HomeMy WebLinkAbout20221288 Ver 1_Shoreline Stabilization_20220919Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email*
hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 9/18/2022
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
ROBERT K STRICKLAND
KALE@SSCLAIMS.COM
(704)904-1084
(xxx)xxx-xxxx
Street Address
17300 Wavecrest Court
Address Line 2
City
Cornelius
Postal / Zip Code
28031-7699
Is there an agent working on the project? * Yes
No
Agent/Consultant Information
State / Province / Region
NC
Country
US
Name: * TAMARA HAGER
Company Affiliation: * LKN DREDGE & MARINE CONSTRUCTION
Email: * hager@lakepermit.com
Phone Number:*
(704)575-2227
(xxx)xxx-xxxx
Mailing Address:*
Street Address
PO BOX 5335
Address Line 2
City State / Province / Region
MOORESVILLE NC
Postal / Zip Code Country
28117 US
A signed and dated copy of the Agent Authorization letter:*
strickland auth.pdf 1.32MB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name:*
STRICKLAND
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. *
Upload File
Look up address
Upload Map: strickland survey.pdf
Latitude:*
35.458726
Longitude: *-80.926252
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
strickland sketch.pdf 845.21KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
strickland pic.pdf 134.25KB
4. Location of the property (where work is to be conducted)
Nearest Town: * CORNELIUS
County: * Mecklenburg
Lake/ river/ ocean adjacent to NORMAN/CATAWBA
property:
Subdivisions name or site address: *
SOMERSET SHORES LOT 4
Include phase/lot number
Directions to site: *
FROM COWANS FORD DAM TRAVEL EAST ON HWY 73 FOR 5
MILES, TURN LEFT ONTO WEST CATAWBA AVE FOR 2.4 MILES,
TURN LEFT ONTO JETTON RD 2.0 MILES, TURN LEFT ONTO
JOHN CONNOR RD , TURN RIGHT .90 MILES ONTO WAVECREST
CT , ARRIVE AT PROJECT 600 FT.
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
RESIDENTIAL
Residential, undeveloped, etc.
6. Property Size .56
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
DREDGE AREA OF 40X45X8 DEPTH
8. How will the work be done?*
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
0
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NONE BY BARGE
Sketch: strickland sketch.pdf 845.21KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name: * ROBERT K STRICKLAND
Signature:
05 T 5T /C!/JWL
Submittal Date: 9/18/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number: * 20221288 Version: * 1
Select Reviewer: * Doug Perez:eads\djperez
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received?* No Payment Needed
Fee Received
Need Fee - send electronic notification
What amount is owed?* $240.00
$570.00
ria��Jv9;t�,ns�)=rN! j �iA?,�T l- Ps'1f}=i
Project (ii . eja >:N' /J73( mir5612 T'�t CT /1/L2LJ!-ert L7u/!,
Pr tiff
CCont.{'rZ.cn.6Cost'GgGrilt L
The. approval is forthe In yourHupl1C_tioa. lrnp cts not the
,7�rp05@ rile G1cSl�ll described c i• ?;,GICv?cam In
i=ppllcation IS 2 violation ofthm Buffer Rule. �= 7fOi?G=G in the =�pliC:tiO:. i_- ; lC
C07H.05C6 and 15=.ilC-Cp7B.07 117(8)Trees arc not allowed - __ from"_ _ _
ELt_ d to c t emovEd tone . of the ui' f:7.r (within 30 is o the full pond El v tion unless
approved_ txce.ption. those trE=s ' _ = r l ,- _ _ i,
L:iia�:
F.hST' .. , , J undermined along:the iiT'!ECiia�E shoreline C=" ri
I\%hlirilel =i1?l7it'168i11R Slc7-t _ - _ _ .. -.l �E ram
inc =loni the irmmerg3te shore -line Is allowed. i_S j'I AC li>j .02=:3(6}
Benching, 5t=dilig'ii:,EGet' :e' iirEc -r---v C? -of - t 243r`--
er not to _=7Cc--. I�LCti:=rtC.. :v^t_rlGCCliEr.i_.7,�NCACGLc �1--'`;=%�
eaciiEa; impervious patios, impervious walli_ICr ^t1. ere not allowed I1the. buffer yni=sCS52Cl7fC3l1127pr1
1d
by the Division. There are. on size. for
decks. ? 5A N!C.ACO2- Q2 3(4i -nci (EH
Work to be conduct from 1=arC Tui1ri1^e. an and ln�IC2:c _.—_- to ,- removed. o:ce. -
._:Or corridor should be de crib=d. iE =p:proveE_�7S corridor shall _a restored. E_._ spoil,
'r i- mu -St. be outside the. h -i =_r. ijL NiCAC: .U_0Il an-:E 2. f\ir-- .:.'0 ,.�-�`- ..
S ormvdater cannot be oip=ri _-- torE lake. =;f_'tr _aC==r:'tee3:dijC(" ? must be the rm_rr=l G'=^nere_ prior o _r��raruo bu e- directed Es c::- __
4;
sheetil04y 'c_ non -erosive v&oci i-n to the fake_ [15A IICAC 02B .0243(5); tE,i
-,unn0..! .of ll]OfilCr%7�o�rs�/� ��
'.,Cre L•=,k y State u_t ( ,EVc ci ;ilioiitE� O t 1E CEic!%I0=
=nt :4 Qnducied in the. i:, f not specifically stated in the application and appr ov
bV hE (ivis(on of Water Recour _E i �!.'t>? ` i5 = violation and s_b d. _ ' � .. _ = .:,. - - C: _ •uj_ G^.i'7OfGEtTIE:,=. Due d[Ilcei!Ce 1?JIn be
taken Each tfi__ th E
�ccn tructiorwit) be- nuil''ithin substantial compliance and intent i Yi7- =.1u^(l_.Certi•f.c-_ionEnwjr: ^er,icc, th=an'rov dplan(a} and Eci=fc_tio"(c!, _nM o-sr;,n?L,L-
materials.
=
fists:t1 / i o,JZZ
Mar 02 06 09:57a
FROP1 :
Chris Knight
FP 111
TNT$ IS 70 acorn, THAT Ott T77R -77hR PLAN tYA:i IMF UNDER MT RUPERViSOR OF 77IC PROPERTY Sop, of WOWN ES
—__PLA Y
'. JNF PLOT FROM 714'ORUAnON PROVIDED ER' OTHERS. ANO TRF )14 §BC/qu U M7 Ue THIS FLAP
P ODO: CO. ND s D T i}iQ NpyNpnR7 aGy
mrtpRIO MID NOT mom BF SURVEY
FOR PERFORMED tN 711E PREFARATMR TrtiC s OTHSIYVrt54 7NDICATCO, akt
OOuNroAN NE4o7 mom Ott nns rs n PAE+,Y6tIY+WIr
704 892 3470 p 1
Feb. 2S 2EGE, A4:F37PM Pi
VICINITY ' ma
LEOZND
ke'W - 10ONT-OP-WAY
CAS, COMMON 6T'EFt sPicCe
cue -• ORR m GONER
NOT
7. SU8EC7 FROPERN IS WNW OR �
S•vroACNS PER TOWN OF CORNELIUUSS ^ a.--�n� REM .. D' /
SUM - V
1ZUCE 8UPmn - *O'
LAKE�p,T�'y NORMAN 7�T
TS ORMAiV d
i
1
(
FIR
LOT 3
0
LINE TABLE
LINE
7.1
LENGTH
5D,00
49.78
PR7:PMKL) FOR
SCALE c".40
MAP HOOD 74 7'ADE 279
DEEM DOOR T_ PALM
BEARING
1/82.1(rOnl.
N22'7 7'q;, w"
memo
JAMGa MAU/WA? AggpCIATTIE
RY AL SURY6Yogg
P' iE
mepxp7«A WORTRIN7 ORR&
TEL 707 9Ai«31i 231
FAX! 71/4-907..380.3
0.1 a0 Z
N® IVFAi
36, 45 C.
i7
M9 To-279
LOT 5
AREA tN R22
T,838 SQ.1T
0.0376 ACRES
I"NETNET ge a
ff S2 % 7 ACRE
IQ3A) _APF4
24,014 SQ.Fi
0.565i AcRas
WAVECREA T COURT
60' PUBLIC R/W MB 18-279
..a�{P'LA�TT PLAN OF
Lulu)* tO T67AP. "_" hhr .47$O �..
MEP{ LN .J ro t:OUNtY NWi7Tt sAROUNA
C.M. KNIGHT
OD1EATE*
FLOOD Teas IS TO CERTIFY RUE THE SUSACT PROPERTY .s.. x .
tactoto ROAR PREPARE MYTHS REOE7TY~N.�RfJRERCPrC_NCY kotIVER AR !MORN NT AGENCY FEDERAL RTSO RNCE AgmegumliCk OMI D
Nu, nonI JL7 ISGU2OVE.." -"-
TET
pLUT "PL
-Lake
(At Full Pond/Normal Water Level)
Pull 'Pon d/
Normal Water Level
ShoreIlns
Please approximately sketch the following information on this plan (provide dimes
/teat, such as 10 r tx 700.j-)':
a sionsl or each
All proposed vegetation clearing
2. location o; rip rap or ill to be placed above the Full Pond/'Nor
3• Location of rip rap or fill to be placed below the Full Pond/ Normal WaterLeve
Pond/Normal Water Level elevation
4. Location o; an p I elevation
Y proposed structures such as buildings, -retaining wails, docks, etc.
3. Location ofany excavation or dredging below the Full Pond/ Normal Water Level elevation
5. Location of construction access corridors
FORM: SSGP 10-2013
Page 3 of 3
-Lake
(At Full Pond/Normal Water Level)
Pull 'Pon d/
Normal Water Level
ShoreIlns
Please approximately sketch the following information on this plan (provide dimes
/teat, such as 10 r tx 700.j-)':
a sionsl or each
All proposed vegetation clearing
2. location o; rip rap or ill to be placed above the Full Pond/'Nor
3• Location of rip rap or fill to be placed below the Full Pond/ Normal WaterLeve
Pond/Normal Water Level elevation
4. Location o; an p I elevation
Y proposed structures such as buildings, -retaining wails, docks, etc.
3. Location ofany excavation or dredging below the Full Pond/ Normal Water Level elevation
5. Location of construction access corridors
FORM: SSGP 10-2013
Page 3 of 3