HomeMy WebLinkAboutNCC216275_NOT Closeout Documents_20220916Consulting Engineers
GEQSCIENCE MEMORANDUM
GROUP
TO: Galen Heying
Shelco, LLC
FROM: Kevin Caldwell, P.E.
Geoscience Group, Inc.
REFERENCE: BONA Expansion
Erosion Control Closeout
DATE: September 1 b, 2022
As requested, we visited the site on September 14, 2022, to assess the level of stabilization
of the disturbed areas. As you can see in the following photographs, the majority of the site
is stabilized.
Photograph 1
500 Clanton Road Charlotte. North Carolina Telephone Facsimile NC License
Suite K 28217 704.525 2003 704.525 2051 F-0585
Mr. Galen Heying
September 16, 2022
Page 2 of 4
Photograph
Photograph
Mr. Galen Heying
September 16, 2022
Page 3 of 4
Photograph 4
Photograph 5
GEQSCCENCE
GROUP
Mr. Galen Heying
September 16, 2022
Page 4 of 4
Photograph 6
Please let me know if you have any questions.
Consulting Engineers