Loading...
HomeMy WebLinkAboutNCC206015_NOT Closeout Documents_20220914North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Franklin Project: Louisburg 115kV Capacitor Bank River basin: Tar -Pamlico Person financially responsible: Duke Energy Progress, LLC - Alan Lewis, Project #: FRANK-2021-014 Manager Address: 410 S Wilmington St, Raleigh, NC 27601 1. Project Location: 480 SR1211/West River Road, Louisburg Pictures: Yes - Digital 2. Weather and soil conditions: Cloudy, Warm, Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: August 04, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. The referenced NCGO1 permit # is: NCC206015 Reported by: Dylan Kirk Others present: Date of inspection: August 04, 2022 Time arriving on site: 12:15 PM Time leaving site: 12:45 PM cc: M� ANN-'