Loading...
HomeMy WebLinkAboutNCG030427_SW Permit DOSA_20220916NC Department of Environmental Quality Division of Energy, Mineral and Land Resources E.rl : ip'orm.nfcai f�uuFity Storm- titer Permit tion of Sig -nature Authority Form Directions are in red. => This farm shall be used to delegate signature authority from than perm t Owner (Fer ittee) to another pares. Only the Responsible Official' defined below may submit permit applications and reports required by the permit (such as Data Monitoring Reports and Annual Reports) until this form is completed and submitted to the DEMLR Stormwater Program. Please mote that delegating signature authority does not relieve the Permit Omer from the responsibility for permit compliance. The permit Owner�is the legal entity to whichfwhom a permit has been issued.. and maybe an individual oran organization such as a company orgovernment agency. Rvany ©vdrre; is recluire d to nave a Responsible Official who meets the legal signature authority requirements in 40 1.22 2?, summarized below. For a corporation, the Responsible Officiaf shall be a president, secretary, treasurer,, or vrce- president in charge of a principal business function, or another- individual who perfonrs simiier functions for the conooration, or the manager of one or more manufacturing, production, or operating facfl;tles who is authorized o make management decisions about free f,cility operation. For a partnership, or sole proprietorship, the Responsible Official shall be a general partner or the proprietor, respectively; or For a municipalky, State, Federal, or ob; er public agency., the Responsible Official sha=i be either a principal executive aff°cer [City/County Maragerl or ranking elected official [Mayor]. => Ever; if delegated signatory authoritl has been delegated to another individual, :he Responsible Official retains responsibility for compliance with per, iiit ccnditions. Organization dame: GKN Drivel Alamance Responsible Official Name: Gregory Brinker Responsible Official Title: Plant Director Email Address: gregory.brinker@gknautomotive.com Phone 919-304-7200 Mailing Address`. 1067 Trollingwood Hawftelds Rd City: Mebane I State: NC I 2iP 27302 Stormwater Delegation of Signature Authority Form Page 1 A. Persons to Receive Signatory Authority =:> The signatures of the persons listed below indicates their acceptance of signatory authority. Delegated Party Name: Lauren Lowe Delegated Party Title: Environmental, Health, and Safety Permit Number: NCG030427 Email Address: lauren.lowe@gknautomotive.com I Phone: 919-304.7336 Mailing Address: 1067 Trollingwood Hawfields Rd City: Mebane I State: NC I Zip: 27302 Signature of Delegated Party indicating acceptance of Signatory Authority: C�Lmm C�4� Date: Delegated Party Name: Jorge Sotoperez Delegated Party Title: Healthy & Safety Permit Number: NCG030427 Email Address: jorge.sotoperez@gknautomotive.com Phone: 919-304-7200 Mailing Address: 1067 Trollingwood Hawfields Rd City: Mebane State: NC Zip: 27302 Signature of Delegated Party indicating acceptance of Signatory Authority: II .,.J. S'r'I Date: at I kZ (z.t Delegated Party Name: Nathaniel Lee Delegated Party Title: Quality & Risk Manager Permit Number: NCG030427 Email Address: nathaniel.lee@gknautomotive.com Phone: 919-304-7200 Mailing Address: 1067 Trollingwood Hawfields Rd City: Mebane I State: NC I ZIP: 27302 Signature of Delegated Party indicating acceptance of Signatory Authority: _f Date: C1 ,- l - ZZ Delegated Parry Name: Delegated Party Title: Permit Number: Email Address: Phone: Mailing Address: City: State: Zip: Signature of Delegated Party indicating acceptance of Signatory Authority: Date: Stormwater Permit Delegation of Signatory Authority Form Page 2 B. Responsible Official Signature The Responsible Official, as identified in accordance with 40 CFR 122.22, is the appropriate individual with the authority to sign and submit reports for the organization. As the Responsible Official, I, Gregory Brinker (printed name), have the authority to enter into this Agreement for GKN Drivel Alamance (Owner/Organization Name). I request that the DEMLR Stormwater Program include the persons listed in Part A of this form signatory authority for the above -named permit. I acknowledge that 1, and the persons listed in Part A of this form work at/for my organization and have authority to act as a signatory for purposes of the NCDEQ's electronic document systems. By submitting this application, 1, Gregory Brinker (printed name), have read, understand, and accept the terms and conditions of the stormwater permit(s) for which I am the Responsible Official. . M Responside 6fficial Signature yy / j -} R..4 b,VICAor Title Date Stormwater Permit Delegation of Signatory Authority Form Page 3