Loading...
HomeMy WebLinkAboutSediment Loss_ C204368 - Silt Loss STA 35+25 -Y5- LTCarpenter, Kristi From: King, Art C Sent: Wednesday, September 14, 2022 4:09 PM To: James.C.Lastinger@usace.army.mil; Conchilla, Ryan Cc: Young, Joshua M Subject: FW: C204368 - Silt Loss STA 35+25 -Y5- LT Attachments: STR - 1624Ajpg; STR - 1624A - 2jpg; Plan Sheet.pdf Gentlemen, Please see the sediment loss report for R-3421AB submitted to me by the Resident Engineers Office. I plan to visit the site tomorrow. I have asked that the inspector instruct the contractor proceed with the necessary cleanup and repairs ASAP. Please let me know if you have any questions or, need additional information. Thanks, Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 773 8015 office acking ncdot.gov 121 Dot Drive Carthage, NC 28327 From: Cranford, Darren L <dlcranford@ncdot.gov> Sent: Wednesday, September 14, 2022 3:52 PM To: King, Art C <acking@ncdot.gov>; Young, Joshua M <jmyoung@ncdot.gov> Cc: Fine, Cary A <cafine@ncdot.gov>; Owens, Lonnie H <Ihowens@ncdot.gov>; Dunn, Thomas B <tbdunn@ncdot.gov> Subject: C204368 - Silt Loss STA 35+25 -Y5- LT Art, Please see the attached information showing the location of a silt loss on Contract C204368 (R-3421 B). The estimated silt loss is less than 1/4 of a cubic yard, this was due to a rain event on Saturday of 1.5" in 24 hours. It appears that this area has slowly built up sediment in this location due to material upstream and a small undermining of the silt fence in this area. Vecelio and Grogan has already repaired the silt fence in this area. This silt loss was contained in a temporary stream diversion set in place until the 60" RCP Class V can be placed under -Y5-, this pipe system can not be completed until -Y5- is shut down due to grade changes. I have attached a plan sheet showing the exact location of the silt loss and what part of the temporary channel this silt was contained. I have also attached 2 pictures for reference, in the pictures you can see that the silt has not migrated to the Temporary 24" HDPE pipe. We plan on doing a pump around and cleaning this portion of the temporary channel. If you have any other guidance in order to keep silt from migrating from upstream please let me know. If you would like to take a look at the area, I will be on site all day tomorrow or any time next week. If you have any questions or concerns please let me know. Thanks, Darren Cranford Assistant Resident Engineer NCDOT Highway Division 8 District 1 Resident Engineer's Office 336 318 4020 office 336 479 1360 mobile dlcranforda-ncdot.gov 300 DOT Drive Asheboro, NC 27204 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.