Loading...
HomeMy WebLinkAbout20190862 Ver 1_IRT Review Request: As-Built Baseline Monitoring Report (MY0)_20220914 Hamilton, Ryan From:Davis, Erin B Sent:Friday, September 16, 2022 11:44 AM To:Hamilton, Ryan Subject:FW: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - Nesbit Site (DMS#100121) - (SAW-2019-00832) (DWR#2019-0862 v1) - Catawba River Basin (03050103)- Union County Attachments:Nesbit Site_100121_CT 03_STR_RW_Initial Release.pdf Follow Up Flag:Follow up Flag Status:Flagged Laserfiche Upload: Email & Attachment DWR#: 20190862 v.1 Doc Date: 9/14/22 Doc Type: Mitigation Information Doc Name: General topic of email title From: Wiesner, Paul <paul.wiesner@ncdenr.gov> Sent: Wednesday, September 14, 2022 2:46 PM To: Davis, Erin B <erin.davis@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Cc: Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Raymond Holz <rholz@restorationsystems.com>; Matthew Harrell <mharrell@restorationsystems.com>; Allen, Melonie <melonie.allen@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov> Subject: IRT Review Request: As-Built Baseline Monitoring Report (MY0) - Nesbit Site (DMS#100121) - (SAW-2019- 00832) (DWR#2019-0862 v1) - Catawba River Basin (03050103)- Union County Erin, Kim and Todd; The FINAL As-Built Baseline Monitoring Report and Record Drawings for the Nesbit Site (DMS# 100121) were received by DMS on September 12, 2022 and posted to the IRT SharePoint site and DWR Laserfiche on September 13, 2022 for your review. 2022 is Monitoring Year 1 for this project. The credit ledger for the 30% release is attached for your review. Project information and location of the FINAL As-Built Baseline Monitoring Report (MY0): Nesbit Site DMS Project# 100121 RFP# 16-007704 – Issued 9/6/2018 Institution Date: 4/18/2019 – Full Delivery SAW-2019-00832 DWR# 2019-0862 v1 Catawba River Basin Cataloging Unit 03050103 Union County, North Carolina Mitigation Plan Credits: 5,198.736 SMUs (warm) 1 6.477 (riparian) As-Built-MY0 Credits: 5,198.736 SMUs (warm) 6.477 (riparian) Mitigation Plan Lengths and Acreage: 5,657 linear feet 7.315 acres As-Built-MY0 Lengths and Acreages: 5,619 linear feet 7.315 acres FD Provider: Restoration Systems, LLC. – Contact: Raymond Holz (rholz@restorationsystems.com), (919) 755-9490 NCDEQ - DMS PM: Kelly Phillips, kelly.phillips@ncdenr.gov, (919) 723-7565 FINAL As-Built Baseline Monitoring Report and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx Nesbit Site_100121_MY0_2022 Nesbit_100121_MY0_2022.pdf Nesbit Site_100121_As-Built_2022 Nesbit_100121_As-Built_2022.pdf Please let me know if you have questions or call to discuss. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services Cell: (828) 273-1673 paul.wiesner@ncdenr.gov Asheville Regional Office 2090 U.S. 70 Highway Swannanoa, NC 28778-8211 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 Mitigation Project Name DMS ID 100121 Nesbit Site County Union Catawba 03050103 River Basin Cataloging Unit 03050103 Catawba 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as-built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Signature of Official Approving Credit Release Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date N/A N/A N/A 2 - Year 0 / As-Built 30.00%1,559.618 1,559.618 0.000 1,559.618 2022 9/12/2022 1 - Site Establishment N/A N/A N/A N/A 2023 4 - Year 2 Monitoring 10.00%519.874 2024 3 - Year 1 Monitoring 10.00%519.874 2025 6 - Year 4 Monitoring 5.00%259.937 2026 5 - Year 3 Monitoring 10.00%519.874 2027 8 - Year 6 Monitoring 5.00%259.937 2028 7 - Year 5 Monitoring 10.00%519.874 2029 Stream Bankfull Standard 10.00%519.874 2026 9 - Year 7 Monitoring 10.00%519.874 Totals 1,559.618 Total Unrealized Credits to Date 0.000 Total Gross Credits 5,198.736 Remaining Unreleased Credits 3,639.118 Total Percentage Released 30.00% Total Released Credits to Date 1,559.618 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Approved Release Date N/A N/A N/A 2 - Year 0 / As-Built 30.00%1.941 1.941 0.000 1.941 2022 9/12/2022 1 - Site Establishment N/A N/A N/A N/A 2023 4 - Year 2 Monitoring 10.00%0.648 2024 3 - Year 1 Monitoring 10.00%0.648 2025 6 - Year 4 Monitoring 5.00%0.324 2026 5 - Year 3 Monitoring 15.00%0.972 20299 - Year 7 Monitoring 10.00%0.648 2027 8 - Year 6 Monitoring 5.00%0.324 2028 7 - Year 5 Monitoring 15.00%0.972 Totals 1.941 Total Unrealized Credits to Date 0.000 Total Gross Credits 6.477 Total Percentage Released 29.97% Total Released Credits to Date 1.941 Remaining Unreleased Credits 4.536 9/12/2022 4/18/2019 2019-0862 2019-00832 Stream/Wet. Service Area Date Prepared Date Project Instituted DWR Permit USACE Action ID Nesbit Site Catawba 03050103 / Catawba 03 ESA 1 of 2 Mitigation Project Name DMS ID 100121 Nesbit Site County Union Catawba 03050103 River Basin Cataloging Unit 03050103 Catawba 9/12/2022 4/18/2019 2019-0862 2019-00832 Stream/Wet. Service Area Date Prepared Date Project Instituted DWR Permit USACE Action ID Riparian Restoration Equivalent Credits 1.139 0.341 0.000 0.000 Owning Program 0.341 0.798 1.139 Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Notes Warm Stream Enhancement II 541.000 Riparian Restoration 5.338 Warm Stream Restoration 4,800.000 Warm Stream Enhancement I 316.000 Beginning Balance (mitigation credits)5,198.736 5.338 Released Credits 1,559.618 1.600 Riparian Enhancement 1.977 Debits Warm Stream Restoration Credits Riparian Restoration Credits Project Name USACE Permit # DWR Permit # Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Remaining Balance (Unreleased credits)3,639.118 3.738 Total Remaining Balance (Released and Unreleased credits)5,198.736 5.338 DCM Permit # Remaining Balance (Released credits)1,559.618 1.600 Req. Id TIP # Nesbit Site Catawba 03050103 / Catawba 03 ESA 2 of 2