Loading...
HomeMy WebLinkAboutSWA000163_Email_20220931 Farkas, Jim J From:Farkas, Jim J Sent:Wednesday, August 31, 2022 1:29 PM To:kcaldwell@geosciencegroup.com Cc:bwalden@madisoncagroup.com; sgregory@geosciencegroup.com Subject:RE: SWA000163 Madison Park Kevin, I was looking over the information you provided on 8/17/2022. Everything looks good except for a few small issues: Please correct the following: - Part E-5 of the Application: o Please include the total surface water area located within the total property area in this table. Surface water area is the area between the banks of a blue line stream as shown on a USGS topographic map. Per provided submittal items, there are surface waters located along the south and west portions of the property area. o The provided project density calculation appears to be incorrect. Since there is no existing BUA shown on the plans or in the Application, the project density would be calculated using the following equation: \[Proposed New BUA\] / \[Total Project Area\] * 100%. Using the provided values (432,115 sf for \[Proposed New BUA\] and 589,367 sf for \[Total Project Area\]) does not result in a project density of 80%. Please revise as needed. NOTE: This value is the density of the project area, not the density for the drainage area to the proposed SCM. - Please provide 2x hard copies of the site survey (attached) showing the bearings and distances for the project area (2x hard copies of plan sheet C1.1, dated 6/15/22, were provided during the administrative completeness review that show the bearings and distances for the project area, however this electronic file was not uploaded (only the 8/15/22 version of plansheet C1.1 was uploaded and this plansheet does not show the full extents of the project area)) - Please upload an electronic copy of the Secretary of State information (required per Part F7 of the Application). This information did not appear to have been uploaded with the other items. While not required to receive an Authorization to Construct (ATC) permit, the following items were noted during review (NOTE: The ATC review/approval process is not a detailed engineering review, we are only looking to see if the proposed design has the potential to meet the treatment requirements once completed, not to see if the proposed design will actually meet all of the treatment requirements once completed): - Please ensure that the latest version of the rules (The 2017 Rules) are being used. The rules can be found at the following link: https://deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-rules-and-regulations, the latest version of the Stormwater Design Manual can be found at the following link: https://deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/stormwater-design, and the latest version of the Supplement-EZ Form can be found at the following link: https://deq.nc.gov/about/divisions/energy-mineral-and-land- resources/stormwater/stormwater-program/stormwater-design - It is recommended to move the location of the outlet structure of the wet pond further away from the inlets of the wet pond so as to avoid short-circuiting the wet pond (required per Wet Pond MDC 4). Please provide the following: - 2x hard copies & 1x electronic copy of the revised pages of the ATC Application form. - 2x hard copies of the attached site survey. - 1x electronic copy of the Secretary of State information 1 - 2x hard copies & 1x electronic copy of any other items needed in order to address these comments. Hard copies should be mailed to me at the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Electronic copies should be uploaded at the following location: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Since these are really minor things, once I get the hard copies, anything else that may have changed from addressing these issues, and the documents are uploaded to Laserfiche (Provided everything is still in order), we can issue the permit without doing another formal review. Let me know if you have any questions. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral, & Land Resources – Stormwater Program 512 N. Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 (919) 707-3646 Jim.Farkas@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or 2 are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tran, Kieu M <kieu.tran@ncdenr.gov> Sent: Wednesday, August 24, 2022 11:19 AM To: bwalden@madisoncagroup.com; kcaldwell@geosciencegroup.com Cc: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Khan, Zahid <zahid.khan@ncdenr.gov> Subject: SWA000163 Madison Park Good Morning, We received your post-construction stormwater permit Authorization to Construct (ATC) application for the above mentioned project on 8/17/2022. Reviews under the fast track permitting process generally take 30 calendar days. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SWA000163 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Mrs. Kieu Tran Stormwater Program Administrative Assistant Office: (919) 707- 3640 Kieu.Tran@ncdenr.gov North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources Stormwater Program 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 3 4