Loading...
HomeMy WebLinkAboutWQ0037203_Owner (Name Change)_20171002Water Resources £NVInoPMaNYAL GUAtrrY October 2, 2017 Brad Coburn, CFO AEP•CharterWayne, LLC 222 SW Columbia, Ste. 1750 Portland; OR 97201 Subject: Change of Ownership Approval Permit No. WQ0037203 Wayne Preparatory Academy - Phase 1 Wayne County Dear Mr. Coburn: Division personnel have reviewed and approved your permit modification request for Permit No. WQ0037203. This modification is to change ownership from Vertex 111, LLC to AEP Charter Wayne, LLC, and AEP Charter Wayne, LLC is now responsible forthe continued operation and maintenance of the subject wastewater collection extension. Our database has been revised to reflect the ownership change. The Permittee shall maintain compliance with its Individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0400 and GS 143-215.9B. tf an individual permit is not required, the performance criteria as required by 15A NCAC 02T .0403 shall be met. If you have any other questions regarding this matter, please contact Monti Hassan at (919) 807- 6314 [email:monti.hassan@ncdenr.govj. ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director for Jay Zimmerman, Director Division of Water Resources, NCDEQ enclosures: WQ0037203 Jared Haddock, Vertex III, LLC Oared@vertexnp.com) Washington Regional Office, Water Quality Regional Operations Section Water Resources Central Files —WQ0037203 PERCS Files (electronic copy) - Nothing Compares State of North CaroIna I ErMronmsntal Quality.' water Resourcas 1617.Mail Service Center.' Raiaigh,Narth Carolina 276991617 a RCDEFI,, STATE OF NORTH CAROLINA ENVIRONMENTAL MANE� �� O N DEPARTMENT OF ENVIRONMENT D NAU�pURGES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT General Statutes -of North Carolina as provisions of Article 21 of Chapter 143, ranted to the In amended,dande othere the Regulations, permission is hereby g and applicable Laws, Rules' and g Provo Land Exchange III, L.C. Wayne County um station with duplex Pumps• on -site Ilon per minute pump operation of a 190-i� and permanent generator with automatic transfer switch, for ibe construction h and ap telemetry, and approximately tic feet t4 as audible and p r x mate water alarms, gravity sewer, ly20linearfacility of 44 approximately 1,243 linear feet of 6-inch g plus, gallons inch forcewell as apenor cafeteria (578 students)and the pre-kindergarten of g persons) main to serve school with at Academy — Phase 1 project, sewerage 7 as part of the Wayne Preparatoryof Goldsboro's persons) Pa with 1 existing the er day eceived June 16, 2014 and In conformity llc15A; the D2isiohe of collected domesticJcommercial wastewater into the �� 96 as app P Iication 19 system, pursuant Sewere the application Design Criteria adopted February 12, tee June 1, of Pump Stations and Force Mains adopted of Division's Gravity i Minimum Fast -Track Tfiled oansd approved e by the dop 200a Minimum Design Criteria for therupp rt ng data sub subsequently Environment as applicable; and other supporting art of this permit. Environment and Natural Resources and considered a P rescinded and shall be subject to the specified This permit shall be effective from d Cdate er e�of Issuance until conditions and limitations con Permit issued this the 19th day of une, 2014. for Thomas A. Reeder, Director Division of Water Resources, NCDENR Management Commission By Authority of The Environmental Mang Permit Number. WQ0037203 SUPPLEMENT TO PERMIT COVER SHEET Provo Land Exchange III, L.C. is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the City of Goldsboro's WWTP (NC0023949) prior to being discharged Into the receiving stream. Permitting of thls project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval Is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions Identified below. I. SPECIAL CONDi11ONS _ ,r 1. This permit shall become voidable unless the agreement between Provo Land Exchange III, L.C. and the City of Goldsboro for the collection and final treatment of wastewater is In full force and effect. 2. If, at any time, the additional wastewater flow volume made tributary to this sewer extension is believed to exceed the value permitted herein, a modification shall be requested for thls permit from the Division of Water Resources to properly allocate the subject wastewater flow. 3.. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there Is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variarce requests will be evaluated on a case -by - case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. 4. The abandonment of any existing wastewater facilities Including septic systems being. replaced by new sewer infrastructure shall be done in accordance with the applicable agency having compliance oversight on such facilities. t1. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of thls request shall be considered on its merits and may or may not be approved. This permit shall become voidable unless the, wastewater; collection facilities are constructed in accordance with the con 2 permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum ditions of this Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the st-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other Fa supporting materials unless specifically mentioned herein. This permit shall be effective only -with respect to the nature and volume of wastes described in the 3. P application and other supporting data. The The wastewater collection facilities shall be property maintained and operated at all times. 4permit for the Permittee shall maintain compliance f these with as requireddby 15A NICAcollectionT .0403. If an individual permit operation and maintenance ° performance criteria shall be met as provided in 15A NCAC 2T .0403: Is not required, the following a. The sewer system shall be effectively maintained and ortoff at all t matees orsta prevent arddlo hs fi to ce land or surface waters, and to prevent any contravention water standards. b. A map of the sewer system shall be developed and shall be actively maintained.' c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, .spare„,parts inventory and overflow response has been developed and Implemented. d. Pumpithat are not connected to a telemetry system shall be inspected every day (Le. 365 stations stations that are connected to a telemetry system shall be inspected at least days per year). Pump once per week High-priorlty sewer lines shall be inspected at least once per every six -months and inspections are documented. A general observation of the entire sewer system Overflows and bypasses shall be reported to the with i5A NCAC 2B .0506(a), and public notice General Statute §143-215.1C. h. A Grease Control Program is In place as follows: 1. For ublic owned collection systems, the Grease Control Program shall include at least biannual p the legal distribution of educational materials for both commercial esbllshments.slThe ial plan shall also include means to require grease interceptors at existing enforcement for violators and the legal legal means for Inspections of the grease interceptors, means to control grease entering the system from other public and private satellite sewer systems. an 2. a n privately owned collection systems, the Grease Control Program shall include at least i- nual distribution of grease education materials to users of the collection system by the Permittee or Its representative. i e. f. g- shall be conducted at least once per year. appropriate Division regional office in accordance shall be provided as required by North Carolina . 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. I. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. J. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. Noncompliance Notification: The Permittee shall report by telephone to a water resources staff member at Washington Regional Office, telephone number (252) 946-6481, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of alfdquate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to Interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 7. Per 15A NCAC 2T.0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to'this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certifjcatilon. an A complete certification is one where the form is shall in lode executed thfad tv ,nssupporting documents are provided as applicable. Supporting documentationll t' the project ect construction record drawings (plan & profile views of sewer lines & force a. One co1 mains) of the wastewater collection system extension. ned as the design'ngs drawings that hat are marked be clear on the plans or on digital media (CD or DVD disk) and arerequired buffers, separation up or annotated with after construction information, and show distances, material changes, etc. system curve, b. One copy of the supporting pump station design calculations (selected pumps, rsy greaterurv, calculations, available storage if portable generator(s) operating point, buoyancy urn stations permitted as than longest past three year outage reliability option selected) for any pump part of this project. project• that do not result in non-compliance with this permit, regulations, or the c. Changes to the Minimum Design Criteria should be dearlyidentified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in a length increases of 10% or greater, increased flow, non-compliance with this permit (includin g pip d n nu pumpof station design capacity design increases of 5% orgreater, anInc ei cases i the vumber t to the connections), regulations, or the Minimum Design Criteria.Requested Please Design Criteria will be reviewed on a case -by -case basis and each on Its own merit. .ring the Minimhmaarequested and approved note that variances to the Minimum Design Criteria should be the Division peeing process prior to construction. Aftor repai Ion requests t certification & activation. are discouraged and may not be approved, thus requiring replacement g. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. Failure to abide by the conditions and limitations contained inapplicable; this permit; 15A DiviNCACsion's Minimum;theD Design gn g' 2000 as Gravity Sewer Design Criteria adopted February 12,1996 as pp adopted June 1, applicable; for the Fast -Track Track Permmaterialsof Pmays subject the Permittee toMains an enforcement action by he Division, and other sucepp with m 6C, Division, in accordance with North Carolina dl Statutes collect on facia es1and/orthrough referral§of the North construction of additional or replacement wastewater Carolina -licensed Professional Engineer to the licensing board. 10. In the event tha t the wastewater collection facilities fall to perform satisfactorily, Including the creation of nuisance conditions, the Permittee shall take immediate o additional ortreplacement faciive action, dt'�ties..ing those as may be required by this Division, such as the construction 11. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules,ent g regulations, or ordinances that may be imposed by other gover applicable genderuffer (local,Z stateA NCAC and federal) which have jurisdiction, including but not limited to pp 2B .0200, erosion and sedimentation control requirements In 15A NCAC Chds under under the D vis0 n's General Permit NCG010000, and any requirements pertaining to and 15A NCAC 2H .0500. Fast Track Engineering Certification Permittee: Provo Land Exchange III, LC. Permit No: WQ0037203 Project: Wayne Preparatory Academy -Phase 1 Issue Date: 6/19/2014 Complete and submit thls form to the permit Issuing regional office with the following: • One copy of the project record drawings (plan & profile views and detail drawings of sewer lines) of the wastewater collection system extension. Final record drawings should be dear on the plans or on digital media (CD or DVD disk) in pdf format. Record drawings should Indicate the design and the marked up changes during construction. • Supporting design calculations {selected;pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be dearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria, Modifications should be submitted prior to certification. This protect shall not be considered complete nor allowed to operate until the Division has received this Engineer's Certification and all required supporting documentation. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. PERMITTEE'S CERTIFICATION I, , the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Tttle ' Signature Date ENGINEER'S CERTIFICATION ❑ Partial ❑ Final I, , as a duty registered Professional Engineer In the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of a 190-gallon per minute pump station with duplex pumps, on -site audible and visual high water alarms, telemetry, and permanent generator with automatic transfer switch; as well as approximately 1,243 linear feet of 6-inch gravity sewer, and approximately 320 linear feet of 4 inch force main to serve as part of the Wayne Preparatory Academy — Phase 1 project, for the Permittee hereby state that, to the best of my abilities, due' care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS DWR-WATER QUALITY OPERATIONS SECTION SUPERVISOR WASHINGTON REGIONAL OFFICE 943 WASHINGTON SQUARE MALL WASHINGTON, NC 27889 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater. collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. DWR Use Only Flow from this protect is tributary to: