HomeMy WebLinkAboutNCC206015_NOT Closeout Documents_20220914North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Franklin Project: Louisburg 115kV Capacitor Bank River basin: Tar -Pamlico
Person financially responsible: Duke Energy Progress, LLC - Alan Lewis, Project #: FRANK-2021-014
Manager
Address: 410 S Wilmington St, Raleigh, NC 27601
1. Project Location: 480 SR1211/West River Road, Louisburg
Pictures: Yes - Digital
2. Weather and soil conditions: Cloudy, Warm, Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 04, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
The referenced NCGO1 permit # is: NCC206015
Reported by: Dylan Kirk Others present:
Date of inspection: August 04, 2022 Time arriving on site: 12:15 PM Time leaving site: 12:45 PM
cc:
M�
ANN-'