6 i \ 'I PROJECT LOCATION os o� �a Electrotek� 9. \ ` \` Nood4ring�, a�Q es, Fayetteville 4 ` _Perfect Shad! _ J Window7inl e/ agg B �d wRowanSr WRol,-a Bragg Brio, Rowan Park '`_ PROJECT SITE 1^� Row Professional ��. a� Sr Automobile De1aiZk1,, W a 1 NCWarks Career C � t — .�``` ; BB&T9 t tt ,- North Carolina �� t Veterans Park r 9 m y�anal � w res1ival Park rP Support -enrent Office Airborne & G Special Operations... `T' ,Nbh Sl Reger First Baptist Churc North Carolina Veterans Park Phase 11 300 Bragg Blvd. Fayetteville, NC 28301 Owner ..................................................................................................................... City of Fayetteville 121 Lannon Street Fayetteville, NC 28301 Landscape Architect ................................................................................................................ RATIO 227 Fayetteville Street, Suite 301 Raleigh, North Carolina 27601 919-821-0805 Civil Engineer / Water Resources / Environmental ..................................................................................................................... SEPI Engineering & Construction, Inc. 1 Glenwood Ave., Suite 600 Raleigh, NC 27603 Electrical Engineer ..................................................................................................................... The Wooten Company 120 North Boylan Avenue Raleigh, NC 27603 KEY PLAN SEALIDATE SHEET ISSUE 01 BID SET 09103121 02 FINAL PERMIT SET 02103122 03 NCDEQ COMMENTS 08/08/22 ARCHITECTURAL AND ENGINEERING FMT10 COPYRIGHT NOTICE: THIS DRAWING IS GIVEN IN CONFIDENCE AND SHALL BE USED ONLY PURSUANT TO THE AGREEMENT WITH RATIO. NO OTHER USE, DISSEMINATION OR DUPLICATION MAY BE MADE WITHOUT PRIOR WRITTEN CONSENT OF RATIO. ALL COMMON LAW RIGHTS OF COPYRIGHT AND OTHERWISE ARE HEREBY SPECIFICALLY RESERVED. PROJECT NO. 19097.000 SHEET TITLE GENERAL PROJECT NOTES SHEET NUMBER G-001