Loading...
HomeMy WebLinkAbout20191658 Ver 3_401 Application (2)_20220920 o 0 vim. NORTH CARO.INA Staff Review Form Envlmnm¢ntrtl Qvofiry Updated September2020 Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 3 20191658 Is this project a public transportation project?* Yes No Is this a DOT Yes No project?* Reviewer List:* Dave Wanucha:eads\djwanucha Select Reviewing Office:* Winston-Salem Regional Office-(336)776-9800 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note:fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* For the Record Only(Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre-Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre-Filing Meeting Date Request was submitted on: 12/6/2019 Project Contact Information .......................................................................................................................................................................................................................... Name: Jeff Hemphill-NCDOT ECAP Who is submitting the information? Email Address: jemphill@ncdot.gov Project Information Existing ID#: Existing Version: 20191658 2 20170001(no dashes) 1 Project Name: Replace bridge 040008 on NC 194 over the North Fork New River Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown TIP#: WBS#: B R-0002 67009.1.1 (Applies to DOT projects only) County(ies) Ashe Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Only pdf or kmz files are accepted. Describe the attachments or comments: SAW-2019-02373-link to permit package: https://xfer.services.ncdot.gov/pdea/Permissued/BR-0002 Ashe June 23 2020.pdf NCDOT requests the renewal of the 404 and 401 permits issued June 12,2020 and there are no changes to project impacts from the March 23,2020 Permit Mod Application.Construction hasn't started on the new bridge yet(site preparation is underway),and the contractor may not remove the the existing bridge until late 2023/2024.BSG will survey the existing bridge for bats next summer prior to demolition. Sign and Submit ...................................................................................................................................................................................................................................................................................................................................................................................................... By checking the box and signing box below, I certify that: • I,the project proponent, hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief. • I,the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically.