Loading...
HomeMy WebLinkAboutNC0077135_MV-2022-0011 Remission Factors Summary w sigs 16Sep2022_20220919DocuSign Envelope ID: 1277F78C-2645-406B-9FB9-9286842AF752 DIVISION OF WATER RESOURCES CIVIL PENALTY REMISSION FACTORS — Summary and Signature Page Case Number: MV-2022-0011 Region: Winston Salem County: Rockingham Assessed Entity: Curl Modular Homes — Hidden Valley WWTP Permit: NC0077135 ❑ (a) Whether one or more of the civil penalty assessment factors were wrongly applied to the detriment of the petitioner: Not asserted X ❑ (b) Whether the violator promptly abated continuing environmental damage resulting from the violation: Permittee Asserts [see Permittee's Request for Remission]: After Receiving the initial NOV [10May2022], we contacted our ORC, Smith Industries. Mr. Smith promptly investigated and stated that the missing data...were uploaded to our report [eDMR] and the situation had been rectified." Upon receiving the CPA [10Jun2022], we again contacted Mr. Smith who assured us that the data for the appropriate samples had been provided. DWR Response: The Permittee has a recent history of monitoring noncompliance. During the 12 months prior to Jan2022, the Permittee committed frequency violations on 13Nov and 27Nov for the parameters BOD-5, Fecal Coliform, Flow, Ammonia Nitrogen, Dissolved Oxygen, and Total Suspended Solids. In addition, they violated monitoring frequency for Temperature (Dec2021) and Dissolved Oxygen (Aug2021). WSRO responded with Notices of Violations for all except a Notice of Deficiency for Aug2021. After review and discussions [WSRO / Central Office], DWR finds no justification to remit civil penalties. n (c) Whether the violation was inadvertent or a result of an accident: Not asserted n (d) Whether the violator had been assessed civil penalties for any previous violations: Not asserted (e) Whether payment of the civil penalty will prevent payment for the remaining necessary remedial actions: Not asserted NOTE: Blue X indicates a remission factor chosen by the Permittee. Remission of this penalty is based on Factor (b). DocuSign Envelope ID: 1277F78C-2645-406B-9FB9-9286842AF752 Total Enforcement: $200.00 + $105.07 costs = $305.07 DECISION (Check One) Request Denied X Full Remission El Retain Enforcement Costs? Partial Remission ❑ CPA Summary: No❑ Original Penalty (without Enforcement Costs) $200.00 Retaining Enforcement Costs Total Penalty EDocuSigned by: /74-/-i; 8328B44CE9EB4A1... +$105.07 $305.07 9/19/2022 for Richard E. Rogers, Jr. Date As Regional Supervisor of the Winston-Salem Regional Office, I, Lon T. Snider, having accounted for the Findings of Fact and Conclusions of Law and the factors set forth at G. S. 143B- 282. 1(b), have determined the amount of the penalty pursuant to G.S. 143- 215.6A(c). DWR assesses the following civil penalties against Curl Modular Homes: $50.00 for 1 of 1 failure to properly monitor BOD, 5-Day (20 De2. C) - Concentration in violation of Permit No. NC0077135. $50.00 for 1 of 1 failure to properly monitor Coliform, Fecal MF, MFC Broth, 44. 5 C in violation of Permit No. NC0077135. $50.00 for 1 of 1 failure to properly monitor Nitrogen, Ammonia Total (as N) - Concentration in violation of Permit No. NC0077135. $50.00 for 1 of 1 failure to properly monitor Solids, Total Suspended - Concentration in violation of Permit No. NC0077135. $200.00 TOTAL CIVIL PENALTY $105.07 Enforcement Costs $305.07 TOTAL AMOUNT DUE