Loading...
HomeMy WebLinkAbout20221288 Ver 1_Shoreline Stabilization_20220919Shoreline Stabilization Application Form NORTH CAROLINA Environmental Quality 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 DRAFT -NOT FOR USE AT THIS TIME Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email* hager@lakepermit.com Please provide an email address for payment and requests for more information here. Pre -Filing Meeting Date Request was 9/18/2022 submitted on: * Owner Information: Name: * Email: * Phone Number: Mailing Address: * ROBERT K STRICKLAND KALE@SSCLAIMS.COM (704)904-1084 (xxx)xxx-xxxx Street Address 17300 Wavecrest Court Address Line 2 City Cornelius Postal / Zip Code 28031-7699 Is there an agent working on the project? * Yes No Agent/Consultant Information State / Province / Region NC Country US Name: * TAMARA HAGER Company Affiliation: * LKN DREDGE & MARINE CONSTRUCTION Email: * hager@lakepermit.com Phone Number:* (704)575-2227 (xxx)xxx-xxxx Mailing Address:* Street Address PO BOX 5335 Address Line 2 City State / Province / Region MOORESVILLE NC Postal / Zip Code Country 28117 US A signed and dated copy of the Agent Authorization letter:* strickland auth.pdf 1.32MB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* STRICKLAND If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. * Upload File Look up address Upload Map: strickland survey.pdf Latitude:* 35.458726 Longitude: *-80.926252 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* strickland sketch.pdf 845.21KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) strickland pic.pdf 134.25KB 4. Location of the property (where work is to be conducted) Nearest Town: * CORNELIUS County: * Mecklenburg Lake/ river/ ocean adjacent to NORMAN/CATAWBA property: Subdivisions name or site address: * SOMERSET SHORES LOT 4 Include phase/lot number Directions to site: * FROM COWANS FORD DAM TRAVEL EAST ON HWY 73 FOR 5 MILES, TURN LEFT ONTO WEST CATAWBA AVE FOR 2.4 MILES, TURN LEFT ONTO JETTON RD 2.0 MILES, TURN LEFT ONTO JOHN CONNOR RD , TURN RIGHT .90 MILES ONTO WAVECREST CT , ARRIVE AT PROJECT 600 FT. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: * RESIDENTIAL Residential, undeveloped, etc. 6. Property Size .56 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): DREDGE AREA OF 40X45X8 DEPTH 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: * 0 (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) NONE BY BARGE Sketch: strickland sketch.pdf 845.21KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name: * ROBERT K STRICKLAND Signature: 05 T 5T /C!/JWL Submittal Date: 9/18/2022 Initial Review Is this accepted into the review process?* Yes No Project Number: * 20221288 Version: * 1 Select Reviewer: * Doug Perez:eads\djperez Select Reviewing Office: Mooresville Regional Office - (704) 663-1699 Has payment been received?* No Payment Needed Fee Received Need Fee - send electronic notification What amount is owed?* $240.00 $570.00 ria��Jv9;t�,ns�)=rN! j �iA?,�T l- Ps'1f}=i Project (ii . eja >:N' /J73( mir5612 T'�t CT /1/L2LJ!-ert L7u/!, Pr tiff CCont.{'rZ.cn.6Cost'GgGrilt L The. approval is forthe In yourHupl1C_tioa. lrnp cts not the ,7�rp05@ rile G1cSl�ll described c i• ?;,GICv?cam In i=ppllcation IS 2 violation ofthm Buffer Rule. �= 7fOi?G=G in the =�pliC:tiO:. i_- ; lC C07H.05C6 and 15=.ilC-Cp7B.07 117(8)Trees arc not allowed - __ from"_ _ _ ELt_ d to c t emovEd tone . of the ui' f:7.r (within 30 is o the full pond El v tion unless approved_ txce.ption. those trE=s ' _ = r l ,- _ _ i, L:iia�: F.hST' .. , , J undermined along:the iiT'!ECiia�E shoreline C=" ri I\%hlirilel =i1?l7it'168i11R Slc7-t _ - _ _ .. -.l �E ram inc =loni the irmmerg3te shore -line Is allowed. i_S j'I AC li>j .02=:3(6} Benching, 5t=dilig'ii:,EGet' :e' iirEc -r---v C? -of - t 243r`-- er not to _=7Cc--. I�LCti:=rtC.. :v^t_rlGCCliEr.i_.7,�NCACGLc �1--'`;=%� eaciiEa; impervious patios, impervious walli_ICr ^t1. ere not allowed I1the. buffer yni=sCS52Cl7fC3l1127pr1 1d by the Division. There are. on size. for decks. ? 5A N!C.ACO2- Q2 3(4i -nci (EH Work to be conduct from 1=arC Tui1ri1^e. an and ln�IC2:c _.—_- to ,- removed. o:ce. - ._:Or corridor should be de crib=d. iE =p:proveE_�7S corridor shall _a restored. E_._ spoil, 'r i- mu -St. be outside the. h -i =_r. ijL NiCAC: .U_0Il an-:E 2. f\ir-- .:.'0 ,.�-�`- .. S ormvdater cannot be oip=ri _-- torE lake. =;f_'tr _aC==r:'tee3:dijC(" ? must be the rm_rr=l G'=^nere_ prior o _r��raruo bu e- directed Es c::- __ 4; sheetil04y 'c_ non -erosive v&oci i-n to the fake_ [15A IICAC 02B .0243(5); tE,i -,unn0..! .of ll]OfilCr%7�o�rs�/� �� '.,Cre L•=,k y State u_t ( ,EVc ci ;ilioiitE� O t 1E CEic!%I0= =nt :4 Qnducied in the. i:, f not specifically stated in the application and appr ov bV hE (ivis(on of Water Recour _E i �!.'t>? ` i5 = violation and s_b d. _ ' � .. _ = .:,. - - C: _ •uj_ G^.i'7OfGEtTIE:,=. Due d[Ilcei!Ce 1?JIn be taken Each tfi__ th E �ccn tructiorwit) be- nuil''ithin substantial compliance and intent i Yi7- =.1u^(l_.Certi•f.c-_ionEnwjr: ^er,icc, th=an'rov dplan(a} and Eci=fc_tio"(c!, _nM o-sr;,n?L,L- materials. = fists:t1 / i o,JZZ Mar 02 06 09:57a FROP1 : Chris Knight FP 111 TNT$ IS 70 acorn, THAT Ott T77R -77hR PLAN tYA:i IMF UNDER MT RUPERViSOR OF 77IC PROPERTY Sop, of WOWN ES —__PLA Y '. JNF PLOT FROM 714'ORUAnON PROVIDED ER' OTHERS. ANO TRF )14 §BC/qu U M7 Ue THIS FLAP P ODO: CO. ND s D T i}iQ NpyNpnR7 aGy mrtpRIO MID NOT mom BF SURVEY FOR PERFORMED tN 711E PREFARATMR TrtiC s OTHSIYVrt54 7NDICATCO, akt OOuNroAN NE4o7 mom Ott nns rs n PAE+,Y6tIY+WIr 704 892 3470 p 1 Feb. 2S 2EGE, A4:F37PM Pi VICINITY ' ma LEOZND ke'W - 10ONT-OP-WAY CAS, COMMON 6T'EFt sPicCe cue -• ORR m GONER NOT 7. SU8EC7 FROPERN IS WNW OR � S•vroACNS PER TOWN OF CORNELIUUSS ^ a.--�n� REM .. D' / SUM - V 1ZUCE 8UPmn - *O' LAKE�p,T�'y NORMAN 7�T TS ORMAiV d i 1 ( FIR LOT 3 0 LINE TABLE LINE 7.1 LENGTH 5D,00 49.78 PR7:PMKL) FOR SCALE c".40 MAP HOOD 74 7'ADE 279 DEEM DOOR T_ PALM BEARING 1/82.1(rOnl. N22'7 7'q;, w" memo JAMGa MAU/WA? AggpCIATTIE RY AL SURY6Yogg P' iE mepxp7«A WORTRIN7 ORR& TEL 707 9Ai«31i 231 FAX! 71/4-907..380.3 0.1 a0 Z N® IVFAi 36, 45 C. i7 M9 To-279 LOT 5 AREA tN R22 T,838 SQ.1T 0.0376 ACRES I"NETNET ge a ff S2 % 7 ACRE IQ3A) _APF4 24,014 SQ.Fi 0.565i AcRas WAVECREA T COURT 60' PUBLIC R/W MB 18-279 ..a�{P'LA�TT PLAN OF Lulu)* tO T67AP. "_" hhr .47$O �.. MEP{ LN .J ro t:OUNtY NWi7Tt sAROUNA C.M. KNIGHT OD1EATE* FLOOD Teas IS TO CERTIFY RUE THE SUSACT PROPERTY .s.. x . tactoto ROAR PREPARE MYTHS REOE7TY~N.�RfJRERCPrC_NCY kotIVER AR !MORN NT AGENCY FEDERAL RTSO RNCE AgmegumliCk OMI D Nu, nonI JL7 ISGU2OVE.." -"- TET pLUT "PL -Lake (At Full Pond/Normal Water Level) Pull 'Pon d/ Normal Water Level ShoreIlns Please approximately sketch the following information on this plan (provide dimes /teat, such as 10 r tx 700.j-)': a sionsl or each All proposed vegetation clearing 2. location o; rip rap or ill to be placed above the Full Pond/'Nor 3• Location of rip rap or fill to be placed below the Full Pond/ Normal WaterLeve Pond/Normal Water Level elevation 4. Location o; an p I elevation Y proposed structures such as buildings, -retaining wails, docks, etc. 3. Location ofany excavation or dredging below the Full Pond/ Normal Water Level elevation 5. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 -Lake (At Full Pond/Normal Water Level) Pull 'Pon d/ Normal Water Level ShoreIlns Please approximately sketch the following information on this plan (provide dimes /teat, such as 10 r tx 700.j-)': a sionsl or each All proposed vegetation clearing 2. location o; rip rap or ill to be placed above the Full Pond/'Nor 3• Location of rip rap or fill to be placed below the Full Pond/ Normal WaterLeve Pond/Normal Water Level elevation 4. Location o; an p I elevation Y proposed structures such as buildings, -retaining wails, docks, etc. 3. Location ofany excavation or dredging below the Full Pond/ Normal Water Level elevation 5. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3