Loading...
HomeMy WebLinkAbout20211041 Ver 1_Modifications_20220919Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 1 20211041 Is this project a public transportation project?* Yes No Is this a DOT Yes No project?* Reviewer List: * Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office - (336) 776-9800 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 6/25/2021 Project Contact Information Name: Kevin Hining NCDOT Div 11 Who is submitting the information? Email Address: kjhining@ncdot.gov Project Information Existing ID #: Existing Version: 20211041 1 20170001(no dashes) 1 Project Name: Ashe Bridge 273 replacement Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown TIP#: WBS#: 17BP.11.R.145 (Applies to DOT projects only) County (ies) Ashe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 401 permit Bridge 273—Ashe Co.docx.pdf 667.96KB 404 permit Bridge 273 Ashe Co.pdf 172.64KB PCN for Bridge 273, Ashe Co.pdf 105.19KB Ashe 273 PCN letter.pdf 173.25KB Only pdf or kmz files are accepted. Describe the attachments or comments: Permits for the project were obtained September 2021, but expired March 2022. The project will likely not finish until a few weeks after the end of the grandfather year (March 2023). As a result, requesting a reissuance to allow more time to complete. No changes to the proposed plans or proposed impacts, and everything in the PCN is still accurate. An email has been sent to USACE to containing Sec 106 and Sec 7 information. Upon review, please let me know if additional information is needed. Thank you! Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically.