HomeMy WebLinkAboutWQ0037203_Permit (Modification)_20171020ado
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
Water Resources
ENVIRONMENTAL QUALITY
October 20, 2017
Brad Coburn, CFO
AEP Charter Wayne, LLC
222 SW Columbia, Ste. 1750
Portland, Oregon 97201
Subject: Permit No. WQ0037203 Modification
AEP Charter Wayne, LLC
Wayne Preparatory Academy Phase II
Wastewater Collection System Extension Permit
Wayne County
Dear Mr. Coburn:
In accordance with your application received October 17, 2017, we are forwarding herewith Permit No.
WQ0037203 Modification dated October 20, 2017, to the AEP Charter Wayne, LLC for the construction
and operation upon certification of the subject wastewater collection system extension. This permit
shall be effective from the date of issuance until rescinded, shall void Permit No. WQ0037203 issued
June 19, 2014, and shall be subject to the conditions and limitations as specified therein. This cover
letter shall be considered a part of this permit and is therefore incorporated therein by reference.
This permit modification is for the discharge of an additional 4,368 gallons per day from the originally
permitted discharge. of 6,955 gallons .per day due to a building expansion to accommodate an
additional 336 students.
Please pay particular attention to the following conditions contained within this permit:
Condition 11.1:
Condition 11.4:
This permit shall not be automatically transferable; a request must be made and
approved.
Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 2T .0403- or any individual system -wide collection system
permit issued to the Permlttee.
It shall be the responsibility of AEP Charter Wayne, LLC to ensure that the as -constructed project meets
the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with
North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or
replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional
Engineer to the licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right
to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. -
State of North Carolina I Environmental Quality I Water Resources
943 Washington Square Mail I Washington, North Carolina 27889
252 946 6481
!'
AEP Charter Wayne, LLC
Wayne Preparatory Academy, Phase II
Permit No. WQ0037203 Modification
October 20, 2017
This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina
General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,
NC 27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Allen Clark at (252) 948-3918
or via e-mail at allen.clark@ncdenr.gov.
• Sincerely,
'R4,1- -re-J*4
for S. Jay Zimmerman, P.G.
Director, Division of Water Resources
by Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
cc:
Robert Balland, PE (electronic copy)
Bert Sherman Su •eri _: I _: it City of Goldsboro Water Reclamation Facility (electronic copy)
1701Alt It
Water Resources Central Files
PERCS (electronic copy)
Page 2 of 8
STATE OF NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENTAL QUALITY
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
AEP Charter Wayne, LLC
Wayne County
for the construction and operation of a 190-gallon per minute pump station with duplex pumps, on -site
audible and visual high water alarms, telemetry, and permanent generator with automatic transfer
switch; as well as approximately 1,243 linear feet of 6-inch gravity sewer, and approximately 320 linear
feet of 4 inch force main to serve a school with gym but no traditional cafeteria (914 students) plus, pre-
kindergarten facility (47 persons) as part of the Wayne Preparatory Academy — Phase II project, and the
discharge of 11,323 gallons perday of collected domestic/commercial wastewater into the City of
Goldsboro's existing sewerage system, pursuant to the application received October 17, 2017 and in
conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February
12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump
Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently
filed and approved by the Department of Environment and Natural Resources and considered a part of
this permit.
Permit Modification History
This permit modification is for the discharge of an additional 4,368 gallons per -day from the originally
permitted discharge of 6,955 gallons per day due to a building expansion to accommodate an additional
336 students.
for S. Jay Zimmerman, P.G.
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number:
Permit Issued:
WQ0037203 Modification
October 20, 2017
Page 3 of 8
SUPPLEMENT TO PERMIT COVER SHEET
AEP Charter Wayne, LLC is hereby authorized to:
Construct, and then operate upon certification the aforementioned wastewater collection extension.
The sewage and wastewater collected by this system shall be treated in the City of Goldsboro Water
Reclamation Facility in accordance with Permit Number NC0023949.
Permitting of this project does not constitute an acceptance of any part of the project that does not
meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as
applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations
and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division
approval is based on acceptance of the certification provided by a North Carolina -licensed Professional
Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed
project meets the appropriate design criteria and rules.
Construction and operation is contingent upon compliance with the Standard Conditions and any Special
Conditions identified below. -
SPECIAL CONDITIONS
1. No flow in excess of the quantity permitted herein, 11,323 Gallons Per Day, shall be made tributary
to the subject sewer system until an application for permit modification for an increase in flow has
been submitted to and approved by the Division. [15A NCAC 02T.0304(b)]
2. The abandonment of any existing wastewater facilities including septic systems being replaced by
new sewer infrastructure shall be done in accordance with the applicable agency having compliance
oversight on such facilities. [15A NCAC 02T.0105(c)(6)]
II. STANDARD CONDITIONS
1. This permit shall not be transferable. In the event there is a desire for the wastewater collection
facilities to change ownership, or there is a name change of the Permittee, a formal permit request
shall be submitted to the Division accompanied by documentation from the parties•involved, and
other supporting materials as may be appropriate. The approval of this request shall be considered
on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)]
2. This permit shall become voidable unless the wastewater collection facilities are constructed in
accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for
the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and
other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110]
3. This permit shall be effective only with respect to the nature and volume of wastes described In the
application and other supporting data. [15A NCAC 02T .0110]
4. The wastewater collection facilities shall be properly maintained and operated at all times. The
Permittee shall maintain compliance with an individual system -wide collection system permit for the
Page 4 of 8
operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual
permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]:
a. The sewer system shall be effectively maintained and operated at all times to prevent discharge
to land or surface waters, and to prevent any contravention of groundwater standards or
surface water standards.
b. A map of the sewer system shall be developed and shall be actively maintained.
c.
An operation and maintenance plan including pump station inspection frequency, preventative
maintenance schedule, spare parts inventory and overflow response has been developed and
implemented.
d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e.
365 days per year). Pump stations that are connected to a telemetry system shall be inspected
at least once per week.
e. High -priority sewer lines shall be inspected at least once per every six -months and inspections
are documented.
f. A general observation of the entire sewer system shall be conducted at least once per year.
g. Overflows and bypasses shall be reported to the appropriate Division regional office in
accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North
Carolina General Statute §143-215.1C.
h. A Grease Control Program is in place as follows:
1. For public owned collection systems, the Grease Control Program shall include at least
biannual distribution of educational materials for both commercial and residential users and
the legal means to require grease interceptors at existing establishments. The plan shall also
include legal means for inspections of the grease interceptors, enforcement for violators and
the legal means to control grease entering the system from other public and private satellite
sewer systems.
2. For privately owned collection systems, the Grease Control Program shall include at least bi-
annual distribution of grease education materials to users of the collection system by the
permittee or its representative.
3. Grease education materials shall be distributed more often than required in Parts (1) and (2)
of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows.
i. Right-of-ways and easements shall be maintained in the full easement width for personnel and
equipment accessibility.
j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of
three years with exception of the map, which shall be maintained for the life of the system.
5. The Permittee shall report by telephone to a water resources staff member at the Washington
Regional Office, telephone number (252) 946-6481, as soon as possible, but in no case more than 24
hours, following the occurrence or first knowledge of the occurrence of either of the following:
Page 5 of 8
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.; or
b. Any SSO and/or spill over 1,000 gallons; or
c. Any SSO and/or spill, regardless of volume, that reaches surface water
Voice mail messages or faxed information is permissible, but this shall not be considered as the
initial verbal report. Overflows and spills occurring outside normal business hours may also be
reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919)
733-3300. Persons reporting any of the above occurrences shall file,a spill report by completing and
submitting Part I of Form CS-SSO (or the most current Division approved form) within five days
following first knowledge of the occurrence. This report must outline the actions taken or proposed
to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current
Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-
215.1C(a1)]
6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to
interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater
to the surface waters of the State. [15A NCAC 02T.0108(b)]
7. Upon completion of construction and prior to operation of these permitted facilities, the completed
Engineering Certification form attached to this permit shall be submitted with the required
supporting documents to the address provided on the form. A complete certification is one where
the form is fully executed and the supporting documents are provided as applicable. Any
wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Engineer's Certification shall be considered a violation of -the permit and shall subject the
Permittee to appropriate enforcement actions.
If the permit is issued to a private entity with an Operational Agreement, then a copy of the
Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been
appropriately filed with the applicable County's Register of Deeds office shall be submitted with
the certification.
A complete certification is one where the form is fully executed and the supporting documents are
provided as applicable. Supporting documentation shall include the following:
a. One copy of the project construction record drawings (plan & profile views of sewer lines &
force mains) of the wastewater collection system extension. Final record drawings should be
clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings
that are marked up or annotated with after construction Information and show required buffers,
separation distances, material changes, etc.
b. One copy of the supporting applicable design calculations including pipe and pump sizing,
velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage,
surge protection, detention time in the wet well, and force main, ability to flush low points in
force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power
source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, include travel
timeframes, shall be provided.
Page 6 of 8
c. Changes to the project that do not result in non-compliance with this permit, regulations, or the
Minimum Design Criteria should be clearly identified on the record drawings, on the certification
in the space provided, or in written summary form.
Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting
in non-compliance with this permit (including pipe length increases of 10% or greater, increased
flow, pump station design capacity design increases of 5% or greater, and increases in the
number/type of connections), regulations, or the Minimum Design Criteria. Requested
modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis
and each on its own merit. Please note that variances to the Minimum Design Criteria should be
requested and approved during the permitting process prior to construction. After -construction
requests are discouraged by the Division and may not be approved, thus requiring replacement or
repair prior to certification & activation. [15A NCAC 02T .0116]
8. Gravity sewers installed greater than ten percent below the minimum required slope per the
Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified
until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been
examined, a slope variance can be requested from the Division with firm supporting documentation.
This shall be done through a permit modification with fee. Such variance requests will be evaluated
on a case -by -case basis. Resolution of such request shall be evident prior to completing and
submitting the construction certification. [ 15A NCAC 02T.0105(n)]
9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life
of the wastewater collection facilities. [15A NCAC 02T .0116]
10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the
Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Station and force Mains adopted
June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an
enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A
through §143-215.6C, construction of additional or replacement wastewater collection facilities,
and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A
NCAC 02T .0104; 15A NCAC 02T .0108(b-c)]
11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or replacement
facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)]
12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or
Local government agencies which have jurisdiction or obtaining other permits which may be
required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-
215.1(b)]
Page 7 of 8
1
FAST TRACK SEWER ENGINEERING CERTIFICATION
PERMITTEE:
PERMIT #:
PROJECT:
ISSUE DATE:
AEP Charter Wayne, LLC
WQ0037203 Modification
Wayne Preparatory Academy Phase II
October 20, 2017
This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of
this permit until the Division has received this Certification and all required supporting documentation.
It should be submitted in a manner that documents the Division's receipt. Send the required
documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at
the bottom.
Any wastewater flow made tributary to the wastewater collection system extension prior to completion
of this Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up
until a final certification is received. A Final Certification shall be a complete set of record drawings and
design calculations regardless of whether partials have been submitted.
PERMITTEE'S CERTIFICATION
I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant
to the applicable standards & requirements, the Professional Engineer below has provided applicable
design/construction information to the Permittee, and the Permittee is prepared to operate & maintain
the wastewater collection system permitted herein or portions thereof.
Printed Name, Title
Signature Date
ENGINEER'S CERTIFICATION
as a duly registered Professional En ineer in the State of North Carolina,
having been authorized to observe (n periodically, n weekly, II full time) the construction of the
project name and location as referenced above for the above Permittee hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the
Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12,
1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump
Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials.
North Carolina Professional Engineer's Seal w/signature & date:
❑ Final ❑ Partial (include description)
Certification Comments/Qualifiers (attach If necessary):
NC DWR — Water Quality Regional Operations Section Address City, NC Zip Code
Regional Regional Office Phone: (XXX)-XXX-XXX FAX: (XXX)-XXX-XXXX