HomeMy WebLinkAbout20181033 Ver 1_Owen Farms Repairs_20220916 Hamilton, Ryan From:Davis, Erin B Sent:Friday, September 16, 2022 11:43 AM To:Hamilton, Ryan Subject:FW: \[External\] Owen Farms Repairs (SAW-2018-01165) Attachments:Owen Farms 2022 Repair Photo Log.pdf; Owen Farms 2022 Repair Figure.pdf Follow Up Flag:Follow up Flag Status:Flagged Laserfiche Upload: Email & Attachments DWR#: 20181033 v.1 Doc Date: 9/16/22 Doc Type: Mitigation Remediation Plans Doc Name: General topic of email title From: Furr, Benjamin <Ben.Furr@davey.com> Sent: Friday, September 16, 2022 8:53 AM To: Kim Browning <Kimberly.D.Browning@usace.army.mil> Cc: Alex Digeronimo <Alex.Digeronimo@davey.com>; Kevin Williams <KWilliams@davey.com>; Tisdale, Jessica <jessica.tisdale@hdrinc.com>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Davis, Erin B <erin.davis@ncdenr.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov> Subject: \[External\] Owen Farms Repairs (SAW-2018-01165) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Kim Per our conversation last week, I wanted to provide you with a summary of our plan to complete additional bank repairs at the Owen Farms Mitigation Site this fall/winter. Erosion is primarily occurring on streambanks that have poor vegetative coverage. We plan to repair/stabilize approximately 355 LF of stream bank through the use of sod mats and boulder toe. Standard construction equipment will be used to complete the repairs (i.e. excavator and off-road hauler). The attached figure depicts the strategy that will be used at each bank repair location. A photo log is also attached that shows current conditions at each repair location. Sod mats will be collected from on-site within the existing easement. Areas where sod mats are collected and other areas disturbed during construction will be seeded and replanted. We estimate needing a total of ~100 sq. yds. of sod mat. This work will be completed under the existing Nationwide Permit 27 and Erosion Control Permit for the Site. We are currently coordinating with a construction contractor to determine the repair schedule. Once finalized, we will submit a written request for a waiver of the trout moratorium from WRC for purposes of completing repair work and minimizing erosion on-site. Thank you and please let me know if you have any questions or comments. Benjamin Furr | Senior Consultant Davey Resource Group, Inc. 1 3101 Poplarwood Court, Suite 120, Raleigh, NC 27604 P: 919.645.4350 ext. 4354 | M: 919.588.9663 Visit our local office page 2 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 1 P1: Bank erosion between Station 10+00 and 10+50 P2: Looking upstream at eroded right bank near Station 11+00 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 2 P3: Bank erosion slightly upstream from P2 P4: Looking downstream at eroded right bank by Station 14+00 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 3 P5: Looking downstream at eroded right bank shown in P4 P6: Toe erosion on right bank near Station 15+50 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 4 P7: Looking downstream at scour/bank erosion on left bank near Station 16+50 P8: Looking upstream at scour/bank erosion shown in P7 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 5 P9: Bank looking upstream at bank erosion on right bank near Station 22+50 P10: Bank erosion on right bank shown in P9 Owen Farms Mitigation Site Photographic Documentation Repair Areas 9-15-2022 6 P11: Looking downstream at toe erosion on right bank near Station 25+50 60 FEET OF BANK REPAIRUSING SOD MATSAND BOULDER TOESEE PHOTO P4 & P5 55 FEET OF BANK REPAIRUSING SOD MATSSEE PHOTO P2 & P3 40 FEET OF BANK REPAIRUSING SOD MATSSEE PHOTO P1 60 FEET OF BANK REPAIRUSING BOULDER TOESEE PHOTOS P9 & P10 75 FEET OF BANK REPAIRUSING SOD MATSSEE PHOTOS P7 & P8 35 FEET OF TOE EROSIONTO BE FIXED USING BOULDER TOESEE PHOTO P11 30 FEET OF TOE EROSIONTO BE FIXED USING BOULDER TOESEE PHOTO P6 0 630Feet O REPAIR PLAN MAP FIGURE 1 OWEN FARMS MITIGATION SITE MAP DATE: 09-15-2022 Legend Erosion Area Bank Toe