Loading...
HomeMy WebLinkAbout20181598_Final CP4B Meeting Minutes_20141010 FINAL MINUTES OF INTERAGENCY 4B MEETING PROJECT R-1015 (HAVELOCK BYPASS) August 20, 2014 Team Members: See attached Participants: See attached R-1015 NCDOT Hydraulics began the meeting at 2:45 p.m. following the Avoidance and Minimization(4A)meeting. The first issues addressed were the changes that have occurred since the previous 4B Meeting on June 20, 2002 followed by a general discussion of the project. These issues include the following: • The project is now labeled R-1015 and includes the previous separate projects R-1015A and R-1015B. • The project has been converted from metric to English. • The typical section now includes a 46' median and 10' paved outside shoulders. • The culvert at Tucker Creek is now extended both up and downstream. Previously the extension was only on the upstream side. This may be an area of environmental concern (AEC)with CAMA. DCM will further investigate. Wetlands and streams have been re-verified in 2013, and the wet file has been updated. (See CCP 4A meeting minutes.) • There have been several changes in personnel with the team members since 2002. • The project is still mostly on fill except for the tie-ins at both ends of the project. • In 2002, USACE noted that as long as new roadway ditches are at the same elevation as the existing roadway ditches that no additional impacts would need to be considered to the wetlands adjacent to the new ditch. This is still the case. • In 2002, CAMA wanted equalizer pipes buried 1'. This is no longer the case. Now the pipes will not be buried 1'. • In 2002, it was noted that it is acceptable to place 2GI's (median drainage inlets) on equalizer pipes. It is still acceptable, as long as the boxes are not very deep and the cross pipe is not that large. • Bridge deck drains are not discharging directly over surface waters. • There will be further discussions to see if impacts with detours on—Y3- and—Y4- are permanent or temporary. • Temporary work bridges will be used during construction of both bridges and need to be noted on permit drawings. • Hydraulic Design is complete. Bridge and Culvert Reports are complete and are included with the 4B packet. • Southwest Prong of Slocum Creek and Tucker Creek both have "in-water"moratoriums according to DEIS. • Note that the wetlands extend beyond the right-of-way line, but the wetlands were clipped at the right- of-way line in these drawings. R-1015 CCP 4B Draft meeting minutes August 20, 2014 With no further comments or discussion,NCDOT proceeded to discuss the project sheet by sheet. Attached to these minutes are pdf files with suggested revisions to the drainage plans. Plan Sheets Only sheets with comments are noted below. Sheet 4 The existing pipes will be extended at the beginning (-L- Sta. 33+00 +/-) of the project. This is non- jurisdictional stream. Sheet 7 EPA suggested using the teardrop-shaped area inside the loop as treatment for the stormwater if the area would be a total take. The feasibility was discussed. The team decided to keep this area as is, and it would not be a total take for the permit drawings. Clearing limits will be 10' beyond the slope stake line. The team mentioned that any small wetland less than 1/4 acre would be considered a total take. The team concurred that equalizer pipes used on this project do not need their inverts buried 1 foot. Sheet 10 Add equalizer pipe in vicinity of wetland around Station 130+00—L-per USACE recommendation. Sheet 12 Add equalizer pipe in vicinity of wetland around Station 158+50—L- and Station 161+50—L-per USACE recommendation. Fix property owner name to say"United States Department of Agriculture" for Croatan National Forest (CNF)property per USFS. Sheet 13 The proposed bridge (total length=1620' with 12 spans at 135' on 72"pre-stressed concrete modified bulb tees) at East Prong of Slocum Creek (Jurisdictional Stream `S 1')was discussed. DWR suggested using rip rap pads to prevent erosion in the vicinity of deck drains. The vertical clearance on this bridge ranges from 6' to 18'. There will be further discussions with Division to see if some rip rap pads are warranted to disperse the flow. There were similar deck drain situations on the Washington Bypass. The bridge over East Prong of Slocum Creek will require a temporary work bridge. Sheet 14 Account for rip rap pads in permit drawings. Sheet 15 Move equalizer pipe from Sta. 210+00—L- to Sta. 208+50—L-. R-1015 CCP 4B Draft meeting minutes August 20, 2014 Sheet 17 -Y3- Detour impacts will be considered temporary impacts. DWR suggested showing anything inside the temporary slope stakes as temporary impacts. If re-vegetation does not occur, then it will be considered permanent impacts. DCM suggested putting in geotextile fabric under temporary impacts. The stream shown on Sheet 17 is Jurisdictional Stream `S6'. It was also suggested by the team to use enlargements where necessary. Sheet 18 Jurisdictional stream (`S9') is shown at the end of driveway around Station 267+00—L- (Lt). No impacts are indicated at this location. Sheet 19 Jurisdictional Stream (`S9')will be impacted. There will be stream and buffer impacts at this location. If there is fill outside the R/W, an easement will be required. This stream was not on previous wetland files. Sheet 20 Southwest Prong of Slocum Creek (Jurisdictional Stream `S 10')will have buffer impacts due to interior bents located in the buffer zone. There will also be temporary impacts due to the work bridge at this location. The proposed bridge will have a total length of 945' and will use 72"modified bulb tees (7 spans at 135'). There will be easements added in the vicinity of the fill slopes near the bridge. Deck drains at this location will be discussed with DCM, Area Bridge Engineer and Division personnel. Sheet 21 Angle the cross pipe in the vicinity of Station 310+00-L- to match wetland angle. Sheet 22 Wetland on this sheet will be a total take. Sheet 23 An easement may be required alongside the proposed ditch. The proposed ditch should match the invert of the existing wetland. May add note, "Do not cut below wetland elevation" at this location. This wetland will be a total take. Sheet 24 The beginning of this sheet(Station 338+00—L-) is the beginning of the RCW habitat. The right of way is reduced from 250' to 200' for the next several sheets. There are some easements in this stretch of the project. USFWS indicated that small deviations from the 200' requirement would be ok as long as the majority of the project in this area is within 200'. The old recovery plan that used 200' is being updated and the new distance will be greater than 200'. The update will not take place any time soon. NCDOT Hydraulics may change the cross pipe at Station 342+50—L- to go diagonally across—L- to reduce R-1015 CCP 4B Draft meeting minutes August 20, 2014 footprint. Per Division, this project will use Method 3 clearing. Label easements as temporary or permanent. Sheet 25/26 Label easements as temporary or permanent. Easements shown are temporary construction easements. Sheet 27 At Station 393+00—L- is the end of the RCW habitat. Right of way limits goes from 200' to 250' here. Add equalizer pipe near Station 393+75 —L- (near the right edge of the sheet). Sheet 32 Verify the cross pipe around Station 459+00—L- is not for a jurisdictional stream. Add equalizer pipe at Station 463+50—L-. Sheet 33 NCDOT will verify if toe protection can be removed near Station 470+60—L-. Sheet 34 Remove pipe at Station 487+00—L-. The team agreed that is was ok to have 2GIs in median on cross pipes as long as the pipe is not very large and the cross pipe is not very deep. Sheet 36 Verify fill slope lines around bridges (including bridges that cross railroads). There is a proposed culvert at UT to Tucker Creek (double 10'x8' RCBC). Fix label inside culvert report on plan view. This is a Jurisdictional Stream(S22/S23). Show Buffer Zones. Sheet 41 Rip rap was added near the Havelock City Limit to prevent headcutting near the channel. This is not a Jurisdictional Stream. Sheet 44 -Y3- detour impacts will be temporary wetland impacts. Sheet 45 If the pond is a JS (S20b), there should be buffer zone lines around the entire pond. Upstream is JS (S20a). Sheet 46 Double 72"pipes are located at JS (S 19b and S 19a). Show Buffer Zones lines correctly. R-1015 CCP 4B Draft meeting minutes August 20, 2014 Sheet 47/48 Tucker Creek is Jurisdictional (S30a/S30b). Show Buffer Zones. The proposed culvert extension(3@ 9'x7' RCBC) is both upstream and downstream. Originally there was an extension only on the upstream side. There is no low flow barrel. Normal water depth is approximately 5'. This may be an area of environmental concern/public trust area. This finding may trigger a CAMA permit. DCM will make a determination at this site. End of sheet discussion. NCDOT showed the team some GIS layers that could be made available if the team would like them. These layers show the project location, design, and impacts. This is not an official product that NCDOT produces. The team would like to have this information if available. NCDOT asked the team to provide feedback on this information as well as other ways to improve the effectiveness of the meetings and the review process. The meeting adjourned at 5:00 p.m. Addendum: See DCM response in attached email (No CAMA permit required; concurrence needed) Morgan, Stephen R Subject: R-1015; CP-4A&CP-4B meeting; Division 2 - Craven County Location: DOT Structure Design Conf Rm C (Cap.40) Start: Wed 8/20/2014 1:00 PM End: Wed 8/20/2014 5:00 PM Recurrence: (none) Meeting Status: Accepted Organizer: DOT PDEA INTERAGENCY MEETING CALENDAR Required Attendees: Devens, Thomas E; Ron.Lucas @dot.gov; Tom Steffens; Gary Jordan; Travis Wilson; David Wainwright; Fritz Rohde; 'kcompton @fs.fed.us'; Gledhill-earley, Renee; 'jessi.baker @ncdenr.gov'; Steve Sollod ; Speer, James A; Mumford, Glenn W; Rouse, John W; Eatmon, Bryce E; Morgan, Stephen R, Billings, Amy A; Ford, Tris B; Beauregard, Rachelle; Cashin, Gordon E; Frazer, Mary E; Parker, Cyrus F; Fischer, Kevin; Stutts, David S; Cox, Hardee R; Hanson, Robert P;Yamamoto, Brian F;James, Larry M; Ipaul.koch @stantec.com'; 'amy.sackaroff @stantec.com'; Van Der Wiele, Cynthia (Van DerWiele.Cynthia @epa.gov); 'pflanagan @eccog.org'; Chris Militscher; Stephen Lane; Bouscluet, Corey D; Harris, David B; DOT IT Meet Me Conf 919-662-4553 Optional Attendees: Chapman, Amy; 'Clarence Coleman'; George Hoops; Henry Wicker, Thomas P.Wilber, Walter, Tracy A; Barbour, Deborah M; Barbour, Victor, Bourne, John S; Childrey, Tom; Cook, Alena R; Dunlop, James H; Fuller, Gregory A; Griffin, Randy W; Hancock, Richard W; Harris, Philip S; Ishak, Doumit Y; Ishak, Joseph;Johnson, Benjetta L;Joyner, Drew; Kite, Steve; Kuse, Jessica D; Lee, Donald G; Marshall, Travis K; Mathis, Stonewall D; Mcintyre, Ray; Medlin, Kenneth N; Memory, John R; Murphy, Brian G; Murphy, Christie; Paugh, Leilani Y; Pilipchuk, John L; Rivenbark, Chris; Rochelle, Rodger D; Ronnie Smith; Staley, Mark K; Thomas, Earlene W; Twisdale, John W;Alexander, Pamela L; Evans, Cheryl L; Boyd, David A; Kim, K J; Hauser,James W; Mellor, Colin Please note the meeting start and end times have been modified. Meeting time is subject to change until 2 weeks before meeting day. Entire agenda can be found at our new web location: htips:Hconnect.ncdot.gov/resources/Environmental/Pages/Merger-Process-Guide.aspx Meeting material is available online t: http://207.4.62.65/PDEA/Mery,erMeetiny,s/08202014_R1015_CNA_CP4B/ Time: Requestor: STIP No. R-1015: US70— Havelock Bypass Ted Devens from north of Pine Grove to north of the 1:00pm-5:00pm Carteret County line Division 2 County: Craven Purpose: CP-4A & CP-4B TEAM MEMBERS: i FHWA— Ron Lucas EPA—Cynthia Van Der Wiele USACE—Tom Steffens EPA—Chris Militscher USFWS—Gary Jordan RPO— Patrick Flanagan (Down East) NCWRC—Travis Wilson SHPO— Renee Gledhill-Early DWR— David Wainwright DMF—Jessi O'Neal Baker NMF— Fritz Rohde DCM —Steve Sollod USFS— Karen Compton DCM— Stephen Lane SUPPORT STAFF: Roadway—Jim Speer Structures— Kevin Fischer Roadway—Glenn Mumford Structures— David Stutts Division —John Rouse TIP— Hardee Cox Division — Ed Eatman PDEA— Rob Hanson Hydraulics—Stephen Morgan PDEA— Brian Yamamoto Hydraulics—Amy Billings PDEA—Ted Devens HES—Tris Ford Geoenvironmental —Cyrus Parker NES - Rachelle Beauregard Utilities—Larry James,Jr. NES—Chris Rivenbark Utilities—Corey Bousquet NES—Gordon Cashin Consultant— Paul Koch, Stantec NES— Mary Frazer Consultant—Amy Sackaroff, Stantec Roadside— Mark Staley Consultant—Joseph Carter, III Roadside— David Harris ......................................................................................................................................... . ..'.. ..... .. ..I..'.. ...... : .'.. .. N7 s.../../meet...ncc�;c�t..c ov/twalter/RI<3YS4L(� F,i,rst...on.I..i!n.�....rn;ee. i.!... ......................................................................................................................................... Call-in number (919) 662-4553 mill coricslpoindoinco i,o and from dhis sondor is subjcc�[o firs N C I:'a.alnlic IRccords I aw r and nroy Ins dlscl�srad�o dhird Ipartics, 2 R-1015 HAVELOCK BYPASS MERGER PROCESS 4b MEETING WEDNESDAY AUGUST 20, 2014 Sign in Sheet NAME ORGANIZATION PHONE NUMBER V (AA �4m&wtj�jn AICDO-r- C A Pr- 6�rvv L-1 Sz, c Z9) '2 ZLZ4 o-� T- 3 cl A)15 (("A A)c-DOT AJ6 f -70 1 cl Z- 4,7,6 q 47 3 2 70 7 62'1';L 10 7 /F Avv--1 Xkl/ X <" 11 - 7 0,2 6 7�,2-6 0 6 fjC� -7c,,-7 IQ -0c Ypo 3,2- From: Sollod,Steve To: Morgan, Stephen R; Devens,Thomas E; Ron.Lucas(abdot.aov;Tom Steffens;Gary Jordan;Wilson,Travis W.; Wainwriaht.David; Fritz Rohde; "kcompton(abfs.fed.us";Gledhill-earlev. Renee; Baker, Jessi E; Speer. James A; Mumford,Glenn W; Rouse,John W; Eatmon, Bryce E; Billings,Amy A; Ford,Tris B; Beaureaard. Rachelle; Cashin. Gordon E; Frazer. Mary E; Parker, Cyrus F; Fischer. Kevin; Stuffs. David S; Cox. Hardee R; Hanson. Robert P;Yamamoto, Brian F;James. Larry M; "paul.koch(cbstantec.com"; "amy.sackaroff(dstantec.com";Van Der Wiele. Cynthia (Van DerWiele.Cvnthia(d)epa.aov); "pflanaaan(a)eccoa.ora"; Chris Militscher; Lane. Stephen; Bousauet. Corey D; Harris,David B; Patel.Janaki H; Radakovic, Brian M Cc: Billinas,Amy A Subject: RE: R-1015-Craven County; CP-4B draft meeting minutes from August 20,2014 Date: Tuesday,September 09,2014 11:10:14 AM The draft minutes of the 8/20/14 Havelock Bypass 4B meeting state the following: • The culvert at Tucker Creek is now extended both up and downstream. Previously the extension was only on the upstream side. This may be an area of environmental concern (AEC) with CAMA. DCM will further investigate. DCM has determined by field verification that Tucker Creek is not navigable for a considerable distance downstream of US 70 and is not considered a CAMA Area of Environmental Concern (AEC) in the area of the proposed culvert work. Therefore, the Havelock Bypass (R-1015) will not require a CAMA Permit. However, the issuance of a USACE Individual Permit for a project located in one of the 20 coastal counties that make up the coastal zone requires that the applicant certify, and DCM to concur with the certification, that the project is consistent with the NC coastal management program. Please make a note of this in the final meeting minutes. Thanks, Steve From: Morgan, Stephen R Sent: Monday, September 08, 2014 8:05 AM To: Devens, Thomas E; Ron.Lucas @dot.gov; Tom Steffens; Gary Jordan; Wilson, Travis W.; Wainwright, David; Fritz Rohde; 'kcompton @fs.fed.us'; Gledhill-earley, Renee; Baker, Jessi E; Sollod, Steve; Speer, James A; Mumford, Glenn W; Rouse, John W; Eatmon, Bryce E; Billings, Amy A; Ford, Tris B; Beauregard, Rachelle; Cashin, Gordon E; Frazer, Mary E; Parker, Cyrus F; Fischer, Kevin; Stutts, David S; Cox, Hardee R; Hanson, Robert P; Yamamoto, Brian F; James, Larry M; 'paul.koch @stantec.com'; 'amy.sackaroff @stantec.com'; Van Der Wiele, Cynthia (VanDerWiele.Cynthia @epa.gov); 'pflanagan @eccog.org'; Chris Militscher; Lane, Stephen; Bousquet, Corey D; Harris, David B; Patel, Janaki H; Radakovic, Brian M Cc: Billings, Amy A Subject: RE: R-1015 - Craven County; CP-4B draft meeting minutes from August 20, 2014 Please respond with any comments in two weeks- by September 19, 2014. Thanks Draft meeting minutes can be found at: http://207.4.62.65/PDEA/MergerMeetings/08202014_R1015_CP4A_CP4B/ Let me or Amy Billings know if you have any corrections or additional comments. Thanks, Stephen Stephen R. Morgan PE NCDOT Hydraulics Unit Project Engineer Western Region (TIP) Phone (919) 707-6739 Fax (919) 250-4108 :::mall corrosloondonco i�o and froni ihis scindor is subjcc�Ro dho N C ::lublic :Rccords I ow and may bc dlscli,rGcd Ro dhird partics