Loading...
HomeMy WebLinkAbout20190866 Ver 1_Notice of Initial Credit Release_20220914 Hamilton, Ryan From:Davis, Erin B Sent:Friday, September 16, 2022 11:46 AM To:Hamilton, Ryan Subject:FW: \[External\] Notice of Initial Credit Release/ NCDMS Huntsman Mitigation Site/ SAW-2019-00836/ Wilkes County Attachments:Huntsman_100123_YD 102_STR_Initial Release KI.pdf Follow Up Flag:Follow up Flag Status:Flagged Laserfiche Upload: Email & Attachment DWR#: 20190866 v.1 Doc Date: 9/14/22 Doc Type: Mitigation Evaluation Doc Name: General topic of email title From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Wednesday, September 14, 2022 2:10 PM To: Wiesner, Paul <paul.wiesner@ncdenr.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org>; Reid, Matthew <matthew.reid@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Aaron Earley <aearley@wildlandseng.com>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil> Subject: \[External\] Notice of Initial Credit Release/ NCDMS Huntsman Mitigation Site/ SAW-2019-00836/ Wilkes County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon, The 15-Day As-Built/MY0 review for the Huntsman Mitigation Site (SAW-2019-00836) ended September 9, 2022. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in the email below. There were no objections to issuing the initial 30% credit release of 1,745.082 warm stream mitigation units; however, we are requesting a written response to IRT comments prior to the site visit scheduled for October 13, 2022. Please send a georeferenced CCPV map along with your responses. Please find attached the current signed ledger. The site visit will be held October 13, 2022, 10:30 am, Wilkes County (36.140626, -80.932103) Kim Isenhour, USACE: 1. In addition to DWR’s concerns, please confirm what size rock was used in the constructed riffles on UT1. As I recall, there was degradation on a steep section near STA 210+50 (?). DWR expressed concerns about the size of the material used; and questioned whether using larger rock in these riffles and embedding some Class I and 1 only top dressing with any remaining on-site smaller material may have been more appropriate. Please provide more detail on this repair. Erin Davis, NCDWR: 1. The PP14 photo shows the Ingle Hollow Road culvert. In response to WRC’s draft mit plan review comment regarding the perched culvert being an aquatic passage barrier, a sill was to be added downstream setting the elevation to submerge the pipe outlet six inches. Based on the photo it’s difficult to see if water is being backed up into the culvert. Please confirm that the structure was installed as noted and the barrier has been abated. 2. The photo of veg plot 2 appears to show exposed soil with no signs of germination or straw cover, unlike the other veg plot photos. Has cover/stabilization of this area been addressed? Additionally, please watch for rill formation and sediment migration along graded slopes that were not matted (e.g., PP8 and PP9). Between working with pond bottom sediments, areas of priority 2 and very steep side slopes, DWR is concerned about sediment movement within and adjacent to the site becoming a stream pollutant risk beyond initial construction. 3. The step pool conveyance BMP photos for Old Bus Branch (PP27) and Rifle Trib. (PP23) appear very different, with Rifle Trib. having significantly more riprap. What facilitated the Rifle Trib. BMP design change from a vegetated BMP to a riprap step pool conveyance channel? It seems the vegetated BMP would offer more water quality benefits. 4. Since a permanent veg plot was shown in the UT1 lower pond bottom in both draft and final mitigation plan monitoring figures, DWR did not require one in our review comments. However, since that veg plot has been changed to a mobile plot, DWR is now requiring a permanent veg plot within the UT 1 lower pond bottom. 5. IRT members expressed concerns about the proposed buffer widths during the mitigation plan review. One reason DWR was concerned about narrower buffers along UT1 was that it meant steeper side slopes, which as the redline shows resulted in multiple riprap lined ditches not planned for in the initial design. Of particular concern is that four of the riprap ditches are in the vicinity of existing chicken houses. Please provide more information on the necessity of adding the riprap ditches. How does this affect the mitigation plan Section 3.4 functional uplift to “diffuse overland non-point source pollutants from adjacent land use”? Additionally, Sheet 1.1.5 shows added riprap covering an existing wetland area. If this was/is a jurisdictional feature, why wasn’t a non-hardened stabilization option applied? 6. Section 3.3 noted a couple riffle cross sections were larger than designed. Are these areas shown on the redline drawings? If not, can you please identify the locations. 7. Please add stream and reach labels to the CCPV Figures 3.1 and 3.2. Please reach out with any questions. Thanks, Kim Kim Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers l 919.946.5107 2 River Basin Date Project Instituted Cataloging Unit Date Prepared03040102 Yadkin 8/17/2022 5/21/2019 Mitigation Project Name USACE Action ID DMS ID DWR Permit100123 Huntsman Site 2019-0866 2019-00836 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Signature of Official Approving Credit Release County Stream/Wet. Service AreaWilkes Yadkin 03040102 Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date N/A N/A N/A 2 - Year 0 / As-Built 30.00%1,745.082 1,745.082 0.000 1,745.082 2022 8/17/2022 1 - Site Establishment N/A N/A N/A N/A 2023 4 - Year 2 Monitoring 10.00%581.696 2024 3 - Year 1 Monitoring 10.00%581.696 2025 6 - Year 4 Monitoring 5.00%290.847 2026 5 - Year 3 Monitoring 10.00%581.696 2027 8 - Year 6 Monitoring 5.00%290.847 2028 7 - Year 5 Monitoring 10.00%581.696 2029 Stream Bankfull Standard 10.00%581.696 2026 9 - Year 7 Monitoring 10.00%581.696 Totals 1,745.082 Total Unrealized Credits to Date 0.000 Total Gross Credits 5,816.952 Total Percentage Released 30.00% Total Released Credits to Date 1,745.082 Notes Remaining Unreleased Credits 4,071.870 Warm Stream Restoration 5,397.862 Warm Stream Enhancement II 593.426 Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Huntsman Site Yadkin 03040102 River Basin Date Project Instituted Cataloging Unit Date Prepared03040102 Yadkin 8/17/2022 5/21/2019 Mitigation Project Name USACE Action ID DMS ID DWR Permit100123 Huntsman Site 2019-0866 2019-00836 County Stream/Wet. Service AreaWilkes Yadkin 03040102 Owning Program Beginning Balance (mitigation credits)5,816.952 Released Credits 1,745.082 Unrealized Credits 0.000 Debits Warm Stream Restoration Credits Remaining Balance (Released credits)1,745.082 Remaining Balance (Unreleased credits)4,071.870 Total Remaining Balance (Released and Unreleased credits)5,816.952 Converted Credits 0.000 Req. Id TIP #Project Name USACE Permit # DWR Permit # DCM Permit # Huntsman Site Yadkin 03040102