Loading...
HomeMy WebLinkAboutWQ0043746_Application (FTSE)_20220818State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 06-21 & SUPPORTING DOCUMENTATION Application Number: 0 � (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Fuquay-Varina NC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County M Municipal ❑ Other 3. Signature authority's name: Michael Wagner per 15A NCAC 02T.0 106Ub) Title: Public Utilities Director -WC DePt of Environmental Qu gty 4. Applicant's mailing address: 134 N. Main St. City: Fuquay-Varina State: NC Zip: 27526-7894 Mn 5. Applicant's contact information: Phone number: (919) 753-1028 Email Address: m)vaIner `10 Region nOf II. PROJECT INFORMATION: 1. Project name: Carolina Gardens Subdivision — Phases 19-22 2. Application/Project status: M Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.56' Longitude:-78.77' 5. Parcel ID (if applicable): 0675172458 0675271608 0675275371 0665982183 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: i. Professional Engineer: Mike Zaccardo, PE License Number: 022321 Firm: Timmons Group Mailing address: 5410 TriniLy Road, Suite 102 City: Raleigh State: NC Zip: 27607-6002 Phone number: (919) 532-3281 Email Address: mike.zaccardo rOtimmons.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional W WTP Permit Number: NCO021636 Owner Name: Harnett County V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ0039437 2. Downstream (Receiving) Sewer Information: 10 inch M Gravity ❑ Force Main 3. System Wide Collection System Permit Numbers) (if applicable): WQCS00193 Owner Name(s): Town of Fuquay-Varina FORM: FTA 06-21 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ® N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑ No ® N/A 3. If the Applicant is a Home/Property Owners' Association, has an HOA/POA Operational Agreement (FORM: HOAR and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ RetaiI (stores, centers, malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial {See 15A NCAC 02T .0103(20)) If industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114f ? ®Yes ❑ No ➢ If provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) I Daily Design Flow s,b (No, of Units I Flow Residential —4 bedroom 300 gal/day 147 44,100 GPD gal/ GPD gal/ GPD gall GPD gal/ gal/ GPD GPD Total 44,100 GPD a See 15A NCAC 02T A 114(b) (e i and e 2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02'r.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 44,100 GPD (per 15A NCAC 02T .01 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: _. Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑ Other (Explain): FORM: FTA 06-21 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01C.l.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 06-21 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0I&D & W? ® Yes ❑ No 15A NCAC 02T.0305f t7 contains minimum-,Pnaratinne that shall hi- n—virl—I fnr sew— ct,­s Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches 2Water mains (vertical - water over sewer preferred, including in benched trenches) 18 inches ZWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class Il impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ If noncompliance with 021.0305(f) or (g} see Section X.1 of this application * 15A NCAC 02'T 0305(2 contains alternatives where separations in QT—r.0305M cannot be achieved. Please check "yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webpa&e 2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑ No [:]N/A ➢ If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes ❑ No ❑ N/A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No ➢ This includes Trout Buffered Streams per 15A NCAC 213,0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15ANCAC 02T.01050c L66) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(cfi , directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02`1'.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 06-21 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with I5A NCAC 02T, the Minimum Desn Criteria for the Permitting; of Pump Stations and Force Mains {latest version, and the Gravity Sewer Minimum Design Criteria {latest version) as applicable? /� • If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and proicets reguiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is re uired 2. Professional Engineer's Certification: I, V , attest that this application for _� (Professional Engineer's name from Application Item II1,1.) (Project Name from Application Item IL 1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Giavity Sewers latest version), and the Minimum.Design Criteria for the East -Track Pennittina of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): — �- //,1I111111ti1�\1 E I, Michael Wagner _, attest that this application for Carolina Gardens Phases 19-22 (Signature Authority Name from Application Item I.3.) (Project Name from Application Item I1,1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: _ Date: 06/06/2022 FORM: FTA 06-21 Page 5 of 5 Project Name: Carolina Gardens — Phases 19-22 Location: Fuquay Varina, Wake County, NC Owner: Pulte Home Company LLC 1225 Crescent Green Drive Suite 250 Cary, NC 27518 Developer: Pulte Home Company LLC 1225 Crescent Green Drive Suite 250 Cary, NC 27518 Consultant: Timmons Group Mike Zaccardo, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Phone: 919-532-3281 PROJECT DESCRIPTION AND NARRATIVE: The The proposed project is inside Fuquay Varina jurisdictional limits and is located on the west side of NC 55, south of the intersection with Holland Road. The scope of this project will include the construction of 147 residential lots and associated roads in phases 19-22. The proposed public sewer extension will provide service to Phases 19-22 of Carolina Gardens Subdivision on a 73.21-acre tract of land in Fuquay Varina, NC, Development Flow Rate: 44,100 gpd (147) single-family houses @ 300 gpolunit (assuming 4-bedroom units) A 404 Nationwide 29 permit for residential developments from the US Army Corps of Engineers (Action ID: SAW-2017-01340) and a 401 Water Quality Certification from NCDEQ Division of Water Resources (DWR #18-1414) have been approved for this project. The gravity sanitary sewer system will be owned, operated, and maintained by the town of Fuquay- Varina. NC Dept of EnvironmentalQuality State of North Carolina 0 us Am 0 Department of Environmental Quality ., Division of Water Resources Division o water Resources Flow Tracking for Sewer Extension Applications -1 lei& Regional Officc (FTSE 10-18) Entity Requesting Allocation: Town of Fuquay-Varina Project Name for which flow is being requested: Carolina Gardens Phases 19-22 More than: one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 All flows are in MGD c. WWTP facility's permitted flow 2.600 d. Estimated obligated flow not yet tributary to the WWTP 0.681 e. WWTP facility's actual avg. flow 1.224 f. Total flow for this specific request 0.044 g. Total actual and obligated flows to the facility 1.905 h. Percent of permitted flow used 73.2% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / po, Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Hidden 39437 .720 .288 .038 .175 .213 .075 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Hidden Valley Downstream Permit Number: 0039437 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Michael Wagner certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Public Utilities Director Title of Signing Of Date Page 2 of 6 FTSE 10-18 Mate Of .tNorth Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director November 7, 2001 Mr. Michael A. Allway, Assistant Town Manager Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, North Carolina 27526 Dear Mr. Allwav: IT 0�'J ENR NORTH CAROLINA DERARTMENT OF ENVIRONMENT ANU NATURAL RESOURCES dl�'r' 4f1ia1 Subject: Town of Fuquay-Varina Flow Reduction Approval Wake County d Ala" On September 10, 2001, the Division of Water Quality Non Discharge Permitting Unit received your flow reduction request for future and present, but not yet tributary, single-family dwellings in the Town of Fuquay-Varina. The letter requests approval of a residential flow value of 220 GPD/residence for these dwellings. The information provided water use information for 2000 and actual daily waste water flow recordings for their peak month of May. Other supporting data was provided. The evaluation covered 90 homes that are representative of the subdivisions in Fuquav-Varina in accordance with 15A NCAC 211.02190)(3). Based on the information submitted, the Division hereby approves the use of 75 GPD per bedroom per dwelling for residential units (225 GPD per three bedroom home) in all applicable non -discharge permit applications for future sewer he extensions and present, but not yet tributary projects for the,Town of Fuquay- Varina. The Division did note that the average flow per residence in February 2000 was 271 GPD. Regardless of the adjusted design dailv wastewater flow rate at no time shall the wastewater flows exceed the effluent limits defined in the Town's NPDES pern it for the'treatment facility or exceed the capacity of the sewers downstream of any new sewer extension Please submit a separate letter to the Raleigh Regional Office that I requests flow reductions for specific previously permitted projects (indicate permit number, project nanne,_permitted flow, new flow under reduction and the difference between themt). If you have any questions or comments regarding this matter, please contact Marie Doklovic at (919)733-5083 ext. 371. Since Gregory J. Thorpe, Ph.D. cc: Raleigh Regional Office Flow Reduction File 1617 Mail Service Center. Raleigh, North Carolina 27699-1617 Telephone 919 733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper zi ZUSGSU.S. DEPARTMENT OF THE INTE U.S. GEOLOGICAL SURVEY IOR .III U rl0 SCALE I.24 000 FUQUAY-VARINA QUADRANGLE RT-I -. .- 1-B FUQUAY-VARINA, NC 200 W2: Utility Crossing 0,079 (acres) (acres} 1tV3: iitil`tty Gassing 0.032 {acres) acres), W4: Temporary Construction 0 (acres) 0:025 (acres} W4: Road Fill 0.00E1'fa cres) 0' {acres} WS: Temporary Construction 0 (acres) 0 03$ (acres) W5: Road Fill &Culvert 0.I25 (acres) 0 {acres] tEx `Temporary 7,7 CoFvstlr-- WOO _ 0 (acres) t?:026 (acres) W6: Road Fill 8i Culvert 0.033 (acres) 0' (acres) W7: Temporary Construction 0 (acres) .0,046 (acres) ; R�cres) 7: Road Fill & Culvert 0.126 (a 0 (acres) -' W$; Temporary Construction 0 (acres) 0.017 (acres) ttUB: Road Fill &Culvert 0.043 (acres) (acres) W9: Temporary Construction 0 (acres) 0.023 (acres) W9: Road Fill & Culvert 0.063 (acres) 0 (acres} W10: Temporary Construction O(acres) 0.001(acres) Wil: Utility Crossing 0.17 (acres) d (acres) W12: Utility Crossing 0-002 (acres) 0 (acres) W13: utilityCrossing 0.048 (aeres} 0 (acres) W14: Utility Crossing 0,074 (acres) 0 (acres) W15: Temporary Construction 0 (acres) 0.034 (acres) W15: Road Fill & Culvert 0,030 (acres) 0 (acres) Stream S1: Road Crossing -Temporary Construction 0 (linear feet) 20 (linear feet) S2: Road Crossing 80 linear feet) 0 (linear feet) S3: Road Crossing -Temporary Construction 0 Oinear feet) ZO (linear feet) S4: Eioad Crossing 65 (linear feet) 0 (linear feet) S5: Road Crossing -Temporary Construction 0 (linear feet 20 (linear feet) S6: Road Crossing 70 (linear feet) i (linear feet) S7: Road Crossing -Temporary Construction 0 (linear feet) 20 (linear feet) 58: Road Crossing 70 (linear feet) 0 (linear feet)' 59: Utility Grassing' 0 (linear feet) 45 (linear feet) S10: Utility Crossing 0 (linear feet) 40 (linear feet) S11. Utility Crossing 0 (linear feet) 21(linear feet} 512: Road Grassing -Temporary Construction 0 (linear feet) 10 ((inset feet) 513: Road Crossing 80 (linear feet) 0 (linear feet) 2iPa;c