Loading...
HomeMy WebLinkAbout20141069 Ver 1_401 Application_20141014Anowsp 15401 Weston Parkway, Suite 100 Cary, NC 27513 T: 919.678.0035 PAD F: 919.678.0206 P A www.wspgroui).com TO: DWQ Unit 512 North Salisbury Street Raleigh, 27604 LETTER OF TRANSMITTAL DATE October 6, 2014 1013 NO. 11320012.030 PROPOSAL NO. ATTN: Resubmit RE: 401 Permit Submittal 10/06/14 Approved as noted Agent Authorization Form 5 10/06/14 Draft PCN 5 V 1 4, U b 1j WE ARE SENDING YOU [x Attached n Via FedEx the following items: [ I Via Mail Shop Drawings Prints Plans Samples Specifications Copy of Letter Change Order Photographs Control Photographs Contact Prints Manuscripts Diskettes Diapositives x See Below COPIES DATE NO, DESCRIPTION 5 10/06/14 Resubmit DWO Cover Letter 5 10/06/14 Approved as noted Agent Authorization Form 5 10/06/14 Draft PCN 5 10/06/14 Return Supporting Documentation (Appendices A, B, C, & D) 2 10/06/14 For your records Full Size Construction Plans 3 10/06/14 Analytical aerial triangulation required 11 X 17 Construction Plans For review and comment THESE ARE TRANSMITTED as checked below: For approval Approved as submitted Resubmit For your use Approved as noted Submit As requested Return for corrections Return x For review and comment For your records Control survey required Analytical aerial triangulation required See below remarks For review and comment copies for approval copies for distribution corrected prints ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Please contact me with any questions. Thank you! COPY TO: file SIGNED: PE, 'CFM �wsr October 1, 2014 Karen Higgins NCDWQ 1617 Mail Services Center Raleigh, NC 27699 -1617 RE: PCN Application Package for 85 If of Stream Impacts & 1990 sf of Buffer Impacts for Maram Court Bank Stabilization The City of Raleigh Public Works Department, Stormwater Management Division Wake County, North Carolina Dear Ms. Higgins; 15401 Weston Parkway Suite 100 Cary, NC 27513 Main: 919 678 0035 www. ws pg r o u p. corn/ u s a The project consists of removing a timber retaining wall and restoring the right bank at the property located at 5612 Maram Court. The project is on private property but the work will be done by the City of Raleigh Public Works Department, Stormwater Management Division as a part of the City's Stormwater Drainage Cost Share Program. This program is a "drainage assistance program to provide cost - sharing assistance for engineering design and construction of the improvements" on private property. In addition, "the property owner must be willing to provide the necessary easements to construct the improvements and share in the cost of the repairs ". The property owner at the listed address is a participant in the Stormwater Drainage Cost Share Program for the above listed project. The existing timber retaining wall located on the right stream bank of an UT to Hog Pen Branch is heaving forward and is in need of removal. To restore the bank being retained by the wall to a natural channel bank, this project will remove the retaining wall and slope the right bank back at a slope of 2(H):1(V). The newly constructed channel back/slope will be stabilized after construction utilizing temporary matting and live stakes. Disturbed areas, due to construction access, within the steam buffers will be reseeded at the completion of the project. The project will permanently impact the UT stream and surrounding Neuse River Buffer. The project will create 85 If of permanent stream impacts and 1990 sf of buffer impacts (1730 Zone 1 and 260 Zone 2). Permanent stream impacts are for riprap stabilization in the stream. The buffer consists of the back yard of 5612 Maram Court with the majority of the buffer covered with grass and a few trees. No wetlands are present. It is WSP's pleasure to submit this PCN application package on behalf of the City of Raleigh. Please feel free to contact me at (919) 678 -0035 or dale.hyatt @wspgroul).com if you have any questions or comments. Sincerely, Dale Hy t, PE, CF L: \Transportation \Projects \1320012 Raleigh Drainage Petition OnCall \03 Maram Court\40 - Permit \Forms and Letters \Cover Letter DWQ.docx AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: OWNER:_ Kathleen Hughes PIN: 1706870230 Deed Book, Page No: 10761, 2533 STREET ADDRESS: 5612 Mararn Court Raleigh, NC 27609 The prolect is on private pproperly with the owners listed above, but the work w0l be done by thetty of Raleigh Public-Works Depaa�tment Storrnwater Management Division as a part -of the Ci -s StorrviWit'er Drainage Cost Share Program. The City of,Raleigh is the applicant. Please print:, � Applicant: City -of Raleigh Public Works Department Stormwa ter Management Division The undersigned, applicant of'the above noted property, do hereby authorize Dale Hyatt, PE, CFM , of WSP '(Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Applicant.Address: Carl Dawson Public Works Director PO Box 590 Raleigh, ;NC 27602 -0590 Telephone: 919= 996=3030 We hereby certify theabove, information submitted'in this application is,true and, accurate to the best of our knowledge. Auiho ed 91griature Date: _ I j�0'_ WAT� O� q(G o lqiii� -c Office Use Only: Corps action ID no. DWO project no. Form Version 1.3 Dec 10 2008 Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Maram Court Bank Stabilization 2b. County: Wake rza 2c. Nearest municipality / town: Raleigh 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: iL 3. Owner Information 401 & SUFFER p ESOURcEs 3a. Name(s) on Recorded Deed: Kathleen Ann Hughes 3b. Deed Book and Page No. Deed Book: 010761 Page No: 02533 3c. Responsible Party (for LLC if applicable): City of Raleigh Public Works Department, Stormwater Management Division 3d. Street address: 5612 Maram Court 3e. City, state, zip: Raleigh, NC 27609 -3870 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent' ® Other, specify City of Raleigh Public Works Department 4b Name Susan Payne Lockleae, PE, CFM 4c Business name (if applicable) City of Raleigh Public,Works Department, ,Stormwater Management, Division 4d Street address PO Box�590 4e City, state, ,zip Raleigh, NC 27602 -0590 4f Telephone no - 919- 996 -351`6 4g Fax no.. 919 - 996 -7633 4h Email address susan locklear@ raleighnc gov 5. Agent/Consultant Information (if applicable) 5a Name - Dale Hyatt; PE, CFM 5b Business name (if applicable) WSP 5c Str"eet address 15401 Weston Parkway, Suite 100 5d City, state, zip Cary, NC '27513 5e Telephone no 919 - 678 -0035 5f Fax no 5g Email address dale hyatt@wspgroup com Page 2 of 12 B. Project Information and Prior Project,History 1. Property Identification 1 -a Property identification no (tax PIN or parcel ID) 17068870230 lb Site coordinates (in decimal degrees) Latitude 35857444 Longitude - 78 635442 (DD DDDDDD) ( -DD DDDDDD) 1c Property size 0 32 acres 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to proposed UT to Hog Pen Branch project 2b Water Quality Classification of nearest receiving water B, NSW 2c River basin map is available at Neuse http Hh2o enr state nc us /adman /maps/ 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The area is residential housing within the City of Raleigh limits A perennial stream runs North to South at the rear of the property , A wood retaining wall parallels the stream creating the right bank of the stream This retaining wall has begun to heave forward and is in danger of collapsing There.are a few trees within the buffer along the stream but the buffer within this property is primarily grass There are three, (3) trees in the buffer within the limits of disturbance for this project All three trees within the buffer and limits of disturbance ,wdl'be removed 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of,all existing streams (intermittent and perennial) on the property 95 linear feet 3d Explain the purpose of the proposed project T,here'is an existing wood retaining Wall that creates the right bank of the subject stream This retaining wall has begun to heave forward and is in jeopardy of collapsing This project will remove the fading retaining wall and restore the right overbank to4a more natural slope and provide temporary and permanent stabilization for the bank The retaining wall and stream are on private property but the project is part.of the City of Raleigh Stormwater!Drainage CosfShare Program This will be a City of Raleigh project 3e Describe the overall project in detail, including the type of equipment to be used Project will consist of removal of the existing wood retaining wall and restoration of the right bank of the stream Mini - excavators,and skid steers will be utilized to remove the•existing wood retaining wall and for the re- construction of the right bank Various hand,tools will be utilized for bank - stabilization and installation of plantings Page 3 of 12 PCN Form — Version 1.3 December• 10, 2008 Version 4. Jurisdictional Determinations 4a Have'junsdictional wetland or stream determinations by the Corps or State been requested or,obtained for this property / El Yes ❑ No ®Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional °determination, what type of [:1 Preliminary El Final determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name ,(if known) , Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permit&of certifications been requested or obtained for ❑ Yes ❑ No ® Unknown this project,(mcluding all prior phases) in the past? 515 If yes, explain in detail according'to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1,a Which sections were,completed below for yourprolect (check all, that apply)- ET' etlands ® Streams - tributaries Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are,wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) (if known) DWQ — non -404, other) (acres) or Temporary T W1 ❑ P ❑ T El Yes E:1 Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑P ❑T El Yes [-I Corps El No E] DWQ W5 ❑ P ❑ T El Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ' 2g. Total wetland impacts 2h Comments ~ 3. Stream Impacts -If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 39 Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) intermittent DWQ — non -404, width (linear or Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑'T Bank UT to Hog Pen ®, PER ® Corps 8 85 Stabilization /Restoration B_ ranch ❑ INT [:1 DWQ S2 ❑ P ❑`T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑`T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑, Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWO 3h Total stream,and tributary impacts 85 31 Comments Page 5 of 12 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water im acts,,below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑ PEI T 02 ❑P ❑T 03 ❑P ❑T 04 ❑ PEI T 0. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, then com lete the,chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c, Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction Page 6 of 12, ,6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ® Neuse ❑ Tar - Pamlico ❑ Other Project is in which protected basin? ❑ Catawba '❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T, Removal B1 ❑ P ®T of fading retaining UT to Hog Pen Branch Yes ® No 1730 260 wall B2 ❑ P ❑T ❑ Yes ❑ No B3 ❑ P ❑ T ❑ Yes ❑ No 6h Total buffer impacts 1730 260 61 Comments Buffer is primarily grassed Impacts to the buffer will be for access to remove the wood retaining wall Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and'Minimization 1a Specifically describe measures taken to,avoid or minimize the proposedj impacts in designing project The impacts,were minimized to the maximum extent possible The hmits,of disturbance was minimized to that required to allow room for construction equipment b Specifically describe measures taken to avoid or minimize the proposed impacts1hrough construction techniques Construction equipment will be limited to the limits of disturbance shown on the drawings This limit is the minimum required for retaining wall removal and bank stabilization The equipment will only be allowed on the property where work is being done and only within the limits of disturbance Additionally, small equipment will be ubhzed'to minimize impacts to the back yard 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by'(check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this projects ❑ Mitigation bank - El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a� Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation,'stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested- acres 4f Non= npanan wetland mitigation requested. acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules)— required by DWO 6a Will the project result in an impact'withih a protected riparian ' buffer that regwres buffer - mitigation? If yes, you will have to fill out this entire form — ,please contact the State for more information El Yes ® No 6b If yes, then identify the square feet of impact to, each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer' mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to� private mitigation bank, permittee responsible riparian buffer restoration, payment'into an approved in -lieu fee fund) 6h Comments ` Page 9 of 12 E. ,Stormwater Management and Diffuse Flow Plan ,(regyired by DWO) 1. 'Diffuse Flow Plan, la Does the project include or is'it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why Comments Diffused flow is not required on this project 'It is replacement of a faded ❑ Yes ® No stormwater,pipmg network 2. Stormwater,Mana ement Plan 2a, What is,the overall percent impenriousness,of this project? N/A 2b Does this project;requi�e a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Project is °only for removal of a retaining wall 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWO Stormwater Program ` ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? ❑ Phase II '3b Which of the following locally - implemented stormwater management programs El apply (check all that apply) El USMP El ❑ Water SupplyWatershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWO Stormwater Pro ram,Review ❑ Coastal counties ❑ HQW 4a Which of'the following state - implemented stormwater management programs apply ❑ ORW (check,all that ^apply) ❑ Session Law 2006 -246 ❑ Other 4b Has,the approved Stormwater Management Plan with proof ofiapproval been attached? El Yes ❑ No 5. DWO 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or,the M Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of`the National or'State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you,answered "yes" to the above, has the document review been,fmalized by the - State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter`) ❑ Yes ❑ No Comments 2: Violations (DWQ Requirement) 2a Is the site in violation of DWQ Weiland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (1'5A NCAC 2H 1300), DWQ Surface Water or'Wetland Standards, ❑ Yes' ® No or Riparian Buffer Rules (15A NCAC 2B 0200)'? 2b Is•this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality 3b If you answered "yes "'to the above, subrriit.a.quahtative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative•descnption 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available, capacity of 'the subject facility N/A Page 11 of 12 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federal ly,protected,species,or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? E:1 Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a Will this,project occur in or near an area,designated as essential fish habitat? ❑ Yes ® No r- 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or'Prehistoric,Cultural Resources (Corps Requirement) 7a -Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or °cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history,and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood;Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the'floodplain determination? FIRM Panel No 37201,70600J (effective date May 2, 2006) Dale Hyatt, PE, CFM October 1, 2014 Applicant/Agent's Printed Name Date A Ic gent's Signature (Agent's signature is valid if an authorization letter from the applicant is provided Page 12 of 12 3� c z ° 350 North Village on the Green Haven } I� / ( _ WESTBROOK'DR LAKE PAR K DR 350 \,OW Sl Northclift <y� Eden (/ p en en Forest U 2 o j NORT,yc! FT KILLINGTOy3 Six 0G R �$`'Z S t �e k i 1 ~ Forks nlxoNO 9p�'tC . op V b - �,! Brandermill w �`1PFSr Village qo Gate -x 0!? Fairfax` 350 —� O H111S - --300' Shelley f = Oft LN \ R o SEHAVEN Gake TEMPLE ST• - °Q, C NJ'. 8 ' cot Z _ MARAM COURT -k,�r ti C j /,Vs DR PROJECT SITE MBLfs o BELSA� /1 M W/NDfL:DR p YORKGATE DR ` �- - Searsditlel CRESTVI RD E M/LLBROOK RD orkshir. e ,ti j oe _ Ch ut ; S/VELL- Y RD / Downs e��� �� ` Hills \ CRANB As ey DuKeDR LP xF a M�,yE ° Park 1j`��S�p21 PURDUE S JH DR Q yES� N GLEN DF. _ North len - o FRENCH O GUNNISON PL g n STANNARD TRL m k- DR pINECROErOR �o m � IELD FOXHAL'L ST O NORTHF Lakemont x ° 00 K /MBERt A l WESTRIDGE DR y Briarcllif WYSONG CT 0 = 1O Hickory Hills r 2 z �HBROOK__ OR Q OSnO IT -� p� oA SMALL CT - _ .. - G Woodbury Village ����` /o'� t p cv g �� O ROWAN ST F2ir1'ior MP�HRD �.. HILLOCK DR o� o;� c�`�, Hills ORTE aQ O 2 -Royal Hills ��P ! y j .North. �o_ 2 Hills p , C PO . Rr09 Y CATAWBA ST " _� /C..`` `:�P. '-14 , T � Q CURR /TUCN OR, North Hills Terrace P� / ES-fONE DR w + BEN AT NALLS ST \C N _ AL RAN S D R RAM13LEWOOD DR 1 � 40� Lakestone 5 a COMBS F Be ew COMPUTER D l' Beckana ° `p BON v \ �A N MANUEL STOP fORSY1N 51 _� g Terrace igROWNING PL 0� � o°c IQ ° ° Williamsborou h °� a�`" Count � -` DSO � � e► Country g. W W Westchester acAM� Club Hills / HERT£0*0 0 - BLENHEIM OR PASQLIOTANK DR _ TR'��'Sy�Vq J �.. cc Q' .. - �4��� O pNUIMANS DR , . APPENDIX A: O%WSp US TOPOGRAPHIC MAP 15401 Weston Parkway 2000 0 1000 2000 m? Suite 100, Cary, NC 27513 I I I I $ 9 F -0891 1 inch = 2000 ft. m= � yr ;� :.�. �!- ``•`-`� - mil`: � %/�� � .- � '`��f° • P r � `{ R ''fir %� ti�i �� t � �� r\ ��.\ f.�� t I^ \1 _ �r MARAM COURT PROJECT SITE VY t � l (JML ..v.� Ix �� �� r� �i'•• t^ Orr r� . -,��•i a / „cam V / Y Lid k . �• *� is . � ,� 4 r r S V - i S , �' Ja /� ' * _ ✓� { in K.&IM loll lIf* at Y �1 r a,r J.O tr1 1(1 N 3 100 ru)z � 8 �`O a o 6 PE • o 0 aaw 1 1 / i Dl „8 K w W w Z a 0- E V"V), N 0C-Uh oa ° a a w U N m< Via Om mt w' 7'1,0 OZ rnm� 3oaa� o 0 �z _ Z Z o O m w - - W w U,o , � =\ Z CONC JE CURE m � O , \\ \ \ \ \ #5616 \ I \ 0- \ / o / m Q r < < h\ a :1. o . 1� : —W NE -19 4eBieH M ZLL BuIPIIeEI IedplueW 481geN 461a1ea bo A410 ON '46101eb l�tjnoo vmidw HOIT V a Jo JllJO LL 0 � M o (U U U Q Q � Z Iti H u LLJ L'J IV M� Cu QQ W W W n 0� Z Z I— O O � O N N 1 I / i 30N3J ,NNIINIVH^ H0 ., vv,� Jdl „9l /61 I Vri UJ ,m o 5 � r/ (s) Q� J Q 3 / / .nom /d Y I r,, brmrea n sse U x a x / a METAL SHED // a �5 vlsrn 0 Nrn uJ ^6 Z I---- -- - - -- •�/ -- Qua 0 Z °w - owrn Zjm� + WF Q OW 0 Q° Z H Z 4 p200 N� + f F + '° 0 30 W�u'OJ o° -0 g r_= °wwz e e / O � IQ w z o pa X ^� 0 0 ZOOM e,, * >a o JYI�QM g a%oo'ao WE e I d” `c e e as pwaa� Q I r,, brmrea n sse U x a x / a METAL SHED // a �5 vlsrn 0 Nrn uJ ^6 Z I---- -- - - -- •�/ -- a V FJO W Q �3 U Z w O m JQm Mal W Q O j W � U ° a r za"o V) <rn X Z w Q Nm Q O Z x Q O a Qua 0 Z °w - owrn a V FJO W Q �3 U Z w O m JQm Mal W Q O j W � U ° a r za"o V) <rn X Z w Q Nm Q O Z x Q O a as O -Q N Q e,,_- z OpJmmz zq,o a �i J 0 Zjm� + WF Q OW 0 Q° Z H Z 4 p200 N� + f F + '° 0 30 W�u'OJ o° -0 r_= °wwz e e O � IQ w z o ^� 0 0 ZOOM e,, a JYI�QM e a%oo'ao e I d” e e pwaa� Q a O'd O =0OmiO Q��^ e e zNOma 1 e I w I ®� I o am , - oee - - - -- °m o -- - - -- -- o e0 m, I zQ °m� Y I / \\ e e 0 I a 1___393 e 5608 -- e � iT - -- #5612 —L — as O -Q N Q e,,_- z OpJmmz zq,o a �i J