Loading...
HomeMy WebLinkAbout20140704 Ver 1_Year 7 Monitoring Report_20220908 Hamilton, Ryan From:Davis, Erin B Sent:Friday, September 9, 2022 10:39 AM To:Hamilton, Ryan Subject:FW: \[External\] SAW-2014-02129 / EBX-Neuse I, LLC / Neu-Con UMBI / Buffalo Branch Year 7 Monitoring Report Follow Up Flag:Flag for follow up Flag Status:Flagged Laserfiche Upload: Email DWR#: 20140704 v.1 Doc Date: 9/8/22 Doc Type: Mitigation Information Doc Name: General topic of email title From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Friday, September 9, 2022 8:03 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov> Cc: Ryan Medric <rmedric@res.us>; Jamey McEachran <jmceachran@res.us> Subject: \[External\] SAW-2014-02129 / EBX-Neuse I, LLC / Neu-Con UMBI / Buffalo Branch Year 7 Monitoring Report CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning, th **Please note, an IRT site visit has been scheduled for October 24, in accordance with the meeting invite. The below reference bank Sponsor has submitted an Annual Monitoring Report for NCIRT review, and is requesting a release of credits. The Annual Monitoring Report has been posted to the RIBITS Cyber Repository for the bank site (see link and instructions provided below). If you are unable to access the document or prefer to have a hard copy mailed to you, please let me know as soon as possible, and I will arrange to get you a copy of the report. This review will follow the process outline for Credit Release Approval in the 2008 Mitigation Rule (Section 332.8(o)(9)), which requires an IRT review period of 15 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. Comments provided after the 15-day comment deadline may not be considered. If you would like to request a site visit prior to submitting comments, please notify me as soon as possible but prior to the 15-day comment due date. If a site visit is required, the due date for IRT comments will be extended to 15 days after the date of site visit. Once I have received a request for a site visit, I will coordinate with the IRT and Sponsor to arrange for the on-site meeting; however, please note that due to workload it may take a month or longer to arrange the meeting. Within 30 days of the conclusion of the IRT review period (comment deadline), a copy of all comments will be provided to the bank Sponsor and the IRT along with District Engineer's intent to approve or disapprove this credit release. 1 Sponsor: EBX-Neuse I, LLC (RES) Bank Name: RES Neu-Con Umbrella Mitigation Bank Site Name: Buffalo Branch USACE ID: SAW-2014-02129 River Basin: Neuse HUC: 03020201 County: Johnston Requested Credit Release: Year 7 Annual Monitoring ~10 percent of the total stream restoration and/or enhancement credits: 369.2 Warm Water Stream Credits 15-Day Comment Start Date: September 9, 2022 15-Day Comment Deadline: September 24, 2022 45-Day Credit Release Approval Deadline: October 24, 2022 Note: Deadlines will be extended if an on-site meeting is requested. Please be sure to log on to RIBITS before following the link below. Once in the Cyber Repository, select the arrow beside appropriate folder to view and/or download the documents. Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:3160354566127:::RP,278:P278_BANK_ID:3527 Please let me know if you have any questions or need any additional information. Best Regards, Sam Dailey U.S. Army Corps of Engineers Wilmington District, Regulatory Division, Raleigh Field Office Email: Samantha.J.Dailey@usace.army.mil Phone: (304) 617-4915 2