Loading...
HomeMy WebLinkAboutNCC216275_NOT Closeout Documents_20220916Consulting Engineers GEQSCIENCE MEMORANDUM GROUP TO: Galen Heying Shelco, LLC FROM: Kevin Caldwell, P.E. Geoscience Group, Inc. REFERENCE: BONA Expansion Erosion Control Closeout DATE: September 1 b, 2022 As requested, we visited the site on September 14, 2022, to assess the level of stabilization of the disturbed areas. As you can see in the following photographs, the majority of the site is stabilized. Photograph 1 500 Clanton Road Charlotte. North Carolina Telephone Facsimile NC License Suite K 28217 704.525 2003 704.525 2051 F-0585 Mr. Galen Heying September 16, 2022 Page 2 of 4 Photograph Photograph Mr. Galen Heying September 16, 2022 Page 3 of 4 Photograph 4 Photograph 5 GEQSCCENCE GROUP Mr. Galen Heying September 16, 2022 Page 4 of 4 Photograph 6 Please let me know if you have any questions. Consulting Engineers