Loading...
HomeMy WebLinkAbout20221282 Ver 1_ePCN Application_20220916DWR Division of Water Resources Initial Review Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13, 2022 Ver 4.3 Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre -Filing Meeting Date Request was submitted on: 7/8/2022 BIMS # Assigned* Version#* 20221282 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Mooresville Regional Office - (704) 663-1699 Information for Initial Review la. Name of project: YMCA of Catawba Valley Stream Restoration la. Who is the Primary Contact?* Cindy M. Safrit What amout is owed?* $240.00 $570.00 Select Project Reviewer* Doug Perez:eads\djperez lb. Primary Contact Email:* lc. Primary Contact Phone:* cindy.safnt@ncagr.gov (704)754-0566 Date Submitted 9/16/2022 Nearest Body of Water Cripple Creek Basin Catawba Water Classification W S-I V Site Coordinates Latitude: Longitude: 35.74186 -81.33887 A. Processing Information County (or Counties) where the project is located: Catawba Is this a NCDMS Project Yes No Is this project a public transportation project? * Yes No la. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) lc. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 27 - Restoration NWP Numbers (for multiple NWPS): 13- Bank Stabilization Id. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No lg. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information ld. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project?* Yes No 2. Owner Information 2a. Name(s) on recorded deed: Young Mens Christian Assn of Catawba Valley, Inc 2b. Deed book and page no.: 2009 0834 2c. Contact Person: Robert "Nat" Auten 2d. Address Street Address 701 1st St. NW Address Line 2 City Hickory Postal /Zip Code 28601 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country US Yes No Yes No 2e. Telephone Number: (828)324-9622 2f. Fax Number: 2g. Email Address: * nata@ymcacv.org 3. Applicant Information (if different from owner) 3a. Name: Cindy M. Safrit, PE 3b. Business Name: NC Department of Ag and Consumer Services 3c. Address Street Address P.O. Box 845 Address Line 2 City Mocksville Postal / Zip Code 27028 3d. Telephone Number: (704)754-0566 3f. Email Address: * cindy.safrit@ncagr.gov 4. Agent/Consultant (if applicable) 4a. Name: Cindy M. Safrit, PE 4b. Business Name: NC Department of Ag and Consumer Services 4c. Address Street Address P.O. Box 845 Address Line 2 City Mocksville Postal / Zip Code 27028 4d. Telephone Number: (704)754-0566 4f. Email Address: * cindy.safrit@ncagr.gov C. Project Information and Prior Project History State / Province / Region NC Country US 3e. Fax Number: State / Province / Region NC Country US 4e. Fax Number: 1. Project Information 1b. Subdivision name: (if appropriate) N/A lc. Nearest municipality / town: Hickory 2. Project Identification 2a. Property Identification Number: 370315524925 2b. Property size: 19.85 2c. Project Address Street Address 701 1st St. NW Address Line 2 City State / Province / Region Hickory NC Postal / Zip Code Country 28601 US 3. Surface Waters 3a. Name of the nearest body of water to proposed project: * Cripple Creek 3b. Water Resources Classification of nearest receiving water: * WS-IV 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501010804 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Stream restoration and Stabilization are planned for the stream running through the YMCA of Catawba property. Buildings were built in 2005, 2008 and 2009. All area on the property is developed. Project property is surrounded by 1/4 acre developed home lots. Stream runs between two buildings with approximately 40 ft in most places between road access on one side and side walk on other side. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? * Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 1770 ft 4h. Explain the purpose of the proposed project: * The project purposed is to stabilize eroding banks and provide a stable channel pattern, profile and dimensions. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The 280ft upstream of the culvert crossing of 1st St. NW will be comprised of a bankfull bench, coir matting, seeding with native vegetation and planting a 25ft buffer on right side of the channel (facing downstream). Spot areas of bank erosion caused by overland concentrated flows from the parking area, will be stabilized with toe rock and rock stabilization. The 680 ft below the culvert will be graded to a stable pattern, profile and dimension. Two J-Hooks will be installed. I anticipate an excavator with a hydraulic thumb (possibly two), a bob cat and a dump truck will be used to construct the project. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: Blue line stream, no need for delineation 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: Stream runs through site, determination not needed 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans Unknown 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No. Strictly stream restoration/stabilization of an already built -out area. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 3. Stream Impacts Streams -tributaries Pond Construction Buffers 3a. Reason for impact (?) 3b.Impact type* 3c. Type of impact* 3d. S. name* 3e. Stream Type* (?) 3f. Type of Jurisdiction* 3g. S. width 3h. Impact length* S1 Bank Stabilization Temporary Bank Stabilization trib to Cripple Creek Perennial Both 9 Average (feet) 282 (linear feet) S2 Stream Restoration Permanent Stabilization Trib to Cripple Creek Perennial Both 9 Average (feet) 475 (linear feet) 3i. Total jurisdictional ditch impact in square feet: 0 3i. Total permanent stream impacts: 475 3i. Total stream and ditch impacts: 757 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 282 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The existing conditions of the bed and bank material were taken into consideration during the planning and design of this project. Areas where the channel was fundamentally stable only a bankfull bench installation has been planned. In areas where the channel has eroding banks and profile aggregation, a restoration has been planned to implement correct pattern, profile and dimensions. All areas worked on will have a minimum 10 ft buffer on each side planted with native vegetation. lb. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Project will only disturb what can be stabilized daily. Upper section should only take 1 to 3 days to construct and stabilize. Lower section (restoration) should be completed in 7 to 10 working days. Anticipated weather will be monitored daily. Design engineer or designated technical staff will be onsite daily to ensure areas are stabilized at the end of each day. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Project is a stream restoration/stabilization to fix existing erosion problems from and unstable stream. Project is not seeking mitigation credits nor does the site consist of development. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Area is not within a NC protected Buffer Area. Catawba Riparian Buffer Area is to protect existing buffers along the Catawba River mainstem below Lake James and along mainstem lakes from and including Lake James to the NC/SC border. NC Riparian Buffer Area Map was checked also. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? * Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No Comments: No development, no additional impervious area added. Project is only stream restoration and bank stabilization. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* Yes No Comments: * Funds are through the NC Community Conservation Cost Share program and Grant funds. Funds are a reimbursement of a percentage, of the total cost to the landowner, after installation is complete and approved. Such projects do not go through the State Clearing House 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* Yes No 3b. If you answered "no," provide a short narrative description. Site is completely developed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* Yes 5e. Is this a DOT project located within Division's 1-8? Yes No No Unknown 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? IPaC Species list has been included in the attachment. No Critical Habitat was noted. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * NC DWR Wadeable Streams Fish Community Assessment Maps. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* APE Analysis WebTool 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c. What source(s) did you use to make the floodplain determination?* Work will stop before FEMA flood study area begins Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or dreg and drop files here to attach document File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Cindy Morris Safrit, PE Signature CiblO/,y}. 5A r'r 16a- Date 9/16/2022