Plans Prepared By: CAD Pile Path:
Vidya Mohandas, EI (L: Transportation /Projects /1320012 Raleigh...)
Storm Water Manager DATE
RECOMMENDED
CONSTRUCTION FOR
T it:�-`V.N IL MC ARLi �T E
MAY%jR
Plan View .................
n
r�
�cz�
W
SHEET OF
1 8
,! f
W
SHEET OF
1 8
n
n
0
0
o�
C
0
i
1.
0
0
:v
h
s
m
U
2
a-
* i
�I
a
GENERAL NOTES:
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF RALEIGH STORMWATER DESIGN MANUAL, PUBLIC
UTILITY HANDBOOK, AND CITY OF RALEIGH STANDARD DETAILS. UNLESS OTHERWISE NOTED.
2. CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST OSHA STANDARDS FOR EXCAVATION
AND TRENCHING PROCEDURES. CONTRACTOR USE SUPPORT SYSTEMS, SLOPING, BENCHING ETC. AS NECESSARY
FOR THESE OPERATIONS AND SHALL COMPLY WITH ALL OSHA PERFORMANCE CRITERIA.
3. CONTRACTOR IS RESPONSIBLE FOR CONTACTING NORTH CAROLINA "ONE CALL" CENTER AT 1 -800- 632 -4949 FROM
ANYWHERE IN THE CONTINENTAL UNITED STATES, OR 811 FROM WITHIN THE STATE OF NORTH CAROLINA.
CONTRACTOR SHALL WAIT 48 HOURS WHILE UTILITIES LOCATE AND MARK THEIR UNDERGROUND FACILITIES.
NOTIFICATION SHOULD BE NO LESS THAN 2, BUT NO MORE THAN 10, WORKING DAYS BEFORE COMMENCING
EXCAVATION. THE MARKINGS ARE VALID FOR 15 WORKING DAYS FROM THE DATE OF THE CALL TO THE
NOTIFICATION CENTER.
4. CONTRACTOR SHALL PERFORM ALL NECESSARY SUBSURFACE UTILITY INVESTIGATIONS PRIOR TO COMMENCING
CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING CONDITIONS,
OBSTRUCTION, AND UTILITIES WHICH MAY AFFECT PROPOSED WORK.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONTINUITY OF ALL UTILITIES DURING CONSTRUCTION.
6. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SAFE INGRESS AND EGRESS FROM SITE FOR ALL VEHICLES,
INCLUDING BUT NOT LIMITED TO, TRAFFIC ON ADJACENT PUBLIC ROADS AFFECTED BY CONSTRUCTION TRAFFIC.
7. CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH ALL REGULATIONS GOVERNING THE DEMOLITION,
REMOVAL, TRANSPORTATION AND DISPOSAL OF ALL DEMOLITION DEBRIS.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTING CONDITIONS OF ALL EXISTING APPURTENANCES
(FENCING, DECKING, PAVERS, DRIVEWAYS, ETC.) THAT MAY REQUIRE REMOVAL AND RESETTING AS A RESULT OF
THIS PROJECT.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO APPURTENANCES (FENCING, DRIVEWAYS, ETC.)
DURING REMOVAL, STOCKPILING AND RESETTING OF THESE APPURTENANCES. CONTRACTOR SHALL BE
RESPONSIBLE FOR REPLACING ANY DAMAGED APPURTENANCES.
10. CONTRACTOR SHALL UTILIZE, TO THE MAXIMUM EXTENT PRACTICAL, LIGHTWEIGHT EQUIPMENT
(MINI- EXCAVATOR(S), SKID STEER(S), ETC.) TO PERFORM CONSTRUCTION ACTIVITIES IN ORDER TO MINIMIZE
DISTURBANCE TO LAWNS AND LANDSCAPING.
11. THE INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL OCCUR PRIOR TO ANY AND ALL
ACTIVITIES RELATED TO STREAM RESTORATION.
12. LOCATION OF SUB - SURFACE UTILITIES, WHETHER PUBLIC OR PRIVATE, IS BASED UPON FILED LOCATION OF VISIBLE
APPURTENANCES AND IS APPROXIMATE ONLY. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATION
PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION.
13. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL NOTIFY OWNER IF ANY DISCREPANCIES EXIST PRIOR TO CONSTRUCTION.
14. ALL GRADED AREAS SHALL BE SLOPED SUCH THAT NO AREAS OF STANDING WATER OCCUR AND ALL AREAS
POSITIVELY DRAIN TO STREAMS OR SWALES.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL LAND DISTURBED BY CONTRACTOR TO ITS ORIGINAL
GRADE AND LOCATION UNLESS NOTED OTHERWISE.
16. TOTAL PROJECT DISTURBED AREA = 3508 SF.
1. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF RALEIGH STANDARD
DETAILS AND NCDO.T GUIDELINES.
2. ALL CONSTRUCTION ACTIVITIES MUST TAKE PLACE WITH THE LIMITS OF DISTURBANCE, INGRESS /EGRESS
EASEMENTS, OR TEMPORARY CONSTRUCTION EASEMENTS ONLY. ACTIVITIES OUTSIDE OF THESE SPECIFIC AREAS ARE
STRICTLY PROHIBITED.
3. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE CONSTRUCTION SITE IN A SAFE AND ORDERLY CONDITION
AND ADHERING TO THE EROSION CONTROL PLAN AS SET FORTH HEREIN. DEVIATION FROM THE EROSION CONTROL
PLAN IS NOT ALLOWED WITHOUT PRIOR WRITTEN APPROVAL FROM THE DESIGNER.
4. CONTRACTOR IS RESPONSIBLE FOR REGULAR INSPECTION AND MAINTENANCE OF ALL EROSION CONTROL
MEASURES. ALL MEASURES SHALL BE INSPECTED IMMEDIATELY FOLLOWING ANY MEASURABLE STORM EVENT.
MAINTENANCE AND REPAIRS REQUIRED SHALL,OCCUR AS SOON AS FEASIBLE.
5. CONTRACTOR IS RESPONSIBLE FOR MONITORING WEATHER CONDITIONS, AND FOR TAKING PREVENTATIVE ACTION
AS NECESSARY TO :STABILIZE THE CONSTRUCTION SITE PRIOR TO FORECASTED /FORSEEABLE STORM EVENTS.
6. CONTRACTOR TO MIINIMIZE TRACKING EQUIPMENT AND ASSOCIATED SEDIMENT /DEBRIS FROM THE CONSTRUCTION
SITE ONTO THE PUBLIC RIGHT OF WAY. IF EXCESSIVE SEDIMENT /DEBRIS IS OBSERVED ON THE PUBLIC RIGHT OF
WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING AND MAINTAINING A TEMPORARY GRAVEL
CONSTRUCTION ENTRANCE
7. IF IT IS DETERMINED DURING CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE, DESPITE PROPER
IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL MEASURES, THE CONTRACTOR IS OBLIGATED TO
TAKE ADDITIONAL CORRECTIVE ACTION. CONTACT THE CITY OF RALEIGH AND THE ENGINEER WITH ANY ADDITIONAL
MEASURES.
8. TEMPORARY PUMP- AROUND BASEFLOW DURING CONSTRUCTION. ALL BANK STABILIZATION SHALL BE PREFORMED
IN THE DRY. WORK AREAS SHALL BE STABILIZED AT THE END OF THE DAY.
9. CONTRACTOR SHALL ESTABLISH GROUND COVER ON DISTURBED AREAS OUTSIDE OF STREAM BANKS WITHIN 14
CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY.
10. CONTRACTOR TO VERIFY LOCATION AND DEPTH OF EXISTING UTILITIES TO AVOID CONFLICT DURING INSTALLATION
OF EROSION CONTROL MEASURES. CONTRACTOR TO CALL 1- 800 - 632 -4949 FOR "NC ONE CALL" TO HAVE EXISTING
UTILITIES LOCATED'.,
11. INSTALL TEMPORARY SILT FENCING AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL
THESE DEVICES.
12. REMOVE TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES ONCE SITE IS FULLY STABLE. CONTACT THE
CITY OF RALEIGH AND THE ENGINEER FOR SITE WALK- THROUGH PRIOR TO REMOVING ANY TEMPORARY SEDIMENT
AND EROSION CONTROL DEVICES.
CONSTRUCTION SEQUENCE:
1. OBTAIN REQUIRED PERMITS INCLUDING BUT NOT LIMITED TO USACE 404, DWQ 401, BUFFER AUTHORIZATION, ETC.
PRIOR TO ANY WORK PERFORMED ON SITE.
2. CONTRACTOR TO :SCHEDULE PRE - CONSTRUCTION CONFERENCE WITH THE CITY OF RALEIGH AND THE ENGINEER
PRIOR TO STARTING WORK.
3. INSTALL SILT FENCE AND OTHER MEASURES AS SHOWN ON THE APPROVED PLANS. CLEAR ONLY AS NECESSARY TO
INSTALL THESE DEVICES.
4. CALL FOR ONSITE INSPECTION BY CITY OF RALEIGH AND THE ENGINEER.
5. BEGIN CLEARING, GRUBBING, AND TREE REMOVAL.
6. ESTABLISH GROUIND COVER ON DISTURBED AREAS WITHIN 14 DAYS OF INACTIVITY.
7. BEGIN DILAPIDATED WALL DEMOLITION /REMOVAL. CONTRACTOR TO REMOVE WALL IN A MANNER THAT DOES NOT
DISTURB STREAM CHANNEL
8. BEGIN BANK STABIILIZATION CONSTRUCTION STARTING UPSTREAM AND PROCEEDING DOWNSTREAM.
9. UTILIZE TEMPORARY STREAM DIVERSION TO ENSURE WORK AREA IS ISOLATED FROM STREAM BASE FLOW. ONLY
PERFORM BANK STABILIZATION WORK IN THE DRY.
10. STABILIZE WORK AREA AT THE END OF EACH DAY.
11. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS STABILIZED CALL FOR INSPECTION BY CITY OF RALEIGH AND
THE ENGINEER.
12. IF SITE IS APPROVED REMOVE TEMPORARY EROSION CONTROL MEASURES AND SEED OUT ANY RESULTING BARE
AREAS.
13. CALL FOR FINAL SITE INSPECTION BY THE CITY OF RALEIGH AND THE ENGINEER.
SS
LEGEND
#1700 ADDRESS
X- - -SECT CROSS SECTIOI'I
Cl A CROSS SECTIO:I\J STAKE
FFE FINISHED FLOOR ELEVATION
iPF IRON PIPE FOUND
[B] LOT NUMBER
MAILBOX
- PROPERTY LINE (NOT SURVEYED)
Os SANITARY SEWER MANHOLE
SANITARY SEVvER LINE
X875.5 SPOT ELEVATION
SSMH SANITARY SEV>iER MANHOLE
I -BM TEMPORARY BENCHMARK
TC TERRA COTTA
CONSTRUCTION ENTRANCE
u
0
0
a
0
c�
a
ggqqIl ®8$4 @S$f J�yeyp$�
?�4 *„ C A ray+ j '�✓ '.
r" via J•' dTo°s
NC License # E - 0891
o
o
e� m M
�C
•U �
O®\ M CC
cc N .
N
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
•
l
PROJECT #: SM 2014 -XXXX DATE: 08 -25 -2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
GENERAL
NOTES
SHEET
OF 8
o
o
e� m M
�C
•U �
O®\ M CC
cc N .
N
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #: SM 2014 -XXXX DATE: 08 -25 -2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
GENERAL
NOTES
SHEET
OF 8
r
0
0
t
0
in
E
c)
0 =) I
N
n
A r-
N A
,it
Iv I VI A � 41
i22
NOW R FORMERLY
BRIAN JO!'-,IATHAN SPANNER
CC
JORDAN McCOY SPANNER
DB 101`44, PG. 1076
BM 1, ` ",80, PG. 484
l \ ` \
PIN: 170687-0239
N
Cp
u
(5) 380
— AD,J-1,
0
ONE s-ro�,'_' Y WOOD n
50' 11RADILI!5, 40' PUDLIC FIW) FRAME !,JIOUSE Ci-) Ej
V
—7—
0
3
A, U
AI
...........
0
4010
-7—
0_ T-1
-----------
>
777
x J� #7 E S
N NoTE
3
— R (SE
77-
pU' BUFFE 2
...... :., 1 Y-S
-7
ET)
SHE
0
TH�S
A
14 aj
D AREA
LANDSCAPE
A
0H B W 0 0
B
14 >
")GOA; /
V I I IMBER RLANTER
3/4" IPF
lq
< s f r t t f < , _�L � ,t - t � � .'f ' i �s � � r f ` � � j � { { £ f
C)
El
j <' 2'F S I-
Llj
j E t A \4
2 Lyo I J�
T DRIVIf'.,- -o
4.
4 C 0 N RE 'E'
j
4
t
4
L11
_° ... . ........
0-
U-3 in
g,
tj
,2
o CD T(.')P\OF WALL
7-
'DII TIMBER WAI-Jr-
4' C
L 0 TO CREEK
IS
I ING' IN
.. ..... I .... K
'J11
`Q R" L L
a,
5,&,, BLOCK
HOU
01 E' ',
J
1 STORY WOOD
7
FRAME HOUSE
WOOD DECK
TO REMAIN S WIN1111
- - - - ----------------
_'f_JjfP- `,79,�211'\j
1,11NI: \3711.81'
NOTE: ROOF DRAINS 1j,
Ok! REAR -'F HOUSE P' 11-11 306&91'
NOW OR 'FORMER;
'u GO UNDER ROUND -1-0 Z-�
KATHLEEN ANN H U (3/ 1 1 E S rl
TION
UNKNOWN
DB 10761,
G. 2533
4-4
BM 1980, PG. 481,44- 10
PIN: 1706-87---0230
40 11j i Lo
0
X—SECT
4
/f-D14CE
,I)ILAP&
x
/jo
j X-
7 f
C ri
L-7
3/4" 1PF
6,1
4
C 0 N C R TE 1 1
GENERAL SURVEY NOTES SIDEWALK
2 0 1 "1 STATE PLANE C(DOIF1011 ATES, VERTICAI
1 BASIS OF BEARINGS: NC GS GRID, NAD8 7' 1
4
1-LIM NAVD88.
IT
124
DA
2. THE PROPERTY 'LINES AND RIGHTS—OF—WAY '_�HOWN HEREON ARE BASED ON AN OVERAI L NOW OR FORMERLY 001
COMPILATION OF RECORD DOCUMENTS SUPPC-7TED BY THE LOCATION OF PROPERTY
'T
CORNERS FOUND DURING THE COURSE OF SURVEY. LINES NOT SURVEYED ARE SHOWN SARAH JANE MARKS Ap'PROXI MATE EXISTING VAR ABLE" WID H DRAINAGE
N n 'C', A
-j IT' T
C-n r�Nl 7111 C E-A(-C7 ��r- TJIC-- 01 AT DB 4007 PG 007 "'EVIET'? EAS'_KAF11N, "c ,(Al FF))
jAj >�- VV� f- s
A, S B R Q K E I \j LINIES rm rl 17, m I IUIN F\ r, I
3. THE SUBJECT AREA IS NOT LOCATED WITHI-N FLOOD HAZAR A D /-01"EA ACCORDING TO FLOOD
INSURANCE RATE MAP 37 01 3600J, PANEL `706; DATED MAY 2. 20 06,,
(RFRIS.NC.GOV/FRIS).
4. LOCATION OF UTILITIES, WHE T HER PUBLIC OR `)RIVATE, IS BASED UPON FIELD LOCATION 01
E
D BY T[IE OWNERS' OF
VISIBLE APPURTENANCES IN CONJUNCTION WI INFORMATION PR,
TO
SAID UTh ITIES AND IS APPROXIMATE ONLY. 1""' IS 'I'IdIE CON TRA(311'011�"S R I' S Pl_,` N t) 1131 L I Y
VERIFY LOCATION PRIOR TO COMMENCEMENT F ANY CONSTRUC_F'1ON1, WSP CANNO--1 ASSUME
RESPONSIBILITY FOR MISIDENTIFICATION OR 011vlSSION OF UNDERG" OUND UTILITIES, DUE TO
OSHA REQUIREMENTS PERTAINING TO CONFINED SPACE 'ENTRY, PIPE SIZES, INVER]"
ELEVATIONS, ETC., WILL ONLY BE PROVIDED I F FIELD PERSONNEL ARE ABLE 10 OBTAIN
TOP OF THE STRUCTURE,
W11- BREAKING THE AN OF THE
5. PROPERTY SUBJECT TO ALL EASEMENTS AND RESTRICTIONS OF RbCORD, THIS SURVEY WAS
PREPARED WITHOUT A TITLE EXAMINATION. A NORTH CAROLINA LK""ENSED
N
ATTORNEY-- AIF—LAW SHOU! D BE CONSULTED -EGARDING kra'ORRECT OWNERSHIP, WID-11"i, Ai D
LOCATION OF EASEMENTS AND OTHER I TLF _�UESTIONS REVEAI fD BY TITLE EXAMINATION.
6. INFORMATION SHOWN HEREON IS BASED ON F,ELD SURVEYS BY WSI` ON IJUNE 17, 2014.
F BANK. BUF-TER"
-7, '50' BUFFER SHOWN HEREON IS MEASURED E VEGETATIVE FOP O�'_
SHOYINN HEREON ARE PRELIMINARY AND IFIAVE NOT BEEN REVISED OR APPROVED
BM '19-80, PG. 484
PIN: 1706-87-0132
BM 19-76, P". 507; BM 1980, PG, 484
CPJ
QAJ
NOW OF FOR MER L Y
C, H T
KRACH'T
IPkG'. 2 4
-28
B M 1980, PG� 8 15
PIN: 1 t"I'l-87-1267
CONTRACTOR TO REMOVE DILAPIDATED
FENCE AS NEEDED FOR CONSTRUCTION
REMOVE TREES (TYP)
OWNER TO REMOVE DOG
HOUSE PRIOR TO START
OF PROJECT
REMOVE TIMBER WALL
CONTRACTOR TO REMOVE
TIMBER WALL WITHOUT
DISTURBING STREAM CHANNEL
cp
t.
i.
. ............. .
1128
............ . ..................... ..
NOW OR FORM_RL`,,/
SURVEYED
CROSS SECTIONS ROBERT F. OR E C30 R Y &
�_RRY
COEEN W. CASTLEBI_
(TYP) R
D B 4 3 8 6, P G. 499
BM 1980, PG, 48,111-
PIN: 1706---87-4'?C)09
CONTRACTOR TO REMOVE DILAPIDATED
FENCE AS NEEDED FOR CONSTRUCTION
1
GRAPHIC SCALE
( IN FEET )
1 inch = 10 ft.
Lu
j
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
I N � W R E
y
WES! 1),
J
Z
&c INDA 0 U 1 E
K R
FD_
D B 1 219 1" G
6 6
0
Cu
. . 3 1 -" ..
N: 7 t
Ln
_j
Ad
1
GRAPHIC SCALE
( IN FEET )
1 inch = 10 ft.
Lu
j
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
8
CD15 LL
000
Z
co
0
w
FD_
4—
0 j; 2)
LLI LL.
EL
x
LLJ
SHEET
OF 8
Cu
-C
>1 0)
ZD
C14
Ln
_j
Ad
N
C14
Lij
0)
0-
LL.
-90
0
LL
z
0
U)
LIJ
(L
w
0
0:
0-
0
z
LLI
0
0
U-
0
uj
(1)
w
0
O
z
0
0
O
0
w
(L
!2
LLI
Co
U)
0
(L
z
w
w
(1)
Lij
w
Ix
3:
0
w
_j
(L
D
a.
(1)
no
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #: SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
EXISTING
CONDITIONS AND
DEMOLITION PLAN
SHEET
OF 8
rn
O
O
0
04
Lo
N
11
00
C Ace
S E
pS9 Z,
%
6
N(; License # F-0891
1:
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
UL
PROJECT M SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
.00r_
SHEET
40F 8
0
a .2
u-
z
Cu
APPROXIMAI X1
R
,IV VARIABIJ WHiTH DRAINAGE
4-
0 2)
to
0
Cu
CU Cq
C)
AND SANITARY SEW_
FASMEN D
Cq
C14
Ad�
,00r_
MMUMM
jj
BM 976, P&
1980, P%C 484
00
NOW OR FORMERI-Y
BRIAN JONATHAN SPANNER
3c JORDAN McCOY SPANNER
DB 14944
NOW OR FORMERLY
BM 1980, PG< 4-84.
AARON KRACHT
PIN: 1706-87-0239
0
& I._AUREN KRACt+T
380-
D B 13176, PG� 2428
h
,
B M 1980, PG� 8" 5
0
I N: 170687--1267
TBM N(-,,,,
cp
(,I;2,3_, 0\
t
IAN
I r I I
ON F STORY WOOD
(50'RADIU5, 40'FUDLICIRIAi�
FRAME HOUSE V�jk �k, U
D_
. ..... t43-7
P11H
A/
J
4,
Ap k
�,z I 9:"j k
i'T1 E I / �in V
ou
7'17i)
.. .......
............
0 ......... ..
j
✓
13")
f
��'f/'A'P f D A IFE D 1\1
v .... .......... ..
. . . .......... .
wk, ..... .. .
�777` 4 . ..............
f
AREA
'�
rik 4
\4 ............ ...
......... .
... ............. . ..
........... .
. .. .............. ...
................. ...
B13 WOOD
.... ......
3/41 z!
UIC'
.. .........
GnA 'jIMBEIR ED .. .......... .....
.........
z, V-1i PLA N
0
A I I I ` "A \ _J-11, C) ) C1 6'1 .. gg
4 V
�Gj I t , ... ..
L"O
CON ORETE"I
>
DRI VE, A)
4 A7!
'ZI
I /m
16
<i
A ..... ....
Irr
41 .........
.. .... ....
_<C
...........
t
...... .....
"J" 37' �5
�C) :M %5 . .......... ..
OF
TOP\,,-,
WALL
0)
Dll WALL
0 z I L U I M L-111 . ........
< ... .......
C
0 ...........
. . .. ...... i A R EtE K
LLING #TO 373.4�`-,
BANK STABILIZATION
"C� R E E K
C) .............
00 *.*..*..*.*.*..
AREAS-REFER TO
DETAIL SHEET 7
2
1- ...
..............
it
M.
I
I
r)
D�
a t_ c-) ub
_K \ -
S TORY WOOD 4011 K.
ST�PS HOUSE,
FRAME 1L
N,
PROPOSED TOP
OF BANK
(7
HOUSE v4
..... .... ... .
.... X.
...... . .. ...
('A vff-
S sr mt�',
3 79.21
So an an
.'�OTE: ROOF DRAINS NO IN:
.....
371,,81
c1p
so soon -_ 0 R M E R'L Y
NOW OR
KA' A*N
FHLE'_14
EN A HUGHES
.....
/�b ...............
.......... ... f ..
N REAR OF HOUSE ............. . ..
........
i,__;�O UNDERGROUND TO . ............
..........
............
DB 10_� NF,, 2533
........
�'NKNOWN LO,�'A-11,,N ...........
All • .. . .......
L ......
2 A
%
BM 1980, PGA*84
706 -87-0 %0
El ... .... ........... �.111 ...
... .. .
... .... .... 0
... .... ...... ...
.... . . LJO
an so . .... ..
0
%
NA
H P"k, i
Q= TBM
Fix
No, 2
%
E"D
L x
x X
On Samoan
Sawwwo
Oman C
0i
i
an
?
NOW OR
ROBERT F.
FORMERLY
GREGORY S
IPF
-LEBERRY
A
>
COREEN W,
CAS"11
"I
Ij
D B 41 _3 86, P,,, 4 5), 9
BM 1980 PG, 484
()N, f")
PIN. 1,706--87--2009
SIDP ALK
NOW OR FORMER!
co I
III C"'y \ijARIAR,',LL
SARAH JANE MAR�"'S APPROXIMATE EAX'I S H N VV1UH`1 DRAINAGE
'-..-./EWER
D13 4007, PG. 0 0 AND SANITARY EASEMENT (SCALED) . . .....
'-'I A '980, PG,, 484.
BM 1980, PG� 48�' BM P,,Cl, 5()/; "HO"A
PIN: 1706-87-01,?--
co
wn
M_
u- 2
0 W
CO
f
r,',OW OR
GRAPHIC SCALE
0 0 1, 1 N 1 ,ESL1__Y KERR
10 0 5 10 20
40
31, �INDA 1-OUI-E KERR
DB 121193, PC, 366
I III! 1�1
INS"! !!Ili;
BM 198)0, PG, 4184
IN FEET
P I N: 1 /8 10
1 inch 10 ft
C Ace
S E
pS9 Z,
%
6
N(; License # F-0891
1:
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
UL
PROJECT M SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
.00r_
SHEET
40F 8
0
a .2
u-
z
Cu
LL.
4-
0 2)
to
0
Cu
CU Cq
C)
^100
LL.
Cq
C14
Ad�
,00r_
MMUMM
40 %
(L
D
2
0
CL
(1)
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT M SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
BANK
STABILIZATION
PLAN
SHEET
40F 8
0
2-i
0
12
n d)
A
NOW OR FORMERLY
BRIAN JONATIIAN SPANNER
JORDAN McCOY S)PANN`ER
DjB 14944, PG. 1076
BM 1980 r-:)G. 484
P' 706 —29 0
N: 1-87 03
L
M ZAVO 3
TB
j /I
ONE STORY WOOD
FRAME HOUSE 0-, 1
l'lRA,\DlU,`_--5, 40" PUbLIC IK/m It ,mo L) V
tp
L
A/C
j a)
—U19"', f
------
INN
a mat
NO
_4
_�l I I.", 11_1__=li5 1, r
ffNCE
SF
4
A-1 3
.............. x
... .. ...... ... ....
.......... .. A
a
LANDSCAPED AREA
C
WOOD . ......
E3133
P F' j
..........
/15
V
IV J, sf (;,OACt ix ,
AW SHED
)IMBER HL
Al a ... ... .. .
0:
6
0
iI
%saw
CONORETE" DRIV N,
E
A
is
..............
t f
..........
...........
.......... ...
L
.......... .
0 t I
. . . . . . . . ...
rN 01
...............
3A.5'
W. TOP\, F WALL
0
DIL 1- IDA-11-ED
R W 16 1
_k A� 'IMBE
1 0 N
..........
0 Ij N k0l 10 CREEK . . .........
...........
R
EEK
J
7
'k-/
or �>nzc . . . . . . . . . . J
_N-
>
X E:
999
%
OG
L
D
STORY WOOD
iOUS E
FRAME HOUSE
[77
elm
ms S VI r1l,
I'Al
S
j"
...... -rd)
7 7
CA ...... ...... "J, 2, 1
...... I.: Z:X
'I N 57 8 1
ROOF DRAINS
sl! 0 TE D)
..... ....... C,
EAR OF HOUSE A'); 1:
ON R
��OUNDERGROUND_10
NOW R '-ORMERLY
Ir ...... ....
X, .... ..... ...
1�& I'd J S
KATHLEEN PC� LOCATION
D'Ej3 10761. 1' z2? 5 3 3
.... ......... T"
84
BM 980", P
0
1706-87— 1%
J
woman SF
Maggio SF
A
vat
. .... . ....... ......
I ..........
B M I hl
i 2
TEMPORARY SEDIMENT FENCE
is
Iry ------ —
COR STD# SW-20,01 is i
x
—7
js
J
s,
s
JR,
Tc.
0 N
-0/-
SIDEWALK
. . ...... . ........ . ........
A
(C-D NOW OR FORMERLY
lZi 1 `4
00 SARAH JANE M A R, _11" S A P P R 0 X I IVI A 1" 't"' IS I G VARIABLi- WID11-H DRAINA "E'
.. . ............... . . ...........
D13 4007, PG. 007 AND SAI'J."ARY SEWER EASEMENT (SCALEL.A.,j
-76, PG, 507; BM 1980, i G, 4-84-
BM 19 8 0, PG, 4 8 8M '19/
PIN: 1706 - -87__ 01
u,
AP SOX ;MAT[.
EXIS!]N(�'�\
VAI,"�`ABLE
WIDTH DRAINAGE
A N D
A
'SEWER
_-ASEME
N
A f_
-%L tAJ
BM
197 ES P'&
OU, 6M
1980,
PC,
41184
w
CL
>;
LL
0
0)
0
3:
w
w
CL Apmr%,
X
I
LU
------ . ...... . .... ......__,.I
1 7,
NOW OR FORMERLY
AARON KRACHT
&Z, LAUREN KRACHFr'
DB "1 3176, PG. 2428
BM 1980,, PG. 815
PIN: 1706-87--1267
0
N",
BANK STABILIZATION
"N AREAS—REFER To
DETAIL SHEET 7
PROPOSED TOP
.. . ........ . . .........
OF BANK
(7
0
sl
. . .... ......
0 -------
0
p
D TOTAL DISTURBED
t,�
AREA 3508 SF
NO W if j I F'. ''l Ir?m EH_ -i
R 0 Sri "'I" i'--. (3, Rlrc_,-._ G 0 R Y &
COREEN W. CAS'FLEBERR"I
k ID B 4
PG, 4-99
BM 1980, PG. 484
PIN: 706-87-200lQ
NOW "I 1`,'' kl` 0 R I v, L N t Y
J0 1 N WE L
KERR
N D A LU U
19 66
M 1980, P 1` 3. 484-
PIN: '!1 7 06 103
0
( IN FEET )
1 inch = 10 ft.
60
kA CA&
S E
S-
k
0
N
,4-� Fq IVA,
6
NC License # F-0891
3:
fr% W
%laj j
UJ
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
C)) 0
.j
w
z
Co or)
0 LL.
2- C/)
0� 2)
w
CL
>;
LL
0
0)
0
3:
w
w
CL Apmr%,
X
I
LU
CIO
N
u
Cc NC,4
0
LAJ
w
z
0
0
U)
W
w
(L
0
R
(L
F-
D
0
x
F-
z
w
0
0
U-
0
uj
W
D
x
uj
O
0
z
0
D
O
w
IL
Lu
Ix
z
Q
Lu
Lu
Oa
z
uj
W>
uj
U)
w
It
w
0:
Cr
_j _j
0-
D
O
a.
(0
3:
no
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #. SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
EROSION
CONTROL
PLAN
SHEET
5, OF 8
E
✓
0
0
iu
N
iF
F' SANITAR"', SIEWER EA"--'EMENT (SCAl
N _FD
8 0, PI& 484
BM '1976, 55,07; BM
N 0 W R FORMERLY Z—
BRIAN JO�,ATHAN SPANNER
& JORDAN M-COY SPANNER
I
')W OR F-ORMEI Y
D 14�44, PG. 1076 NC
BM 1 �?80, PG 484 A A R 0 KRACHT
PIN: 1'��--"06-87-0239 LAURE"N KRACHT
C B 1 r PG, 2428
BM /19 PG, 815
0 11- 6
PIN: 17 C, 8 7 —12 67
L..
TBM No. 1
P vil N J1
J v pst I \11
ONE STOIR:Y WOOD 0
X, I
FRAME
(50' RADUE-5. 40'PUBLIC RAM
0
M, i 4)
0
'C
A 0
Ap
Ia
0
_....<...._ on
"D 1,10
---'-7F"-NC j 1'7 17
rl IT rD AT
y
�07 '7 V1
A,
P" pi
/t
0
8'
LANDSCAPE_:- FARE A
C�
jj
FE 0
SO
WOOD
3/4" IPF z
BB
! t� 7 '7/ '7
GOAi- CLI
JIMBER PL-A S H ED
x, 0
Z.
1 41
NTE4 f'
C) 4
>
A I I
4 CON (Z R E TE" D R I VE A) i
4
LJP I fn
'71
LI M I
<
. . . . .
A
V '731 ICJ
'7
V '7
'7
v- T.11 ED 01- 0
0 A
0
n I /IL/A Lj,1A I t-J-)A-1
A211 V it,
0 1
Ls EEK 17 % IS �'iAU ING fTO CRE
r
. .. .... CONTRACTOR TO PLANT LIVE •(J14 '7 '7
L01 REEK STAKES FROM BANK FULL
CA
117
J C) TO TOP OF BANK
f 17 0
CO
�v IV7,
0
40'-
CONTRACTOR TO SEED AND
DOC,
B1-0(/K\ MULCH ALL DISTURBED
I STORY Yli'OOD uI" '
HO �7 ------- --------- -
FRAME HCUSE 'A STEP'S AREAS OUTSIDE STREAM TOP
I " OF BANKS
L0z]
S S Ivi'Im"I
"A
37' `q'77i'V7
379
T (D-0 �21
t-0 N 0 TE: R 0 DRAINS 40 371.81'
Solana v
so F HOUSE V; OWI` 6 8.91
ON REAR
V1 q7
NOW R M E R L Y TO
r
GO UNDERGROUND 17 V V"117 /V/
KAT!I'LEEN Al"' "'ri ES
UNKNOWN -OC'ATION 7 Vt,
V V
D 10761. Ilk 2533
17 V', 5V V
17, 17
BM 980, P GV.- 8, 4 0 0
I N 1706,---87--0 17
all
so no 0' on so vqv v )(71 ------
AV7 0)
Am",
7j'
NIK
'T
0
'7 7- TIBM No. 2
X TOTAL DISTURBED
"c" D
*iN Fir 3 4" AREA 3508 SF
so L7— x
0
q] Z- C)
r
N"OW OR F'0 R M E R L Y
------ . ... T GREGORY
R 0 B EER
t3/4" IPF COREEN W. CASTLEBERRY
"16
A
DB 4386, PG, 499
BM 1980, PG. 4,84
CONCRE"I"
C PE
PIN: 1706 87--.2009
S 11) W A LK'
r
0) 0-0-1 1
0 NOW OR FORMERLY
00
xn
Y <<
00 SARAH JANE MARKS APPROXIMAI-E .-'--XIS'IING VARIABLE WIDTH DRAINAGE Z:
DB 4007, PG. 007 AND SANITARY SEEWER EASEMENT (SCALE D)
48A
BM 1980, PG. 484 BM 1976, PG� 5,07; BM 1980, PG.
I I V) QD
PIN: 1706--87-0132
B B
Co
GRAPHIC SCALE
1 10 0 5 10 20 40
J; N ()"W C")R
S 1- Y K RIF
J011-1 Wk-
&
#1
KE--RR1
D B 19 3,
P G
3 6
BM 1980,
P
4 8 4,
PIN:
3`7
10,31
PROJECT #: SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
PLANTING
PLAN
SHEET
OF 8
" IN FEET )
1 iE-11ch = 10 ft.
CA
Boni
jDa7- -4
N
N�
14444m,40*00 6
to
NC License # F-0891
M
(D
w
0
w
0
z
O
D
a
0
w
a.
w
w
2f
0
(1)
Lu 0)
0)
0)
0
0.
z
Lu
w
it
ul
Ir
m
0
n.
0
(L
rj)
CO)
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #: SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
PLANTING
PLAN
SHEET
OF 8
D
r
21
A
E
0
r
0
2-
u
�t
EXISTING DILAPIDATED
EXISTING TIMBER RETAINING WALL
GRADE (TO BE REMOVED)
i ; I 111 I I� � I I I � � � � ;��, � � - I_, , I I I
7221� -
TIE TO
EXISTING
GRADE
PROPOSED
I FABANKFULL--\ GRADE
07,11,91rom
NOTES:
1, CONTRACTOR TO PERFORM BANK
STABILIZATION ON 5612 MARAM COURT
PROPERTY ONLY,
2. CONTRACTOR TO SLOPE BANKS AT
2(H):1(V) IN AREAS OF TIMBER WALL,
3. CONTRACTOR TO STABILIZE BANKS
7
UTILIZING CE iR FIBER MATTING AND
LIVE STAKES. SEE DETAILS THIS
SHEET,
BANK STABILIZATICY11 TTPICAL SECT109
SQUARE CUT
BUDS (FACING U
LIVE CUTTING
(1/2"-2" DIAMETER
ANGLE CUT 3
NOT TO SCALE
2 - 3 Feet
twx
EXISTING/PROPOSED
STREAMBED
BANK STABILIZATION WITH LIVE STAKES
NOTE:
LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET
ON CENTER
LIVE STAKES SHALL BE DR11VEN UNTIL APPROXIMATELY 3/4
OF LIVE STAKE IS WITHIN GROUND
LIVE STAKES SHALL CONSIST OF 50% BLACK WILLOW AND
50% SILKY DOGWOOD
LIVE STAKES SHALL BE 2-3ft IN LENGTH
LIVE STAKE PLAIN'TING DETAILS
SEE DETAILS THIS SHEET
FOR MATTING AND LIVE
STAKE STABILIZATION OF
PROPOSED SLOPES
— 12" ANCHORS
ON 3' CENTERS
21' x 2$$ x 2411
WOODEN STAKES
COIR FIBER----,,,,,,,
MATTING
TOE MATTING INTO CHANNEL BED BY
INSTALLING BED MATERIAL AFTER
INSTALLATION OF MATTING
MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
•
SEED AND STRAW
-ANCHORS ON 3' CENTERS
4
NC License # F-089
J•
D
O
0
z
Lo
0
w
w
CO
CO
0
0-
z
w
w
w
w
0
Ix
0
EL
CC))
REVISIONS
11 1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
oou%
9 u
I 1
%ago
C)
0
0
u-
p
^00
z
E
0
n
J
TITLE
STREAM
RESTORATION
DETAILS
SHEET
70F 8
Ll C0
:2
0 2 2)
Cl)
W
w
m
CL
x
w
U.
cc
3: §
4-1
04
C0
^000
FY C14
(14
Lu
LL.
-.0or
0
LL1,
z
0
w
a.
O
a.
Z)
0
m
z
LLJ
2
0
0
0
LL
0
Lu
CO)
D
O
0
z
Lo
0
w
w
CO
CO
0
0-
z
w
w
w
w
0
Ix
0
EL
CC))
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #: SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
STREAM
RESTORATION
DETAILS
SHEET
70F 8
O
O
0
O
rn
ai
Q>
0
0
0
E
C
.2
gm�
.40
APPROVED PLAN VIEW STREAM
DEWATERING DISCHARGE DIVERSION
DEVICE HOSES f PUMPS
P INTAKE
HOSE
P DEWATERING A A
FLOW
-� INTAKE HOSE FLOW
, "I'll
SEDIMENT CLEAN WATER SUMP-HOLE OR
DIKE DIKE POOL (12" TO 18"
PUMPS SHOULD i WORK AREA LENGTH DEEP 2'DIA.)
DISCHARGE ONTO A
STABLE VELOCITY NOT TO EXCEED THAT
DISSIPATOR MADE OF WHICH CAN BE
RIP RAP OR COMPLETED IN ONE DAY
SANDBAGS Section A-A
IMPERVIOUS SHEETING
WORK AREA BASE FLOW + 1 FOOT
(2 FOOT MINIMUM)
CROSS SECTION OF
IMPLEMENTATION SEQUENCE: SANDBAG DIKE
SEDIMENT CONTROL MEASURES, PUMP-AROUND PRACTICES, AND ASSOCIATED DREDGE CONSTRUCTION
SHOULD BE COMPLETED IN THE FOLLOWING SEQUENCE (REFER TO DETAIL).
1. THE CONTRACTOR SHOULD ONLY BEGIN WORK IN AN AREA WHICH CAN BE COMPLETED BY THE END
OF THE DAY. AT THE END OF EACH WORK DAY, THE WORK AREA MUST BE STABILIZED AND THE PUMP
AROUND REMOVED. WORK SHOULD NOT BE CONDUCTED IN THE STREAM DURING RAIN EVENTS.
2. SANDBAG DIKES SHOULD BE SITUATED AT THE ENDS OF THE WORK AREA AS SHOWN ON THE PLANS,
AND POND WATER SHOULD BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE
ONTO A STABLE VELOCITY DISSIPATER MADE OF RIPRAP OR SANDBAGS.
3. WATER FROM THE WORK AREA SHOULD BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A
DEWATERING BASIN, SEDIMENT BAG, OR OTHER APPROVED SOURCE. THE MEASURE SHOULD BE
LOCATED SUCH THAT THE WATER DRAINS DOWNSTREAM OF THE POND.
4. AFTER AN AREA IS COMPLETED AND STABILIZED, THE CLEAN WATER DIKE SHOULD BE REMOVED.
AFTER THE FIRST SEDIMENT FLUSH, A NEW CLEAN WATER DIKE WOULD BE ESTABLISHED FROM THE
OLD SEDIMENT DIKE. FINALLY, UPON ESTABLISHMENT OF A NEW SEDIMENT DIKE BELOW THE OLD
ONE, THE OLD SEDIMENT DIKE SHOULD BE REMOVED.
TEMPORARY PUMP AROUND_
NOT TO SCALE
DEWATERING DEVICE
NOT TO SCALE
NC License # F-0891
I I I
u.j
=mar,
)
NOTE:
#2
COR 90% COMMENTS (8/14/14)
SILT CONTROL SYSTEM TO BE USED IN CONJUNCTION
—C C)) 0
r—
C;):5 LL
WITH PUMP AROUND IF DEEMED NECESSARY BY
SEDIMENT CONTROL INSPECTOR.
HIGH STRENGTH
-C
BAG PLACED ON DOUBLE STITCHED
w LL.
x 0
w
DEWATERING/FILTER BAG MATERIALS SPECIFICATIONS:
AGGREGATE "J" TYPE SEAMS
C-4
OC
THE DEWATERING/FILTER BAG SHALL BE MADE OF
OR T
SIT
NON-WOVEN GEOTEXTILE WITH A MINIMUM SURFACE
w
W
(L
AREA OF 225 SQUARE FEET PER SIDE. ALL STRUCTURAL
0
It
11
z
SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A
0
ff I
SEWN IN SPOUT
DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH
W
IL
...........
................
............. .... I .... ...
.......... .......
...........
.................. ...........
... — .......................
..............................
HIGH STRENGTH
THREAD. THE SEAM STRENGTH SHALL WITHSTAND
............. ............
100LB/IN USING ASTM D-4984 TEST METHOD. THE
z
w
2
...
... .. .. .......
.............
STRAPPING FOR
l/
DEWATERING/FILTER BAG SHALL HAVE "A NOZZLE LARGE
..................... ....
......... .......
LL
0
HOLDING HOSE IN
ENOUGH TO ACCOMMODATE A FOUR INCH HOSE. THE
LO
...............
... ..................
.............. I ...
....... ............
PLACE
NOZZLE SHALL BE SEALED TIGHTLY AROUND THE
..............................
.......... ...........
.........................
.............................
........... I I . � ... I I .........
................. .....
DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE TO
.......... I ...... ..... .
................ ......
................. ...........
............. ............
............. ....
.................
................
is
..
WATER FROM ESCAPING. THE
PREVENT UNTREATED WA
......................... .... —
.... I .................. .......
...............
WATER FLOW
FABRIC SHALL BE A NONA%lOVEN FABRIC WITH THE
........................
..... ................ ......
............................
................
FROM PUMP
FOLLOWING PROPERTIES:
WEIGHT ASTM D-3776 10
----------- 16-01'
PUMP DISCHARGE
HOSE
OZ/YD GRAB, TENSILE ASTM D-4632
270 LBS
OPENING
PUNCTURE ASTM D-4833
TOP VIEW
ACCOMODATES
150 LBS
UP TO 4"
FLOW RATE ASTM D-4491 70
DISCHARGE
GAL/MIN/SQ FT
PERMITIVITY ASTM D-4991
HOSE
1/1.3 SEC
UV RESISTANCE ASTM D-4355
70%
AGGREGATE OR
AOS% RETAINED ASTM D-4751 100
STRAW SIDE VIEW
CONSTRUCTION:
UNDERLAYMENT
THE DEWATERING/FILTER BAG SHALL BE INSTALLED
OVER A 3 INCH GRAVEL BASE OR A STRAW BALE BASE TO
PROMOTE INFILTRATION AND DEWATERING OF THE
FILTER BAG.
DEWATERING DEVICE
NOT TO SCALE
NC License # F-0891
I I I
u.j
=mar,
)
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
%wo)"
—C C)) 0
r—
C;):5 LL
W,
ca
C/)
X
0
w
-C
Ll
4— 2)
cc
w LL.
x 0
w
.0or-
ca
C-4
OC
-j
C-4
04
w
W
(L
0
It
11
z
0
ff I
W
IL
O
a.
D
0
T
z
w
2
D
0
O
LL
0
W.
(1)
D
O
C
0
z
0
w
w
0
a_
Lu
W
w
(L
O
a.
(1)
REVISIONS
#1
COR 65% COMMENTS (7/23/14)
#2
COR 90% COMMENTS (8/14/14)
PROJECT #: SM 2014-XXXX DATE: 08-25-2014
DRAWN BY: VMD,RST CHECKED BY: DH
TITLE
EROSION
,CONTROL
DETAILS
SHEET
80F 8