Loading...
HomeMy WebLinkAbout20221269 Ver 1_3608 Kemble Ridge_Attachment A_20220913Attachment A Proposed Bank Stabilization 3608 Kemble Ridge Drive, Raleigh The purpose of this project is to stabilize and repair a streambank which has failed and to remove concrete from an aerial sewer pipe. The project will temporarily impact a total of approximately 600 square feet of streambank on Toms Creek (Mill Creek) near 3608 Kemble Ridge Drive at 35.913900, - 78.515230 decimal degrees. Work will entail creating a dry work area, establishing a stable toe, constructing a stable bank using coir matting or a combination and establishing a stable segment of stream bed at the base of the bank. A sewer bypass system will be constructed based on the state of the sewer pipe after concrete removal. The site will be accessed from the existing sanitary sewer easement to the southwest of the site. The temporary disturbance will occur inside the maintained easement and tree removal will occur outside buffer zones. Erosion control measures will be installed prior to work A "pump around" will be established to create a dry work area. Disturbed areas will be reseeded and mulched when work is complete. It is expected that a rubber tire loader or skid steer loader and a dump truck will be used to place the boulders, reconstruct the streambank, and stabilize the streambank. Please see the five attached details; "pump around", temporary silt fence, temporary construction entrance, bank stabilization, and seeding details. // /111/. '_ IJJIf'7dfc2;, LJ111}!lti"r� LEGEND Stream (Toms Creek) DATA SOURCE: USATOPO MAPS r 0 Feet 2,000 fre 11111 JToms Creek����3608 Kemble Ridge Roadr►4..;4 35.913662, -78.514837 �q►:t ree-ti, ,. ...,..,„; aLt4 •-- rls�ttf� 1a. � jit SIT: F�2 ►iw+i�ri/ iii?.. tiii, tt, I, ),14,..7•or n �/p �7 r s-iT� Copyright:©i20 3 National Geographlc�Society, i-cubed ! f /R' r .. yr r ! � ., «� 1 r — A'lf + 3608 KEMBLE RIDGE DRIVE SANITARY SEWER REPAIR WAKE FOREST 24K QUADRANGLE FIGURE 1 EPCN APPLICATION 790000 FEET 780000 FEET 2140000 FEET 35°55'0"N 35°54'30"N 35°54'0"N 78°31'30"W 78°31'0' W 78°30'30"W 78°30'0"W 2150000 FEET 790000 FEET �✓G� o x310P11.4. MU 22.Z. ++ --Coach Cairt`erh Vd � a - A- I KATESCHATDR y 1� _'tee nutoyamils ,S Er'IMIZTY A MD v S3D03 0 o 35°55'0"N 35°54'30"N 35°54'0"N 780000 FEET 2140000 FEET 78°31'30"W 78°31'0"W 78°30'30"W 78°30'0"W 2150000 FEET NQRTHC.1RtiLL'V,4 •-i'` Cooperating Technical State FEMA COOPERATING TECHNICAL PARTNER This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach to floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's commitment to map flood hazard areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. FLOOD HAZARD INFORMATION SEE FIS REPORT FOR ZONE DESCRIPTIONS AND INDEX MAP FOR FIRM PANEL LAYOUT THE INFORMATION DEPICTED ON THIS MAP AND SUPPORTING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMAT AT HTTPS:// FR IS. N C.G OV/ FR IS HTTPS:// MSC. F E MA. G OV SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A,V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES 0.2% Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square Mile zone x Future Conditions 1% Annual Chance Flood Hazard zone x MY:A Area with Reduced Flood Risk due to Levee See Notes zone x Areas Determined to be Outside the 0.2% Annual Chance Floodplain Zone X Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall 1 I I I I I I I I I I I I I 4112)-18.2— Cross Sections with 1% Annual Chance Water Surface Elevation (BFE) Coastal Transect NOTES TO USERS For information and questions about this map, available products associated with this FIRM including historic versions of this FIRM, how to order products or the National Flood Insurance Program in general, please call the FEMA Map Information eXchange at 1-877-FEMA-MAP (1-877-336-2627) or visit the FEMA Map Service Center website at https://msc.fema.gov. An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at https://flood.nc.gov/ncflood, or contact the FEMA Map Service Center. Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well as the current FIRM Index. These may be ordered directly from the Map Service Center at the number listed above. For community and countywide map dates refer to the Flood Insurance Study report for this jurisdiction. To determine if flood insurance is available in the community, contact your Insurance agent or call the National Flood Insurance Program at 1-800-638-6620. Flood Insurance Study (FIS) means an examination, evaluation, and determination of flood hazards, corresponding water surface elevations, flood hazard risk zones, and other flood data in a community issued by the North Carolina Floodplain Mapping Program (NCFMP). The Flood Insurance Study (FIS) is comprised of the following products used together: the Digital Flood Hazard Database, the Water Surface Elevation Rasters, the digitally derived, autogenerated Flood Insurance Rate Map and the Flood Insurance Survey Report. A Flood Insurance Survey is a compilation and presentation of flood risk data for specific watercourses, lakes, and coastal flood hazard areas within a community. This report contains detailed flood elevation data, data tables and FIRM indices. When a flood study is completed for the NFIP, the digital information, reports and maps are assembled into an FIS. Information shown on this FIRM is provided in digital format by the NCFMP. Base map information shown on this FIRM was provided in digital format by the NCFMP. The source of this information can be determined from the metadata available in the digital FLOOD database and in the Technical Support Data Notebook (TSDN). ACCREDITED LEVEE NOTES TO USERS: If an accredited levee note appears on this panel check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection for areas on this panel. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at https://www.fema.gov/national-flood-insurance-program. PROVISIONALLY ACCREDITED LEVEE NOTES TO USERS: If a Provisionally Accredited Levee (PAL) note appears on this panel, check with your local community to obtain more information, such as the estimated level of protection provided (which may exceed the 1-percent-annual-chance level) and Emergency Action Plan, on the levee system(s) shown as providing protection for areas on this panel. To maintain accreditation, the levee owner or community is required to submit the data and documentation necessary to comply with Section 65.10 of the NFIP regulations. If the community or owner does not provide the necessary data and documentation or if the data and documentation provided indicate the levee system does not comply with Section 65.10 requirements, FEMA will revise the flood hazard and risk information for this area to reflect de -accreditation of the levee system. To mitigate flood risk in residual risk areas, property owners and residents are encouraged to consider flood insurance and floodproofing or other protective measures. For more information on flood insurance, interested parties should visit the FEMA Website at https://www.fema.gov/national-flood-insurance-program. LIMIT OF MODERATE WAVE ACTION NOTES TO USERS: For some coastal flooding zones the AE Zone category has been divided by a Limit of Moderate Wave Action (LiMWA). The LiMWA represents the approximate landward limit of the 1.5-foot breaking wave. The effects of wave hazards between the VE Zone and the LiMWA (or between the shoreline and the LiMWA for areas where VE Zones are not identified) will be similar to, but less severe than those in the VE Zone. SCALE Map Projection: North Carolina State Plane Projection Feet (Zone 3200) Datum: NAD 1983 (Horizontal), NAVD 1988 (Vertical) 1 inch = 500 feet 1:6,000 0 250 500 1,000 Feet Meters 0 75 150 300 PANEL LOCATOR Durham 0874-0884-9894- Granville 1804 0873 0883 r 0872 0893 1803 1813, 1823 0882 0892 1802 1812 1822 1832- .1842 1852 0759 0769 i 0,779 081 ' 0880 0891 1801 1811 1821 1831 1841 1851 1861 0890 1800 1810 1820 1830 1840 1850 1860 1870 Franklin 0789 0799 1709 1719 1729 1739 1749 1759 1769 1779' 1789- -1799 0758 0768 0778 0788 0798 1708 1718 1728 1738 a3 1758 1768 1778 1788 1798 2708 0727 0737 0747 0757 J 0767 0777 0787 0797 1707 1717 1727 1737 1747 1757 0726 0736 0746 0756 0766 0776 0786 0796 1706 1716 1726 1736 1746 1756 1766 1787 1797 2707 -2\ 17 1786 1796 2706 2716 0704 0725 0735 0745 0755 0765 0775 0785 0795 1705 1715 1725 1735 1745 1755 1765 1775 1785 1795 2705 2715 ,2725 /0724 0734 0744 0754 0764 0774 0784 0794 1704 1714 1724 1734 1744 1754 1764 1774 1784 1794 2794 7/2714 0713' 0723 0733 0743 0753 0763 0773 0783 0793 1703 1713 1723 1733 1743 1753 1763 1773 1783 i.1733 2703 0712 0722 0732 0742 0752 0762 0772 0782 0792 1702 1712 1722 1732 1742 1752 1762 1772'1782 0711 0721 0731 0741 0751 0761 0771 0781 0791 1701 1711 1721 1731 0700 0710 0720 0730 0740 0750 0760 0770 0780 0790 1700 1710 1720 1730 1741 1751 / 1740/1750 1761 1771 2f 4') 4m111 {p7 4lJ NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 1748 Panel Contains: COMMUNITY RALEIGH, CITY OF ROLESVILLE, TOWN OF WAKE COUNTY WAKE FOREST, TOWN OF FEMA CID PANEL SUFFIX 370243 1748 K 370468 1748 K 370368 1748 K 370244 1748 K OTHER FEATURES Coastal Transect Baseline Profile Baseline Hydrographic Feature Limit of Study Jurisdiction Boundary Limit of Moderate Wave Action (LiMWA) /b608 I 0628 0649 0659 0669 0679 0689 0699 1609 1619 1629 1639 1 649 0648 0658 0668 0678 0688 0698 1608 1618 1628, 1638 0606 Wake 0647 0657 0667 0677 0687 0697 1607 0646 0656 0666 0676 0686 0696 1606/ 1617/ / 1616 1627 0645 0655,-0665 0675 0674 0684/ /1605 VERSION NUMBER 2.3.3.2 MAP NUMBER 3720174800K MAP REVISED July 19, 2022 Attachment A Proposed Bank Stabilization 3608 Kemble Ridge Drive, Raleigh The purpose of this project is to stabilize and repair a streambank which has failed and to remove concrete from an aerial sewer pipe. The project will temporarily impact a total of approximately 600 square feet of streambank on an unnamed tributary of Toms Creek (Mill Creek) near 3608 Kemble Ridge Drive at 35.913900, -78.515230 decimal degrees. Work will entail creating a dry work area, establishing a stable toe, constructing a stable bank using coir matting or a combination and establishing a stable segment of stream bed at the base of the bank. A sewer bypass system will be constructed based on the state of the sewer pipe after concrete removal. The site will be accessed from the existing sanitary sewer easement to the southwest of the site. The temporary disturbance will occur inside the maintained easement. Erosion control measures will be installed prior to work. A "pump around" will be established to create a dry work area. Disturbed areas will be reseeded and mulched when work is complete. It is expected that a rubber tire loader or skid steer loader and a dump truck will be used to place the boulders, reconstruct the streambank, and stabilize the streambank. Please see the five attached details; "pump around", temporary silt fence, temporary construction entrance, bank stabilization, and seeding details. F�2 City of Raleigh, 3608 Kemble Ridge Drive, Stream Stabilization Photograph 1, View of sewer pipe, Facing Northeast (Dated June, 2022). Photograph 2, View of sewer pipe and boulders, Facing East (Dated June, 2022). F�2 City of Raleigh, 3608 Kemble Ridge Drive, Stream Stabilization Photograph 3, View of easement access, Facing Southwest (Dated June 2022). Photograph 4, View of easement access, Facing Northeast (Dated June 2022). TEMPORARY CONSTRUCTION ENTRANCE SILT FENCE ACCESS ROUTE ALONG EASEMENT TREE REMOVAL OUTSIDE OF BUFFER ZONES SANITARY SEWER BYPASS PUMP Property Raleigh Sewer op Sewer Manhole Gravity Sewer Lateral USGS Blue Line Streams 3608 Kemble Ridge Drive i 0 100 200 Disclaimer 400 ft iMaps makes every effort to produce and publish the most current and accurate information possible. i i i I i i i , However, the maps are produced for information purposes, and are NOT surveys. No warranties, expressed or implied 1 inch equals 200 feet ,are provided for the data therein, its use,or its interpretation. EXISTING ROADWAY x 50' MIN. AND SUFFICIENT TO KEEP X X SEDIMENT ON SITE Q°000 000 �0000 0 000 0 00000 00 00 0 000 00 0 00 00000000Q 0000 QOO 0o o 000 0 0 0 00000000 00 0000p000oO 0000 00 000 0 0 0 0 00 OOO o00 00000 0 000 0 0 0 00 p00pp00 00 3"-4"STONE TO BE USED o0 o0 oo 0 00 ( SURGE STONE OR 000 0000 o RAILROAD BALAST ) ooc o0o00 0 00 00 0 0 0 00 00 000 0 0,000p 0 000 0 00°0000 0 000000 0 0 000 0 Q O 000 00 000 000 00000 00 0 0000 000000 00 00 0000 6O'0Z-MS c-) m 0 zz 70 xj D z 0 c7 m0 z OZOZl9:31V0 3lVOS 0110N HOITIVHI 30 AIIJ PLAN SILT FENCE (SEE NOTE 1) EXISTING ROADWAY 6" MIN. 25' OR FULL WIDTH OF PROPOSED STREET OR ENTRANCE, WHICHEVER IS GREATER. 35' MIN. NOTES: 1. SILT FENCE SHOULD BE INSTALLED TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF MUD IS NOT REMOVED FROM THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD OR THE LENGTH OF THE CONSTRUCTION ENTRANCE EXTENDED. 15' MIN. NEW CONSTRUCTION 160 0 0 0 00 0Q O 0000o0 0 00 o0 000 o0 0000000 00000 0 00 0 00000000 0 000000000 00 12"MIN. o00000 000000op0o0oo0og000000000000000000 0000 000000IIII :offa° _ _ _o 00000 00000 0 0 00— III III —III I—III—III-11 7111EWEWE11HE 11=III=III- 111E111E1117 111E111E11E11E11 -III- FABRIC UNDER STONE - I1 CROSS SECTION MAINTENANCE: ADD ADDITIONAL STONE AND "FLUFF" TOP DRESSING WITH 2" STONE. SEE N.C. DEQ EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATION & DESIGN CRITERIA. EXISTING GROUND TIE TO GRADE �{ T MIN '11 R�11%�1-- T 71;18 It��% ' .CII11!►1.11i1�� .LARGER lAtApw` �i���• itAT E�I'Z� '11 ��1i �Gl�: i i11%11�G1i11`% GEOTEXTILE FABRIC=�1�1,'1i1�i ��,C1� �11.J1 11• COMPACTED NATIVE SOIL !� Qj1�o1!1� „1 NOTES: 1. RIP RAP AND GEOTEXTILE ALONE SHOULD NOT BE USED ON SLOPES GREATER THAN 2H:1V. 1.5 T MIN 2. ON SLOPES BETWEEN 2H:1V AND 1.5H:1V RIP RAP MAY BE BEDED IN 6" OF #57 STONE. CONSULT ENGINEER PRIOR TO INSTALLATION. 3. THICKNESS OF RIP RAP (T) SHOULD BE NO LESS THAN 1.5 X D50 (APPROXIMATELY 21" FOR CLASS II). 4. DEPTH OF THE TOE SHOULD BE APPROXIMATELY 1.5 X THICKNESS (APPROXIMATELY 30" FOR CLASS II). 5. RIP RAP SLOPE PROTECTION IS MODIFIED FROM VDH&T AND NCDENR LAND QUALITY SECTION EROSION AND SEDIMENT CONTROL DESIGN MANUAL. STREAM BANK STABALIZATION MAINTENANCE: CLEAN OUT AT 50% CAPACITY LIFE OF FENCING: 6-9 MONTHS 10'0Z-MS 30N3d (l1ISI1N3W1a3S) l�JV OdW31 ab`dONV±S OZOZl9:31V0 TWOS 0110N HOITIVHI 30 AIIJ MIN. 10 GA. LINE WIRES 1 MIN =1 STEEL POST 5" MIN WOVEN WIRE FABRIC FILL SLOPE GRADE 11EI I I -III- 1E1 I-111E11' 111E111E1' EWE!' III I- 1T1=11 1 11= MIN SILT FENCE GEOTEXTILE FABRIC SIDE VIEW VARIABLE AS DIRECTED BY THE ENGINEER 1 r •iiiii tOiO�i�iO�i ♦������• ��������� ��` SILT FENCE FABRIC INSTALLED TOSECOND 1�������♦ di����������������� • ���OON WIRE FROMTOP '.�♦:.�:e••�.�,• III II 11 1111 111 111 111-III III-III-III-III-IIIIII-111-11 FRONT VIEW 11 11 11 11 111 11 I El 11 III III 1;1 III 11 NOTES: 1. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION SPECIFICATIONS, WHERE PRACTICE APPLIES AND PLANNING CONSIDERATIONS. 4. SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED SLOPES GREATER THAN 10' IN HEIGHT. PLASTIC OR WIRE TIES MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE PROVIDE HIGH STRENGTH DOUBLE STITCHED J TYPE SEAMS HEAVY DUTY DIRTBAG 55 OR EQUAL SEWN IN SPOUT i HIGH STRENGTH STRAPPING FOR HOLDING HOSE IN PLACE WATER FLOW FROM PUMP OPENING TO ACCOMMODATE UP TO 4" DISCHARGE HOSE AGGREGATE UNDERLAYMENT (3" THICK NCDOT NO, 57 STONE) Ati OA PA i f SEDIMENT DIKE ACCEPTED DEWATERING DEVICE (SILT BAG) PROVIDE POSITIVE DRAINAGE FROM SILT BAG TO STREAM FLOW DISCHARGE HOSES INTAKE HOSE CLEAN WATER DIKE STREAM DIVERSION PUMPS INTAKE HOSE FLOW SUMP -HOLE OR POOL (12"TO 18" DEEP, 2' DIA.) DEWATERING BAG NOTES: 1. THE DEWATERING BAG SHALL BE MADE OF NON -WOVEN GEOTEXTILE WITH A MIN. SURFACE AREA OF 225 SQUARE FEET. 2. ALL STRUCTURAL SEAMS SHALL BE SEWN WITH A DOUBLE STITCH USING A DOUBLE NEEDLE MACHINE WITH HIGH STRENGTH THREAD. 3. THE SEAM STRENGTH SHALL WITHSTAND 100 LB/IN USING ASTM D-4884 TEST METHOD. 4. THE GEOTEXTILE FABRIC SHALL BE A 10 OZ NON -WOVEN FABRIC. 5. DISCHARGE FROM THE DEWATERING BAG SHALL BE DIRECTED SUCH THAT PRE -DISTURBANCE HYDROLOGY IS NOT CHANGED. DEWATERING BAG WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY PLAN VIEW NOTES: 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE INTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIP RAP OR SANDBAGS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A DEWATERING BASIN, SEDIMENT BAG, OR OTHER ACCEPTED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING OUTLET EROSION BETWEEN THE SILT BAG AND CHANNEL. 3. AT THE END OF EACH WORK DAY, THE DISTURBED CHANNEL SHALL BE MATTED. 4. WHEN REPLACING CULVERTS, THE CONTRACTOR SHALL PLACE SAND BAGS ACROSS THE ENTIRE DOWNSTREAM FACE OF EACH PIPE TO PREVENT BACKFLOW DURING PUMP AROUND ACTIVITIES. PUMP AROUND DETAIL SEDIMENT AND EROSION CONTROL NOTES: UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE EROSION CONTROL LAWS OF THE STATE OF NORTH CAROLINA, SPECIFICALLY THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS AMENDED, AND THE LOCAL EROSION AND SEDIMENT CONTROL ORDINANCES. THE FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND SHALL APPLY TO ALL CONSTRUCTION ACTIVITIES WITHIN PROJECT LIMITS: 1. INSTALL SILT FENCE, CHECK DAMS, AND INLET PROTECTION DEVICES AS DEPICTED ON DRAWINGS AND IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. 2. THE EROSION CONTROL REVIEW AND INSPECTION WILL BE ADDRESSED BY NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL AND NATURAL RESOURCES (NCDENR) LAND QUALITY SECTION, NOT THE CITY OF RALEIGH. 3. AREAS WHICH ARE NOT TO BE DISTURBED SHALL BE CLEARLY MARKED BY FENCING, FLAGS, SIGNS, ETC. 4. UPON ACCEPTANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, COMMENCE EXCAVATION AND/OR GRADING ACTIVITIES. THE CONTRACTOR WILL BE RESTRICTED TO A 25 FOOT WIDE AREA FOR EXCAVATION, EQUIPMENT STAGING ACTIVITIES AND TEMPORARY STOCKPILING OF EXCAVATED SOIL ALONG THE LENGTH OF PIPELINES 4-INCH THROUGH 8-INCH AND 30-FOOT WIDE ALONG THE LENGTH OF PIPELINES 12-INCH THROUGH 20-INCH. TEMPORARILY STOCKPILED MATERIAL SHALL BE PLACED UPSLOPE OF THE EXCAVATION. FOR ANY DEMOLITION OR OTHER ACTIVITIES DESIRED PRIOR TO COMPLETION OF ALL EROSION AND SEDIMENT CONTROL MEASURES, INTERIM MEASURES ACCEPTABLE TO AND PRE -APPROVED BY ENGINEER, AND NCDENR DIVISION OF ENERGY, MINERAL LAND RESOURCES, LAND QUALITY SECTION MUST BE PROVIDED. 5. LIMIT CLEARING AND GRUBBING OF THE TRENCH TO THE AMOUNT OF PIPE THAT CAN BE CONSTRUCTED IN ONE DAY. LIMIT TRENCH EXCAVATION TO THE AMOUNT OF PIPE THAT CAN BE CONSTRUCTED AND BACKFILLED IN ONE DAY, OR 50 LINEAL FEET, WHICHEVER IS LESS. EXCAVATED TRENCH MATERIAL MUST BE STOCKPILED UPSLOPE OF THE TRENCH. OPEN TRENCHES SHALL BE BACKFILLED AND STABILIZED AT THE CESSATION OF EACH WORK DAY. ALL DISTURBED SURFACES MUST RECEIVE TEMPORARY STABILIZATION AT THE END OF EACH WORK DAY. PROVIDE PUMP FILTER BAGS OR OTHER APPROVED DEWATERING DEVICES FOR DEWATERING OF TRENCH EXCAVATION AS NEEDED. SOIL SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED WITHIN SEVEN DAYS AFTER THE PIPELINE/UTILITY LINE IS CONSTRUCTED. ANY TEMPORARY ACCESS CONSTRUCTED FOR PIPELINE WORK MUST BE STABILIZED WITH A NON -GRADE AGGREGATE. 6. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES ONCE PER SEVEN DAYS, AND IMMEDIATELY FOLLOWING ANY RAINFALL OF 0.5" OR MORE IN A 24-HOUR PERIOD. SEDIMENT ACCUMULATIONS ALONG SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE PROMPTLY REMOVED. THE PROJECT SUPERINTENDENT SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. 7. EROSION AND SEDIMENT CONTROL WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION AND BUILDUP OR CLOGGING WITH SEDIMENT. CORRECTIVE ACTION WILL BE TAKEN IMMEDIATELY. 8. ANY AREAS WHICH ARE NOT TO BE FURTHER GRADED WITHIN A 14-DAY PERIOD, OR WHICH HAVE NOT BEEN GRADED WITHIN 14 DAYS SHALL BE SEEDED IN ACCORDANCE WITH THE FOLLOWING: SITE DESCRIPTON STABILIZATION TIME TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES, AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND ZONES FN E&SC Notes SEDIMENT AND EROSION CONTROL NOTES CONTINUED: 9. PERMANENTLY STABILIZE ALL DISTURBED AREAS BY SEEDING AND MULCHING PER THE STANDARD DETAILS. 10. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. UPON FINAL ACCEPTANCE OF COMPLETE STABILIZATION OF THE SITE BY THE ENGINEER AND NCDENR, REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES MAY BE REMOVED. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES TO BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. 11. UPON COMPLETION OF PROJECT, THE SELF-INSPECTION/SELF-MONITORING FORMS SHALL BE SUBMITTED TO THE ENGINEER FOR CONVEYANCE TO THE OWNER FOR REGULATORY RECORD MAINTENANCE TIME PERIOD. 12. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT WITH PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING, AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA (STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER). 13. SITES UTILIZED BY THE CONTRACTOR FOR THE PURPOSE OF STORING EQUIPMENT, EXCESS EXCAVATED MATERIALS, STRIPPED TOPSOIL, ETC, SHALL BE ENVIRONMENTALLY SUITABLE FOR SUCH PURPOSES AND SHALL BE APPROVED IN ADVANCE BY THE OWNER. ENVIRONMENTALLY SUITABLE SITES SHALL BE LEVEL, DEVOID OF MATURE STANDS OF TREES, AND ISOLATED FROM DRAINAGE FACILITIES AND FEATURES, WETLANDS STREAMS, AND STREAM CORRIDORS. SITES SHALL COMPLY WITH ALL EROSION AND SEDIMENT CONTROL REQUIREMENTS OF THE TOWN OF CARY. 14. THE CLEANUP AND DISPOSAL OF EXCESS EXCAVATED MATERIALS SHALL BE DONE AS SOON AS PRACTICAL AND AS THE OWNER MAY DIRECT. 15. CHECK DAMS, SILT FENCE, OR OTHER FILTERING DEVICES SHALL BE MAINTAINED AT AREAS OF STOCKPILED MATERIALS, EXCAVATED AREAS, CATCH BASINS, AND OTHER STORM WATER INLET STRUCTURES IN CONSTRUCTION AREAS TO CONTROL SILT RUNOFF. 16. ALL DEWATERING FLOWS SHALL BE KEPT FREE OF SILT, SEDIMENT, DEBRIS, AND OTHER POLLUTANTS THROUGH APPROPRIATE MEANS (SETTLING BASINS, FILTER, ETC.). FOLLOWING THIS, THE FLOWS SHALL ONLY BE RELEASED DIRECTLY INTO STORM SEWERS, STREAM CHANNELS, TO OTHER STABILIZED DRAINAGE COURSES AND NOT INTO EXPOSED SOILS, STEEP SLOPES, OR ANY OTHER SITE WHERE FLOWS COULD CAUSE FURTHER DAMAGE. 17. CUT AND FILL SLOPES ARE TO BE VERTICALLY TRACKED, HORIZONTALLY SCARIFIED, MATTED, OR OTHERWISE CONSTRUCTED TO ENHANCE VEGETATIVE GROWTH AND EXPEDITE STABILIZATION. SEEDING SHALL BE INSTALLED AS PORTIONS OF THESE SLOPES ARE COMPLETED. 18. THE EXISTING EROSION CONTROL FEATURES SUCH AS ROCK CHECK DAMS AND RIP RAP ALONG THE NEW RECLAIMED WATERLINE ROUTE MUST BE REMOVED AND REPLACED TO FACILITATE INSTALLATION OF THE NEW RECLAIMED WATERLINE AS SHOWN. 19. IF AT ANY TIME BEFORE THE EXPIRATION OF THE CONTRACT BOND ANY PART OF THE SEEDED AREA IS NOT IN GOOD CONDITION, THE CONTRACTOR SHALL FERTILIZE AND RESEED AS OFTEN AS NECESSARY TO GET A GOOD STAND OF GRASS. 20. CONTRACTOR SHALL NOT CROSS ANY DITCH WHEN FLOWING WATER IS PRESENT OR DURING WET WEATHER UNLESS A PUMP AROUND SYSTEM IS PROVIDED DURING INSTALLATION OF PIPELINE (SEE DETAIL). PRIOR TO CROSSING A DITCH, CONTRACTOR SHALL VERIFY THAT A TEMPORARY SEDIMENT TRAP OR CHECK DAM EXISTS DOWNSTREAM OF CROSSING PRIOR TO INSTALLATION OF PIPELINE. IMMEDIATELY AFTER BACKFILLING OF PIPELINE, DITCH SHALL BE RESTORED TO ORIGINAL GRADE AND STABILIZED. USE EXCELSIOR MATTING OR RIP RAP AS NECESSARY TO STABILIZE THE DITCH. INSPECT DITCHES IMMEDIATELY AFTER WET WEATHER EVENT FOR STABILIZATION. 21. WHENEVER CONSTRUCTION CAUSES LAND DISTURBANCE OF ANY KIND WITHIN THE LIMITS OF A DITCH, THE CONTRACTOR MUST INSTALL EXCELSIOR MATTING OR RIP RAP AS NECESSARY TO STABILIZE THE DITCH. 22. ALL OPEN CUT CROSSINGS OF DITCHES SHALL BE COMPLETED IN ONE WORK DAY. 23. ALL CHECK DAMS SHOULD APPROPRIATELY FILL THE DITCH THEY ARE PLACED IN, SO THAT DRAINAGE IS FORCED THROUGH THE STRUCTURE. THE ENGINEER WILL NOTIFY THE CONTRACTOR IN WRITING IF ANY CHECK DAM IS INSUFFICIENTLY SIZED BASED ON THE ENGINEER'S JUDGEMENT. CONTRACTOR WILL REMEDY THE PROBLEM WITHIN 3 DAYS. FN E&SC Notes SEDIMENT AND EROSION CONTROL NOTES CONTINUED: 24. GROUND STABILIZATION SHALL BE ACHIEVED CONSISTENT WITH NC DENR GENERAL PERMIT NCG010000 EFFECTIVE AS OF APRIL 1, 2019. WHERE LAND DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, ALL DISTURBED AREAS SHALL BE PROVIDED WITH TEMPORARY OR PERMANENTLY STABILIZATION WITH GROUND COVER WITHIN 14 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY EXCEPT FOR ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3:1 (H:V), WHICH SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER WITHIN 7 CALENDAR DAYS FROM THE LAND DISTURBING ACTIVITY. 25. IF EXCAVATED SOIL IS PLACED ON ANY ROADWAY PAVEMENT DURING CONSTRUCTION, CONTRACTOR SHALL PROVIDE SAND OR SCREENING FINES ALONG PAVEMENT SURFACE FOR SUFFICIENT REMOVAL OF SEDIMENT. 26. IN THE EVENT THAT SEEDING IS PERFORMED AFTER EXCELSIOR MATTING IS PLACED AS A STABILIZING FEATURE, IT WILL BE NECESSARY TO REMOVE THE MATTING WHEN APPLYING GRASS SEED AND FERTILIZER. CONTRACTOR MUST REPLACE THE MATTING AT THE END OF EACH DAY TO STABILIZE THE SOILS. 27. SPOIL OR DEBRIS SHALL NOT BE PLACED WITHIN 50' OF STORM DRAINS OR STREAMS. 28. PROVIDE PORTABLE SELF-CONTAINED CONCRETE TRUCK WASHOUT SYSTEM. ALL CONCRETE TRUCKS WILL UTILIZE PORTABLE WASHOUT SYSTEM FOR CLEAN OUT. NO CONCRETE TRUCK WASHOUT WILL BE ALLOWED TO REACH GROUND, AND NO CONCRETE WASHOUT DEBRIS SHALL BE ALLOWED ON GROUND. 29. REMOVE DEMOLITION DEBRIS FROM SITE ON A DAILY BASIS AND DISPOSE IN ACCORDANCE WITH APPLICABLE REGULATIONS. 30. HYDROSEEDING SHALL NOT BE ALLOWED ON THIS PROJECT. CRIMPING STRAW MULCH SHALL NOT BE ALLOWED ON THIS PROJECT. 31. SEED SHALL BE UNIFORMLY BROADCAST AND LIGHTLY CULTIVATED PRIOR TO MULCH AND TACKIFER OPERATIONS. 32. MULCH AND TACKIFIER OPERATIONS SHALL BE COMPLETED WITHIN 24 HOURS OF SEEDING. 33. CONTRACTOR STAGING, TEMPORARY STORAGE, LAY DOWN AREAS, AND DIRT PILES SHALL BE WITHIN LIMITS OF DISTURBANCE. 34. OBTAIN AND PAY FOR EROSION CONTROL PERMITS FOR OFF -SITE STORAGE YARD, BORROW AREA, AND DISPOSAL AREAS AS REQUIRED. INSTALL AND MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH APPROVED PLAN. 35. A LAYER OF SAND, FINES, OR SCREENINGS SHALL BE PLACED ON PAVED SURFACES BEFORE DEPOSITION OF EXCAVATED MATERIAL. AFTER REMOVAL OF EXCAVATED MATERIAL FROM PAVED SURFACES, A MECHANICAL SWEEPER SHALL BE USED TO REMOVE ALL MATERIAL FROM PAVED SURFACES. PAVED SURFACES SHALL BE SWEPT ON A DAILY BASIS WITH MATERIAL PLACED ON NON -PAVED SURFACES WITHIN LIMITS OF DISTURBANCE. 36. ON SLOPES GREATER THAN 5:1, DITCHES, PLACE EROSION CONTROL BLANKET IMMEDIATELY AFTER BACKFILL AND GRADING. 37. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF -INSPECTION PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 48.0131. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, A COMBINED FORM IS NOW AVAILABLE. THE NEW FORM WAS DEVELOPED TO SATISFY REQUIREMENTS OF THE SEDIMENTATION POLLUTION CONTROL ACT AND THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES, NCG010000. BEGINNING AUGUST 1, 2013, THE DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES IS RESPONSIBLE FOR ADMINISTERING BOTH THE SPCA AND THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES, NCG 010000. THE COMBINED FORM SHOULD MAKE IT EASIER TO COMPLY WITH SELF -INSPECTION REQUIREMENTS. THE COMBINED SELF -MONITORING FORM IS AVAILABLE AS A PDF AND WORD DOCUMENT FROM THE LAND QUALITY WEB SITE, HTTP://PORTAL.NCDENR.ORG/WEB/LR/EROSION. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE LAND QUALITY SECTION OF THE RALEIGH DENR OFFICE AT (919) 791-4200. F�2 E&SC Notes HERBACEOUS PLANTS -Seeding recommendations for primary stabilization Successful) development depends on planting date (effectiveness goal: 6 mo. - 3 yrs. without an ongoing maintenance program) NATIVE SPECIES Table 6.11.c (con't) Op imal Planting Dates Common Name Botanical Name / Cultivar Native / Introduced See Table 6.11.d for variety seedling rates Fertilization/ limestone Ibs/acre Mountains Piedmont coastal Sun/Shade Plains tolerant Wetlands Riparian Buffers Invasive Yes or No Installation / Maintenance Considerations Other information, commentary Indiangrass Sorghastrum nutans/ N B By soil test 12/1-4/15 12/1 - 4/1 12/1-4/1 Sun NR Well No Responds well to controlled Western coastal plain only Cheyenne drained burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. I ndiangrass Sorghastrumnutans/ N B By soil test NR 12/1-5/1 1 /1 -5/1 Sun NR Well No Responds well to Only I ndiangrass adaptable to Lomenta drained controlled burns. Mix with Eastern coastal plain (Zone 8) 3 to 5 other seed varieties that have similar soil drainage adaptations. Deertongue Dichanthelium N C By soil test 5/1-4/15 5/1 - 4/1 NR Sun & Yes Poorly No Responds well to clandestinum/Tioga Shade drained to controlled burns. Mix with drought 3 to 5 other seed varieties that have similar soil drainage adaptations. Big Bluestem Andropogon gerardii/ N D By soil test 12/1-4/15 12/1 - 4/1 NR Sun NR Weill No Responds well to Warm season grass Rountree drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Big Bluestem Andropogon gerardii/ N D By soil test 12/1-4/15 12/1 - 4/1 NR Sun NR Weill No Responds well to Warm season grass Kaw drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Big Bluestem Andropogon gerardii/ N D By soil test 12/1-4/15 12/1 - 4/1 12/1-5/1 Sun NR Weill No Responds well to Warm season grass Earl drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Little Bluestem Schizachyrium N E By soil test 12/1-4/15 NR NR Sun NR Weill No Responds well to Warm season grass scoparium/Aldous drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Little Bluestem Schizachyrium N E By soil test 12/1-4/15 12/1 - 4/1 NR Sun NR Weill No Responds well to Warm season grass scoparium/Cimmaron drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Practice Standards and Specifications HERBACEOUS PLANTS -Seeding recommendations for primary stabilization Successful) development depends on planting date (effectiveness goal: 6 mo. - 3 yrs. without an ongoing maintenance program) NATIVE SPECIES Table 6.11.c (con't) Op imal Planting Dates Common Name Botanical Name / Cultivar Native / Introduced See Table 6.11.d for variety seedling rates Fertilization/ limestone Ibs/acre Mountains Piedmont coastal Sun/Shade Plains tolerant Wetlands Riparian Buffers Invasive Yes or No Installation / Maintenance Considerations Other information, commentary Little Bluestein Schizachyrium N E By soil test NR NR 12/1-4/1 Sun NR Weill No Responds well to Warm season qrass scoparium/Common drained controlled burns. Mix with 3 to 5 other seed varieties that have similar soil drainage adaptations. Sweet Woodreed Cinna arundinacea N F By soil test 12/1-4/15 12/1 - 4/1 12/1-4/1 Sun & Yes Poorly to No Mix with 3 to 5 other seed Warm season grass mod. Shade well drained varieties that have similar soil drainage adaptations Rice Cutgrass Leersia oryzoides N G By soil test 12/1-4/15 12/1 - 4/1 12/1-4/1 Sun Yes Poorly No Mix with 3 to 5 other seed Warm season grass drained varieties that have similar soil drainage adaptations Indian Woodoats Chasmanthium Iatifolium N H By soil test 3/1 - 5/15 2/15 - 4/1 2/15-3/20 Sun & NR Well No Mix with 3 to 5 other seed Cool season grass 7/15-8/15 3/15 - 10/1E9/1 - 11/1 mod. Shade drained varieties that have similar soil drainage adaptations Virginia Wild Rye Elymus virginicus N I By soil test 3/1 - 5/15 2/15 - 4/1 2/15-3/20 Sun & NR Well No Mix with 3 to 5 other seed Cool season grass 7/15-8/15 3/15 - 10/1E9/1 - 11/1 mod. Shade drained varieties that have similar soil drainage adaptations Eastern Bottlebrush Elymus hystrix N J By soil test 3/1 - 5/15 2/15 - 4/1 NR Sun & NR Well No Mix with 3 to 5 other seed Cool season grass Grass 7/15-8/15 3/15 - 10/15 mod. Shade drained varieties that have similar soil drainage adaptations Soft Rush Juncus effusus N K By soil test 12/1 - 5/15 12/1 - 5/1 12/1-4/15 Sun Yes Poorly No Mix with 3 to 5 other seed 8/15-10/15 9/1 - 11/1 drained varieties that have similar soil drainage adaptations Shallow Sedge Carex /urida N L By soil test 12/1 - 5/15 12/1 - 5/1 12/1-4/15 Sun Yes Poorly No Mix with 3 to 5 other seed 8/15-10/15 9/1 - 11/1 drained varieties that have similar soil drainage adaptations Fox Sedge Carex vulpinoidea N L By soil test 12/1 - 5/15 12/1 - 5/1 12/1-4/15 Sun Yes Poorly No Mix with 3 to 5 other seed 8/15-10/15 9/1 - 11/1 drained varieties that have similar soil drainage adaptations NOTE: 1. Seeding rates are for hulled seed unless otherwise noted. 2. Fertilizer & Limestone - rates to be applied in absense of soils tests. Recommended application rate assumes significantly disturbed site soils with little or no residual value. 3. NR means Species not recommended for this region or application area. 4. Native, warm season grasses require six or more months to germinate under optimum conditions. If they are planted in the summer, then a whole year will have to pass before they germinate. 5. Invasive designation as determined by the N.C. Exotic Pest Pant Council and N.C. Native Plant Society . 6. Sprigging is not recommended for immediate stabilization unless terrain is flat, heavymulch is applied and no other immediate stabilization method is practical. 7. Sodding for immediate stabilization - see primary stabilization charts (other information column) and Section 6.12. 8. Long term stabilization can only be accomplished with an adequate, immediate, and primary stabilization program. To achieve long term protective cover with the species listed in this chart, the approved plan, construction sequence and maintenance schedule must include sufficient detail to assure vegetation will be established and maintained. To assure the long term protective cover will be established, the reviewing and approving governing body may require a performance/maintenance bond. Practice Standards and Specifications Table 6.11.d Seed Mixes for Native Species (Ibs/ac) When Mixed with 3, 4, or 5 Other Native Species (See Table 6.11.a for nurse crop species to be added to these mixes) 3 Other (total 4 species) 4 Other (total 5 species) 5 Other (total 6 species) Switch Grasses (A) 3.5 Ibs. 3.0 Ibs. 2.5 Ibs. Indian Grasses (B) 7.0 Ibs. 6.0 Ibs. 5.0 Ibs. Deertongue (C) 6.0 Ibs. 5.0 Ibs. 4.0 Ibs. Big Bluestem (D) 7.0 Ibs. 6.0 Ibs. 5.0 Ibs. Little Bluestem (E) 7.0 Ibs. 6.0 Ibs. 5.0 Ibs. Sweet Woodreed (F) 2.5 Ibs. 2.0 Ibs. 1.5 lbs. Rice Cutgrass (G) 6.0 Ibs. 5.0 Ibs. 4.0 Ibs. Indian Woodoats (H) 2.5 Ibs. 2.0 Ibs. 1.5 lbs. Virginia Wild Rye (I) 6.0 Ibs. 5.0 Ibs. 4.0 lbs. Eastern Bottlebrush Grass (J) 2.5 Ibs. 2.0 Ibs. 1.5 lbs. Soft Rush (K) 2.5 lbs. 2.0 lbs. 1.5 lbs. Sedges (L) 2.5 Ibs. 2.0 Ibs. 1.5 Ibs. NOTE: With the native varieties, the seed mix should be in the range of 15 pounds per acre. Depending on availability of native seeds adaptable to North Carolina, the percentage of a particular variety used may be reduced or increased accordingly. Although diversity is desirable, it is imperative that the primary crop develop and become an effective protective cover. In addition to the native species mix, additional nurse crop species must be included to provide immediate stabilization and an adequate ground cover. Rev. 5/08 6.11.19